DS Max Skysampurn
2 & 3 BHK apartments by DS Max Properties Private Limited · Gullakayipura, near Whitefield, Bengaluru
Gullakayipura, near Whitefield, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
DS Max Skysampurn at a glance
- Possession (RERA)Jun 2031Karnataka RERA
- Construction0% builtPromoter’s RERA update · as on 30 Sep 2026
- Homes booked34 of 615 (6%)RERA update · as on 30 Sep 2026
- RERA complaints (project)None listedKarnataka RERA · as on 18 Oct 2026
- Builder on-time record17 of 21 on time Some lateCompleted projects: OC date vs promised date
- Approvals filed8 of 9 on RERAKarnataka RERA uploads · 18 Oct 2026
- Nearest metroHopefarm Channasandra · 5.19 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 119 min at peak29.38 km straight line · estimate
- Nearest lakeUnnamed lake · 1,504 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
DS Max Skysampurn is a residential project by DS Max Properties Private Limited in Gullakayipura, Bengaluru with 615 homes, registered with Karnataka RERA. The completion date on RERA is 30 Jun 2031.
Facts collected on 18 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
DS Max Skysampurn buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks DS-Max Properties for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the DS Max Skysampurn buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 2 BHK, 3 BHK
- Carpet area
- 685 – 1,038 sq ft
- Towers
- 1
- Floors
- 16
- Total homes
- 615
- Land
- 4.63 acres
- Possession (RERA)
- Jun 2031
- Built (RERA update)
- 0%
DS Max Skysampurn RERA number and registration details
- RERA number
- PRM/KA/RERA/1250/304/PR/270726/008848
- Registered on
- 27 Jul 2026
- Promised completion
- 30 Jun 2031
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- 34 of 615 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| Tower 1 | 16 | 2 | 615 |
A dash (—) means the filing did not state that value.
Summary in plain English
DS Max Skysampurn is a residential project by DS Max Properties Private Limited in Gullakayipura, Hosakote, with 615 homes in a single 16-storey tower. The project is registered with Karnataka RERA and has a completion date of 30 June 2031.
Written by AI from the RERA record above on 18 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 81.6% of land
- Water and power
- Water source filed with RERA: BoreWell,Local Authority
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- Indian Bank, Kalyan Nagar
- Building plan (RERA)
- Hoskote Planning Authority · No. CC/625/2025-26 · dated 17 Apr 2026
- Project cost declared to RERA
- ₹148 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- CCTV Surveillance
- Club House
- Community Hall
- Outdoor Sports facility
- Indoor Sports facility
- Swimming Pool
- Gym
- Parks
- Power Backup
- Water and Sanitation
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
DS Max Skysampurn location and address
- Address
- Sy no 41/1, 41/2, 41/3 and 41/4, Katha No. 150300402001100247, Gullakayipura Village , Anugondanahalli Hobli , Hosakote , Bengaluru Rural, Karnataka - 560067
- Village (RERA)
- Gullakayipura
- Locality
- Near WhitefieldAlso known as ITPL
- PIN code
- 560067
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.94583, 77.77584
Distances to landmarks
Not found in public records yet: landmarksAbout Gullakayipura
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 6.22 km | approx. 25 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 10.54 km | approx. 43 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 16.08 km | approx. 65 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 20.37 km | approx. 83 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 22.64 km | approx. 92 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 29.38 km | approx. 119 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 7Schools and colleges7 schools, 0 colleges, 0 kindergartens
- 0Hospitals and clinics0 hospitals, 0 clinics
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Hopefarm Channasandra (ಹೋಪ್ ಫಾರ್ಮ್ ಚನ್ನಸಂದ್ರ)Open now — nearest operating metro station5.19 km
- Whitefield (ವೈಟ್ಫೀಲ್ಡ್)Nearest railway station5.84 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 1,504 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
DS Max Skysampurn floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Floor plans4 files

3 Typical 1st to 14th floor and 15th Floor plan.pdfFull PDF on RERA 
8 Typical 1st to 14th floor and 15th Floor planFiled 27 Jul 2026 · Full PDF on RERA 
10 16th Floor and Terrace floor PlanFiled 27 Jul 2026 · Full PDF on RERA 
4 16th Floor and Terrace floor Plan.pdfFull PDF on RERA
Approved building plan

Approved Building PlanFull PDF on RERA
Approved layout plan2 files

11 CDP DemarcationFiled 27 Jul 2026 · Full PDF on RERA 
12 Village MAP DemarcationFiled 27 Jul 2026 · Full PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 2 BHK | 685 – 786 sq ft | 272 |
| 3 BHK | 821 – 1,038 sq ft | 343 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
DS Max Skysampurn possession date and construction status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-14.
Units sold and unsold, from RERA (Q2 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 2 BHK | 272 | 21 | 251 |
| 3 BHK | 343 | 13 | 330 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 1 Jul 2026Project start date given to RERA
- 27 Jul 2026Registered with Karnataka RERA
- 30 Jun 2031Completion date given at registration
Approvals and documents checklist
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — Hoskote Planning Authority · No. CC/625/2025-26 · dated 17 Apr 2026
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 18 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
DS Max Skysampurn RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About DS-Max Properties
- Founded
- 2007
- Headquarters
- Bengaluru
- Bengaluru projects
- 44
- Delivered on time
- 17 of 21
- RERA complaints
- 19
- Court cases listed
- 6
DS Max Properties Private Limited (CIN U70102KA2007PTC041508) has 44 projects registered with Karnataka RERA in the Bengaluru area. Of the 21 whose records show an occupancy certificate, 17 got it on or before the completion date promised at registration, 3 got it after that date but within a COVID-19 extension, and Sky Grand got it two days after its extended date; Sunworth, Sovereign and Sahara show no OC although their dates have passed. Karnataka RERA lists 19 complaints against the promoter (14 disposed), mostly about late handover, refunds and unregistered sale agreements, and the court cases found include a 2024 High Court order directing the builder to help form a flat owners' association at DS-Max Starnest.
DS-Max Properties’s full recordDS-Max Properties delivery record
- 24Projects in Bengaluru on RERA24 approved registrations under DS Max Properties Private Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 10,303Homes registeredAs stated in each registrations.
- 19RERA complaints5 open, 14 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 1.8Complaints per 1,000 homes19 complaints ÷ 10,303 homes in its 24 registrations on Karnataka RERA in Bengaluru.
- 9Completion filed on RERARegistrations where the promoter applied to RERA for completion; 9 with an occupancy certificate on RERA.
- 3 of 9Filed by the date given at registrationMedian gap 10.1 months (on-time ones count as 0). The completion application can come after handover, so this is an upper bound on lateness.
- 6Court cases listedFound in public court records; see the list on the builder’s page.
What the complaints are about
19 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Completion filed on RERA
| Project | Date at registration | Completion filed | Gap |
|---|---|---|---|
| DS Max ShrestaOC on RERA | 31 Jul 2026 | 25 Sep 2026 | 2 months after |
| DS Max Sky ShubhamOC on RERA | 31 Mar 2027 | 11 May 2026 | By the date |
| DS Max SenateOC on RERA | 30 Jun 2026 | 11 May 2026 | By the date |
| DS Max Stavam NestOC on RERA | 30 Jun 2026 | 11 May 2026 | By the date |
| DS-Max Sky SupremeOC on RERA | 31 Dec 2023extended to 30 Sep 2024 | 2 Feb 2026 | 25 months after |
| DS Max Sonata NestOC on RERA | 30 Jun 2024 | 2 Feb 2026 | 19 months after |
| DS Max SasmaraOC on RERA | 31 Dec 2024 | 2 Feb 2026 | 13 months after |
| Sky GrandOC on RERA | 31 Mar 2023extended to 30 Dec 2024 | 31 Jan 2026 | 34 months after |
| DS Max StavamOC on RERA | 31 Mar 2025 | 31 Jan 2026 | 10 months after |
Measured against the completion date given at registration; many projects had RERA extensions (including the COVID-period extension), shown under the date.
Handovers we checked by hand
21 rows: handovers. Scroll inside the table to see them all.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)Source (indiankanoon.org) (opens in a new tab)Source (indiankanoon.org) (opens in a new tab)Source (indiankanoon.org) (opens in a new tab)Source (indiankanoon.org) (opens in a new tab)Source (indiankanoon.org) (opens in a new tab)Source (indiankanoon.org) (opens in a new tab)How we calculate this
What’s changed since Apr 2026
- 14 Oct 2026Quarterly update filed for Q2 2026-27: 0% built, 34 of 615 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 27 Jul 2026Registered with Karnataka RERA (PRM/KA/RERA/1250/304/PR/270726/008848); completion date 30 Jun 2031 Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Jul 2026Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 17 Apr 2026Building plan approved by Hoskote Planning Authority (No. CC/625/2025-26) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
DS Max Skysampurn FAQs
What is DS Max Skysampurn?
DS Max Skysampurn is a residential project with 615 homes comprising 2 BHK and 3 BHK units in Gullakayipura, Hosakote, Bengaluru Rural district.
How many homes are in DS Max Skysampurn?
The project has 615 homes: 272 units of 2 BHK and 343 units of 3 BHK.
What are the carpet areas in DS Max Skysampurn?
2 BHK homes have carpet areas between 685 and 786 sq ft; 3 BHK homes range from 821 to 1,038 sq ft.
When will DS Max Skysampurn be completed?
According to the RERA record, the project completion date is 30 June 2031.
What is the RERA registration number for DS Max Skysampurn?
The project is registered under RERA registration number PRM/KA/RERA/1250/304/PR/270726/008848.
How many storeys does DS Max Skysampurn have?
The project is a single tower with 16 floors.
How many homes are booked in DS Max Skysampurn?
As of Q2 2026-27 (quarter ended 30 September 2026), 34 homes are booked out of 615 homes.
Are there any RERA complaints against DS Max Skysampurn?
There are no RERA complaints against this project on record.
Where is DS Max Skysampurn located?
The project is in Gullakayipura, Hosakote taluk, Bengaluru Rural district, PIN code 560067.
What is the builder's RERA record?
DS Max Properties Private Limited has 44 projects in our Bengaluru RERA records and 19 RERA complaints against the builder across all projects.
Written by AI from the RERA record above on 18 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about DS Max Skysampurn
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from DS-Max Properties? Review the builder.
Reviews of DS-Max Properties by verified buyers
No verified reviews of DS-Max Properties yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| SJ Park VilleSJ Constructions | 0.3 km | 117 | Dec 2029 | 20% | 0 | Not collected |
| Mithila SplendorSri Jagati Properties | 0.9 km | 124 | Oct 2026 | 100% | 0 | Not collected |
| Whispers Of BlissVenkateswara Creators | 1.2 km | 12 | Dec 2026 | 65% | 0 | Not collected |
| Bold AspireBold Developers | 1.2 km | 162 | Dec 2026 | 85% | 0 | Not collected |
| Bhuvana BoulevardVSPR Developers | 1.3 km | 56 | Dec 2030 | — | 0 | Not collected |
| Between The GreensSurya Builders and Developers | 2 km | 147 | Dec 2029 | 20% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 18 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1250/304/PR/270726/008848.
- RERA record last checked: 18 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 18 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects nearby
Gullekaipura, near WhitefieldUnder constructionRERA registeredBuyers’ group openSJ Park Ville
by SJ Constructions
Price: Price on requestGet brochure & price →
- 4 BHK, 5 BHK, Villa
- 1,916 – 6,272 sq ft
- Dec 2029
117 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for SJ Park Ville
Gullekaipura, near VarthurUnder constructionRERA registeredBuyers’ group openMithila Splendor
by Sri Jagati Properties
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 742 – 1,015 sq ft
- Oct 2026
124 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Mithila Splendor
Muthsandra, near WhitefieldUnder constructionRERA registeredBuyers’ group openWhispers Of Bliss
by Venkateswara Creators
Price: Price on requestGet brochure & price →
- 4 BHK
- 2,165 – 3,274 sq ft
- Dec 2026
12 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Whispers Of Bliss