Skip to content
Log in

Bhuvana Boulevard

4 BHK apartments by VSPR Developers · Mutsandra, near Varthur, Bengaluru

Mutsandra, near Varthur, BengaluruOpen on Google Maps (opens in a new tab)

  • Under construction
  • RERA registered
  • residential

by VSPR Developers

Price: Price on request

Get brochure, floor plans & price

Brochure, floor plans and price list for Bhuvana Boulevard

Builders share their brochure, floor plans and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Project summary

Bhuvana Boulevard is a residential project by VSPR Developers in Mutsandra, Bengaluru with 56 homes, registered with Karnataka RERA. The completion date on RERA is 31 Dec 2030. It is registered in 2 phases.

Facts collected on 20 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.

Bhuvana Boulevard buyers’ group: join to ask for a group price

No one has joined yet. Be one of the first 10 buyers in this group — the founding members.

Join free. When enough buyers have joined, our agent partner asks VSPR Developers for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.

  1. Gathering buyers
  2. Talking to the builder
  3. Group offer
  4. Group site visit
  5. Booking

0 buyers have joined · 0 committed

Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.

Join the Bhuvana Boulevard buyers’ groupHow group buying works

See it for yourself

Visit the site with our team, or get a call to clear your questions. Free, no obligation.

Key facts: home types, towers, land and possession

Updated on 20 Oct 2026
Home types
4 BHK, Villa
Carpet area
1,916 – 2,874 sq ft
Towers
2
Floors
2
Total homes
56
Land
2.83 acres
Possession (RERA)
Dec 2030
Built (RERA update)
Not found in public records yet: construction progress

Bhuvana Boulevard RERA number and registration details

RERA number
PRM/KA/RERA/1250/304/PR/170425/007676
Registered on
17 Apr 2025
Promised completion
31 Dec 2030
Extended to
No extension recorded
RERA status
Under construction
Homes booked
Not found in public records yet: homes booked
Price
Not found in public records yet: price
Project type
Residential

2 RERA registrations (one per phase) are shown together on this page; dates above are the latest across phases.

Phases and RERA numbers

PhaseRERA numberPromised completionHomesStatusSource
Phase 2PRM/KA/RERA/1250/304/PR/170425/00767631 Dec 203028Under constructionSource (rera.karnataka.gov.in) (opens in a new tab)
Phase 1PRM/KA/RERA/1250/304/PR/170425/00767731 Dec 203028Under constructionSource (rera.karnataka.gov.in) (opens in a new tab)

Towers and blocks (RERA filing)

TowerPhaseFloorsBasementsHomes
BHUVANA BOULEVARD PHASE 2Phase 22028
BHUVANA BOULEVARD PHASE 1Phase 12028

A dash (—) means the filing did not state that value.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Summary in plain English

Bhuvana Boulevard is a residential project by VSPR Developers in Mutsandra, Hosakote, with 56 homes across 2 phases. The project has 4 BHK homes and 4 BHK villas and is expected to be completed on 31 December 2030.

Written by AI from the RERA record above on 20 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.

Open space, home loans, escrow and other details

Open space
Not found in public records yet: open space
Water and power
Water source filed with RERA: Others
Home loans: approved banks
Not found in public records yet: bank approvals
Payment plans
Not found in public records yet: payment plans
Maintenance
Not found in public records yet: maintenance
Car parking
Not found in public records yet: car parking charge
Escrow bank (RERA) · Phase 2
IDFC FIRST BANK, HSR LAYOUT
Escrow bank (RERA) · Phase 1
IDFC FIRST BANK, HSR LAYOUT

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Amenities

  • Electricity
  • Outdoor Sports facility
  • Swimming Pool
  • Parks
  • Power Backup
  • Water and Sanitation

Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Bhuvana Boulevard location and address

Address
Sy no 219/1, Mutsandra Village, Anugondanahalli Hobli , Hoskote Taluk, Bangalore Rural District , Hosakote , Bengaluru Rural, Karnataka - 560087
Village (RERA)
Mutsandra
Locality
Near Varthur
PIN code
560087
City
Bengaluru
State
Karnataka
Coordinates
12.93515, 77.78004

Distances to landmarks

Not found in public records yet: landmarks

About Mutsandra

Not found in public records yet: locality facts

Commute times to tech parks and the airport

As on 5 Oct 2026
ToStraight linePeak-hour drive (estimate)
ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab)7.42 kmapprox. 30 min
Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab)10.78 kmapprox. 44 min
Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab)15.68 kmapprox. 64 min
Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab)21.42 kmapprox. 87 min
KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab)23.3 kmapprox. 94 min
Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab)30.65 kmapprox. 124 min
How we calculate

Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.

Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.

Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this

Schools and hospitals nearby

As on 5 Oct 2026

Within 2 km

  • 9Schools and colleges9 schools, 0 colleges, 0 kindergartens
  • 0Hospitals and clinics0 hospitals, 0 clinics

Nearest schools and colleges

  • Vishwa Vidyapeeth School Varthur · 1.27 km

Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Nearest metro station and railway

As on 5 Oct 2026
  • Hopefarm Channasandra (ಹೋಪ್ ಫಾರ್ಮ್ ಚನ್ನಸಂದ್ರ)Open now — nearest operating metro station6.45 km
  • Whitefield (ವೈಟ್‌ಫೀಲ್ಡ್)Nearest railway station7.1 km

Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Lake and lake-buffer check

As on 5 Oct 2026

The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 840 m from the project’s RERA map point.

The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.

The buffer rule

Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.

Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this

Satellite time-lapse of the site

Satellite photos load when you scroll to them.

Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.

Sources:Source (livingatlas.arcgis.com) (opens in a new tab)

Bhuvana Boulevard home types and carpet areas

Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.

Approved building plan3 files

Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.

Get brochure, floor plans & price

Brochure, floor plans and price list for Bhuvana Boulevard

Builders share their brochure, floor plans and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Home typeCarpet areaHomes
4 BHK1,916 – 2,874 sq ft56
4 BHK villa2,056 sq ft28

Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).

We have not collected floor-plan drawings; the builder’s sales team can share them.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Bhuvana Boulevard possession date and construction status

  • Phase 210%

    as on · 5 of 28 homes booked

  • Phase 112%

    as on · 3 of 28 homes booked

Timeline

  1. 1 Mar 2025Phase 2: Project start date given to RERA
  2. 1 Mar 2025Phase 1: Project start date given to RERA
  3. 17 Apr 2025Phase 2: Registered with Karnataka RERA
  4. 17 Apr 2025Phase 1: Registered with Karnataka RERA
  5. 31 Dec 2030Phase 2: Completion date given at registration
  6. 31 Dec 2030Phase 1: Completion date given at registration

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Construction pace from RERA quarterly filings (Phase 2)

As on 12 Oct 2026

At the average pace so far, construction would reach 100% around Dec 2040 — about 120 months after the completion date on RERA (31 Dec 2030).

This project has 2 RERA registrations; the chart uses Phase 2, the one with the most quarterly filings.

0%25%50%75%100%20262028203020322034203620382040RERA date9%10%10%10%
  • Filed on RERA
  • Average pace since start
  • RERA completion date

Quarterly filings

QuarterFiled onBuiltHomes booked
Q2 2026-27to 30 Sep 202612 Oct 202610%5 of 28
Q1 2026-27to 30 Jun 202610 Jul 202610%4 of 28
Q4 2025-26to 31 Mar 20267 Apr 202610%4 of 28
Q3 2025-26to 31 Dec 202512 Jan 20269%2 of 28
How we calculate

Average pace = % built ÷ months since the start date in the RERA record. Here: 10% ÷ 19 months (1 Mar 2025 to 30 Sep 2026) = 0.5% a month.

Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 90 ÷ 0.5 = 170.9 months → Dec 2040. This is an estimate, not a date from the builder or RERA.

Pace between filings = (10% − 9%) ÷ 9 months = 0.1% a month.

A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

Approvals and documents checklist

14 rows: approvals. Scroll inside the table to see them all.

ApprovalAuthoritySource
Building plan (Phase 2)Hoskote Planning Authority · No. HPA/CC/509/2023-24/2627 · dated 2025-01-09Source (rera.karnataka.gov.in) (opens in a new tab)
Land conversion (Phase 2)DC office, Bangalore Urban · No. 298465 · dated 2022-03-19Source (rera.karnataka.gov.in) (opens in a new tab)
Commencement Certificate (Phase 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Building Plan (Phase 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
ESCOM/Electricity (Phase 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KWSSB/Water (Phase 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KSPCB (Phase 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Building plan (Phase 1)Hoskote Planning Authority · No. HPA/CC/509/2023-24/2628 · dated 2025-01-09Source (rera.karnataka.gov.in) (opens in a new tab)
Land conversion (2 orders) (Phase 1)DC OFFICE, BANGLORE RURAL · No. 298467 and 1 more · dated 2022-03-19Source (rera.karnataka.gov.in) (opens in a new tab)
Commencement Certificate (Phase 1)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Building Plan (Phase 1)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
ESCOM/Electricity (Phase 1)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KWSSB/Water (Phase 1)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KSPCB (Phase 1)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)

Documents uploaded to RERA (Phase 2)

As on 20 Oct 2026
  • Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — Hoskote Planning Authority · No. HPA/CC/509/2023-24/2627 · dated 9 Jan 2025
  • Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Environment clearance · SEIAA KarnatakaNot on RERA yet
  • Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
  • Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Height clearance · Airports Authority of IndiaNot on RERA yet
  • Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion

From the documents the promoter uploaded to Karnataka RERA, collected 20 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). Each phase is registered separately; this list is for the phase named above. The project page on RERA lists each upload.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Bhuvana Boulevard RERA complaints

No complaints listed on Karnataka RERA for these registrations as on Source (rera.karnataka.gov.in) (opens in a new tab)

Court and consumer cases

Not found in public records yet: court cases

We list case numbers, courts and outcomes only — never names of private individuals.

About VSPR Developers

Promoter type
Partnership Firm
Projects on this site
1
RERA complaints against promoter
0
Company number (CIN)
Not found in public records yet: CIN

From Karnataka RERA, as collected so far (20 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.

VSPR Developers’s RERA record

VSPR Developers delivery record

As on 20 Oct 2026

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

What’s changed since Jan 2025

As on 20 Oct 2026
  1. 12 Oct 2026Phase 2: Quarterly update filed for Q2 2026-27: 10% built, 5 of 28 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  2. 12 Oct 2026Phase 1: Quarterly update filed for Q2 2026-27: 12% built, 3 of 28 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  3. 10 Jul 2026Phase 2: Quarterly update filed for Q1 2026-27: 10% built, 4 of 28 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  4. 10 Jul 2026Phase 1: Quarterly update filed for Q1 2026-27: 11% built, 1 of 28 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  5. 7 Apr 2026Phase 2: Quarterly update filed for Q4 2025-26: 10% built, 4 of 28 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  6. 7 Apr 2026Phase 1: Quarterly update filed for Q4 2025-26: 11% built, 1 of 28 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  7. 12 Jan 2026Phase 2: Quarterly update filed for Q3 2025-26: 9% built, 2 of 28 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  8. 12 Jan 2026Phase 1: Quarterly update filed for Q3 2025-26: 11% built, 1 of 28 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  9. 17 Apr 2025Phase 2: Registered with Karnataka RERA (PRM/KA/RERA/1250/304/PR/170425/007676); completion date 31 Dec 2030 Source (rera.karnataka.gov.in) (opens in a new tab)
  10. 17 Apr 2025Phase 1: Registered with Karnataka RERA (PRM/KA/RERA/1250/304/PR/170425/007677); completion date 31 Dec 2030 Source (rera.karnataka.gov.in) (opens in a new tab)
  11. 1 Mar 2025Phase 2: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
  12. 1 Mar 2025Phase 1: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
  13. 9 Jan 2025Phase 2: Building plan approved by Hoskote Planning Authority (No. HPA/CC/509/2023-24/2627) Source (rera.karnataka.gov.in) (opens in a new tab)
  14. 9 Jan 2025Phase 1: Building plan approved by Hoskote Planning Authority (No. HPA/CC/509/2023-24/2628) Source (rera.karnataka.gov.in) (opens in a new tab)

Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.

Home loan EMI calculator

No listed price found — enter one to try.

Example only — use your bank’s quote.

Monthly EMI
—
Down payment
—
Loan amount
—
Total interest
—

A calculation only, from the numbers you enter — not a loan offer.

All-in cost: GST, registration and other charges

The calculator loads when you scroll to it.

Assumptions
  • Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
  • GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
  • Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
  • Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
  • Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.

How we calculate this

Bhuvana Boulevard FAQs

What is Bhuvana Boulevard?

Bhuvana Boulevard is a residential project by VSPR Developers (a Partnership Firm) located in Mutsandra, Hosakote, Bengaluru Rural district, PIN 560087.

How many homes are in Bhuvana Boulevard?

The project has 56 homes across 2 phases: Phase 1 and Phase 2, each with 28 homes in 1 tower.

What home types are available in Bhuvana Boulevard?

The project offers 4 BHK homes with carpet area from 1,916 to 2,874 sq ft, and 4 BHK villas with 2,056 sq ft carpet area.

When will Bhuvana Boulevard be completed?

The project is expected to be completed on 31 December 2030 according to the RERA record.

What is the RERA registration number for Bhuvana Boulevard?

Phase 1 is registered as PRM/KA/RERA/1250/304/PR/170425/007677 and Phase 2 as PRM/KA/RERA/1250/304/PR/170425/007676, both registered on 17 April 2025.

How many homes are booked in Bhuvana Boulevard?

As of Q2 2026-27 (quarter ended 30 September 2026), 5 homes are booked in Phase 2 and 3 homes in Phase 1.

What is the construction progress of Bhuvana Boulevard?

As of Q2 2026-27, Phase 1 is 12% complete and Phase 2 is 10% complete.

Are there any RERA complaints on Bhuvana Boulevard?

There are no RERA complaints registered against this project or the builder.

Who is the escrow bank for Bhuvana Boulevard?

The escrow bank for the project is IDFC FIRST BANK.

How many projects does VSPR Developers have in the Bengaluru records?

VSPR Developers has 1 project registered in the Bengaluru RERA records.

Written by AI from the RERA record above on 20 Oct 2026. Answers use only that record; check them against the source before you decide.

Questions about Bhuvana Boulevard

No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.

Bought a home from VSPR Developers? Review the builder.

Reviews of VSPR Developers by verified buyers

No verified reviews of VSPR Developers yet. If you bought a home from them, your review helps other buyers.

How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.

Similar projects within 5 km

ProjectDistanceHomesPossession (RERA)BuiltComplaintsPrice
Whispers Of BlissVenkateswara Creators0.6 km12Dec 202665%0Not collected
RRL Palm AltezzeRRL Builders And Developers Private Limited1.1 km115Sep 203042%0Not collected
DS Max SkysampurnDS Max Properties Private Limited1.3 km615Jun 20310%0Not collected
SJ Park VilleSJ Constructions1.5 km117Dec 202920%0Not collected
Mithila SplendorSri Jagati Properties1.6 km124Oct 2026100%0Not collected
Between The GreensSurya Builders and Developers1.6 km147Dec 202920%0Not collected

Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sources and last checked dates

  1. Karnataka RERA — project register (search by the registration number) (opens in a new tab)

Collected on 20 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.

How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration numbers: PRM/KA/RERA/1250/304/PR/170425/007676, PRM/KA/RERA/1250/304/PR/170425/007677.

  • RERA record last checked: 20 Oct 2026
  • Last change in the record (registration, quarterly filing or complaint): 20 Oct 2026

How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error

More new projects nearby