CENTREO by Enessen Estates & Prime One Corp

1, 2 & 3 BHK apartments by Silverstream Developers Pvt Ltd · Raghuvanahalli, Kanakapura Road, Bengaluru

Raghuvanahalli, Kanakapura Road, BengaluruOpen on Google Maps (opens in a new tab)

  • Under construction
  • RERA registered
  • RERA not updated: completion promised Mar 2026; no extension or completion filed
  • residential

by Silverstream Developers Pvt Ltd

Price: Price on request

Get brochure, floor plans & price

Brochure, floor plans and price list for CENTREO by Enessen Estates & Prime One Corp

Builders share their brochure, floor plans and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Project summary

CENTREO by Enessen Estates & Prime One Corp is a residential project by Silverstream Developers Pvt Ltd in Raghuvanahalli, Bengaluru with 252 homes, registered with Karnataka RERA. The completion date on RERA is 30 Mar 2026.

Facts collected on 13 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.

CENTREO by Enessen Estates & Prime One Corp buyers’ group: join to ask for a group price

No one has joined yet. Be one of the first 10 buyers in this group — the founding members.

Join free. When enough buyers have joined, our agent partner asks Silverstream Developers Pvt Ltd for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.

  1. Gathering buyers
  2. Talking to the builder
  3. Group offer
  4. Group site visit
  5. Booking

0 buyers have joined · 0 committed

Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.

Join the CENTREO by Enessen Estates & Prime One Corp buyers’ groupHow group buying works

See it for yourself

Visit the site with our team, or get a call to clear your questions. Free, no obligation.

Key facts: home types, towers, land and possession

Updated on 13 Oct 2026
Home types
1 BHK, 2 BHK, 3 BHK
Carpet area
517 – 1,206 sq ft
Towers
3
Floors
13
Total homes
252
Land
2.7 acres
Possession (extended)
Mar 2026
Built (RERA update)
100%

CENTREO by Enessen Estates & Prime One Corp RERA number and registration details

RERA number
PRM/KA/RERA/1251/310/PR/190823/002820
Registered on
23 Aug 2019
Promised completion
30 Jun 2023
Extended to
30 Mar 2026
RERA status
New launch
Homes booked
235 of 252 as on
Price
Not found in public records yet: price
Project type
Residential

Towers and blocks (RERA filing)

TowerFloorsBasementsHomes
Acacia13296
Banyan132102
Cypress13254

A dash (—) means the filing did not state that value.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Summary in plain English

CENTREO by Enessen Estates is a residential project by Silverstream Developers Pvt Ltd in Raghuvanahalli, Bengaluru South. The project has 252 homes across 3 towers with up to 13 floors. RERA shows a completion date of 30 March 2026.

Written by AI from the RERA record above on 5 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.

Open space, home loans, escrow and other details

Open space
92.7% of land
Water and power
Not found in public records yet: water and power
Home loans: approved banks
Not found in public records yet: bank approvals
Payment plans
Not found in public records yet: payment plans
Maintenance
Not found in public records yet: maintenance
Car parking
Not found in public records yet: car parking charge
Escrow bank (RERA)
HDFC, Kasturba Gandhi Marg Branch, 24/3,HDFC House, No.51, Kasturba Road, Bangalore 560001
Project cost declared to RERA
₹113 Cr

Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Amenities

Not found in public records yet: amenities

CENTREO by Enessen Estates & Prime One Corp location and address

Address
Sy.No: 14/2,Raghuvanahalli village,Uttarahalli Hobli,Bangalore south, Sy.No: 14/2,Raghuvanahalli village,Uttarahalli Hobli,Bangalore south
Village (RERA)
Raghuvanahalli
Locality
Kanakapura RoadAlso known as Kanakapura Main Road
City
Bengaluru
State
Karnataka
Coordinates
12.88043, 77.54533

Distances to landmarks

Not found in public records yet: landmarks

About Kanakapura Road

Not found in public records yet: locality facts

Commute times to tech parks and the airport

As on 5 Oct 2026
ToStraight linePeak-hour drive (estimate)
KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab)11.18 kmapprox. 45 min
Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab)13.41 kmapprox. 54 min
Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab)15.5 kmapprox. 63 min
Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab)20.32 kmapprox. 82 min
ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab)24.02 kmapprox. 97 min
Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab)39.57 kmapprox. 160 min
How we calculate

Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.

Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.

Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this

Schools and hospitals nearby

As on 5 Oct 2026

Within 2 km

  • 17Schools and colleges13 schools, 4 colleges, 0 kindergartens
  • 8Hospitals and clinics5 hospitals, 3 clinics

Nearest schools and colleges

  • KS Institute of Technology · 0.15 km
  • Siddaganga National School · 0.15 km
  • Hillside College of Nursing · 0.35 km

Nearest hospitals and clinics

  • Zymus Hospitals · 0.22 km
  • Aikya Healthcare · 0.29 km
  • Cloudnine Hospital · 0.61 km

Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Nearest metro station and railway

As on 5 Oct 2026
  • Vajarahalli (ವಾಜರಹಳ್ಳಿ)Open now — nearest operating metro station0.34 km
  • Jnanabharati (ಜ್ಞಾನಭಾರತಿ)Nearest railway station7.13 km

Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Lake and lake-buffer check

As on 5 Oct 2026

The nearest mapped lake is Gubbalala Kere, 387 m from the project’s RERA map point.

The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.

The buffer rule

Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.

Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this

Satellite time-lapse of the site

Satellite photos load when you scroll to them.

Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.

Sources:Source (livingatlas.arcgis.com) (opens in a new tab)

CENTREO by Enessen Estates & Prime One Corp home types and carpet areas

Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.

Get brochure, floor plans & price

Brochure, floor plans and price list for CENTREO by Enessen Estates & Prime One Corp

Builders share their brochure, floor plans and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Home typeCarpet areaHomes
1 BHK517 – 560 sq ft26
2 BHK753 – 936 sq ft106
3 BHK980 – 1,206 sq ft120

Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).

We have not collected floor-plan drawings; the builder’s sales team can share them.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

CENTREO by Enessen Estates & Prime One Corp possession date and construction status

  • Whole project (promoter’s RERA update)100%

    as on · 235 of 252 homes booked

Promoter’s quarterly update to RERA for Q4 2025-26, submitted 2026-04-08.

By tower (Q4 2025-26)

  • Acacia100%
  • Banyan100%
  • Cypress100%

Units sold and unsold, from RERA (Q4 2025-26)

TypeHomesBookedAvailable
1 BHK26224
2 BHK1069610
3 BHK1201173

As reported by the promoter in the quarterly update to RERA, not verified by us.

Timeline

  1. 22 Jul 2019Project start date given to RERA
  2. 23 Aug 2019Registered with Karnataka RERA
  3. 30 Jun 2023Completion date given at registration
  4. 30 Mar 2024Covid Extension: completion date moved to this date
  5. 30 Mar 2025Section 6 Extension: completion date moved to this date
  6. 30 Mar 2026Further Extension: completion date moved to this date

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Approvals and documents checklist

ApprovalAuthoritySource
Building planBBMP - Bruhat Bengaluru Mahanagara PalikeSource (rera.karnataka.gov.in) (opens in a new tab)

Documents uploaded to RERA

As on 13 Oct 2026
  • Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Commencement certificate · Permission to start buildingNot on RERA yet
  • Environment clearance · SEIAA KarnatakaNot on RERA yet
  • Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
  • Pollution board consent · KSPCBNot on RERA yet
  • Water and sewerage · BWSSBNot on RERA yet
  • Electricity · BESCOMNot on RERA yet
  • Height clearance · Airports Authority of IndiaNot on RERA yet
  • Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion

From the documents the promoter uploaded to Karnataka RERA, collected 13 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

CENTREO by Enessen Estates & Prime One Corp RERA complaints and orders

19 complaints as on Source (rera.karnataka.gov.in) (opens in a new tab)

19 rows: rera complaints. Scroll inside the table to see them all.

Complaint refFiledSubjectStatusSource
01113/202610 Sep 2026Return of Amount with interest and compensationUnder enquirySource (rera.karnataka.gov.in) (opens in a new tab)
00678/20269 Jun 2026Developer not refunding the amount paid by the complainantUnder enquirySource (rera.karnataka.gov.in) (opens in a new tab)
00446/202623 Apr 2026Complaint regarding delay in completion, non-provision of basic amenities and utilities, and delay in registrationDisposedSource (rera.karnataka.gov.in) (opens in a new tab)
00112/202612 Feb 2026Wilful Violation of agreement for salePosted for ordersSource (rera.karnataka.gov.in) (opens in a new tab)
01356/202510 Nov 2025The builder enforced full payment prior to the OC, citing late payment interest. No project updates shared post full payment. Deny further RERA extension and request interest on delay period.Posted for ordersSource (rera.karnataka.gov.in) (opens in a new tab)
01343/20256 Nov 2025Request to Deny Further Extension of Project.DisposedSource (rera.karnataka.gov.in) (opens in a new tab)
01347/20256 Nov 2025Request to Deny Further Extension of Project Centreo without Buyer Communication & Compensation for DelayPosted for ordersSource (rera.karnataka.gov.in) (opens in a new tab)
01341/20255 Nov 2025delayed possession, deliberately not allocating enough resources , irresponsible / no recent construction updates , collection of full money without work completion and enforcing penaltyPosted for ordersSource (rera.karnataka.gov.in) (opens in a new tab)
01340/20254 Nov 2025Request to deny furthur extension of project centreo on the grounds of non-transparancy without obtaining the consent of the allottess.make sure to complete on or before 31-03-2026.Posted for ordersSource (rera.karnataka.gov.in) (opens in a new tab)
01336/20253 Nov 2025Deny further extension without obtaining the consent of all allotees on the grounds of non-compliance with transparency obligations and failure to provide verifiable timelinesPosted for ordersSource (rera.karnataka.gov.in) (opens in a new tab)
01329/202531 Oct 2025No update on the project progress, no clear timelines for OC and registration and Request to Deny Further Extension of Project.Posted for ordersSource (rera.karnataka.gov.in) (opens in a new tab)
01325/202530 Oct 2025Request to deny further extension without consent of the home ownersPosted for ordersSource (rera.karnataka.gov.in) (opens in a new tab)
01316/202529 Oct 2025Requesting to Deny Further extension of project centreo on the grounds of non-compliance with transparency and failure to provide verifiable timelines,with out obtaing the consent of the allottesPosted for ordersSource (rera.karnataka.gov.in) (opens in a new tab)
01273/202514 Oct 2025Execute Sale Deed for 1 BHK Unit No. B803 in Centreo in favour of the complainantsPosted for ordersSource (rera.karnataka.gov.in) (opens in a new tab)
01255/20259 Oct 2025Delay in handing overpossession and for refund of the entire advance amount with interestPosted for ordersSource (rera.karnataka.gov.in) (opens in a new tab)
01185/202518 Sep 2025Delay in Completion, final payment in duress and Incorrect information presented in status mailersPosted for ordersSource (rera.karnataka.gov.in) (opens in a new tab)
00666/202522 Apr 2025Delay in Handover of Possession and Demanding for excess amountPosted for ordersSource (rera.karnataka.gov.in) (opens in a new tab)
00583/20253 Apr 2025Excessive delay, unmet deadlines & committments, seeking compensationDisposedSource (rera.karnataka.gov.in) (opens in a new tab)
CMP/221028/001013528 Oct 2022Cancellation of booking and refundDisposedSource (rera.karnataka.gov.in) (opens in a new tab)

Court and consumer cases

Not found in public records yet: court cases

We list case numbers, courts and outcomes only — never names of private individuals.

About Silverstream Developers Pvt Ltd

Promoter type
Company
Projects on this site
1
RERA complaints against promoter
19
Company number (CIN)
U70100KA2015PTC078919

From Karnataka RERA, as collected so far (13 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.

Silverstream Developers Pvt Ltd’s RERA record

Silverstream Developers Pvt Ltd delivery record

As on 13 Oct 2026

What the complaints are about

  • Delay in possession or delay interest8
  • Registration, sale deed or agreement3
  • Refund of booking or other money3
  • Other5

19 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

What’s changed since Jul 2019

As on 13 Oct 2026
  1. 10 Sep 2026Complaint 01113/2026 filed with RERA: “Return of Amount with interest and compensation” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
  2. 9 Jun 2026Complaint 00678/2026 filed with RERA: “Developer not refunding the amount paid by the complainant” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
  3. 23 Apr 2026Complaint 00446/2026 filed with RERA: “Complaint regarding delay in completion, non-provision of basic amenities and utilities, and delay in registration” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  4. 8 Apr 2026Quarterly update filed for Q4 2025-26: 100% built, 235 of 252 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  5. 31 Mar 2026Quarterly update filed for Q3 2025-26: 100% built, 235 of 252 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  6. 30 Mar 2026Completion date extended to 30 Mar 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
  7. 12 Feb 2026Complaint 00112/2026 filed with RERA: “Wilful Violation of agreement for sale” — now posted for orders Source (rera.karnataka.gov.in) (opens in a new tab)
  8. 10 Nov 2025Complaint 01356/2025 filed with RERA: “The builder enforced full payment prior to the OC, citing late payment interest. No project updates shared post full payment. Deny further RERA extension and request interest on delay period.” — now posted for orders Source (rera.karnataka.gov.in) (opens in a new tab)
  9. 6 Nov 2025Complaint 01343/2025 filed with RERA: “Request to Deny Further Extension of Project.” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  10. 6 Nov 2025Complaint 01347/2025 filed with RERA: “Request to Deny Further Extension of Project Centreo without Buyer Communication & Compensation for Delay” — now posted for orders Source (rera.karnataka.gov.in) (opens in a new tab)
  11. 5 Nov 2025Complaint 01341/2025 filed with RERA: “delayed possession, deliberately not allocating enough resources , irresponsible / no recent construction updates , collection of full money without work completion and enforcing penalty” — now posted for orders Source (rera.karnataka.gov.in) (opens in a new tab)
  12. 4 Nov 2025Complaint 01340/2025 filed with RERA: “Request to deny furthur extension of project centreo on the grounds of non-transparancy without obtaining the consent of the allottess.make sure to complete on or before 31-03-2026.” — now posted for orders Source (rera.karnataka.gov.in) (opens in a new tab)
  13. 3 Nov 2025Complaint 01336/2025 filed with RERA: “Deny further extension without obtaining the consent of all allotees on the grounds of non-compliance with transparency obligations and failure to provide verifiable timelines” — now posted for orders Source (rera.karnataka.gov.in) (opens in a new tab)
  14. 31 Oct 2025Complaint 01329/2025 filed with RERA: “No update on the project progress, no clear timelines for OC and registration and Request to Deny Further Extension of Project.” — now posted for orders Source (rera.karnataka.gov.in) (opens in a new tab)
  15. 30 Oct 2025Complaint 01325/2025 filed with RERA: “Request to deny further extension without consent of the home owners” — now posted for orders Source (rera.karnataka.gov.in) (opens in a new tab)
  16. 29 Oct 2025Complaint 01316/2025 filed with RERA: “Requesting to Deny Further extension of project centreo on the grounds of non-compliance with transparency and failure to provide verifiable timelines,with out obtaing the consent of the allottes” — now posted for orders Source (rera.karnataka.gov.in) (opens in a new tab)
  17. 14 Oct 2025Complaint 01273/2025 filed with RERA: “Execute Sale Deed for 1 BHK Unit No. B803 in Centreo in favour of the complainants” — now posted for orders Source (rera.karnataka.gov.in) (opens in a new tab)
  18. 9 Oct 2025Complaint 01255/2025 filed with RERA: “Delay in handing overpossession and for refund of the entire advance amount with interest” — now posted for orders Source (rera.karnataka.gov.in) (opens in a new tab)
  19. 18 Sep 2025Complaint 01185/2025 filed with RERA: “Delay in Completion, final payment in duress and Incorrect information presented in status mailers” — now posted for orders Source (rera.karnataka.gov.in) (opens in a new tab)
  20. 22 Apr 2025Complaint 00666/2025 filed with RERA: “Delay in Handover of Possession and Demanding for excess amount” — now posted for orders Source (rera.karnataka.gov.in) (opens in a new tab)
  21. 3 Apr 2025Complaint 00583/2025 filed with RERA: “Excessive delay, unmet deadlines & committments, seeking compensation” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  22. 28 Oct 2022Complaint CMP/221028/0010135 filed with RERA: “Cancellation of booking and refund” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  23. 23 Aug 2019Registered with Karnataka RERA (PRM/KA/RERA/1251/310/PR/190823/002820); completion date 30 Jun 2023 Source (rera.karnataka.gov.in) (opens in a new tab)
  24. 22 Jul 2019Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)

Newest first. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.

Home loan EMI calculator

No listed price found — enter one to try.

Example only — use your bank’s quote.

Monthly EMI
—
Down payment
—
Loan amount
—
Total interest
—

A calculation only, from the numbers you enter — not a loan offer.

All-in cost: GST, registration and other charges

The calculator loads when you scroll to it.

Assumptions
  • Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
  • GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
  • Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
  • Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
  • Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.

How we calculate this

CENTREO by Enessen Estates & Prime One Corp FAQs

What is the RERA registration number for CENTREO by Enessen Estates?

The RERA registration number is PRM/KA/RERA/1251/310/PR/190823/002820, registered on 23 August 2019.

What home types are available in CENTREO by Enessen Estates?

The project has 3 BHK (120 homes, carpet area 980 to 1,206 sq ft), 2 BHK (106 homes, carpet area 753 to 936 sq ft), and 1 BHK (26 homes, carpet area 517 to 560 sq ft).

When will CENTREO by Enessen Estates be completed?

RERA shows a completion date of 30 March 2026. The project has received three extensions: Covid Extension to 30 March 2024, Section 6 Extension to 30 March 2025, and Further Extension to 30 March 2026.

How many homes have been booked in CENTREO by Enessen Estates?

According to the latest quarterly update for Q4 2025-26, 235 out of 252 homes have been booked.

How much land does CENTREO by Enessen Estates occupy?

The project land area is 10,926 sq m.

Are there RERA complaints against CENTREO by Enessen Estates?

There are 19 complaints filed against this project on RERA.

How many towers are in CENTREO by Enessen Estates?

The project has 3 towers, each with up to 13 floors.

Where is CENTREO by Enessen Estates located?

CENTREO by Enessen Estates is located in Raghuvanahalli, Bengaluru South taluk, PIN code 560001.

What is the builder's record with RERA?

Silverstream Developers Pvt Ltd has 1 project in the Bengaluru RERA records and 19 complaints filed against the builder across all projects.

What is the project status on RERA?

The project status on RERA is listed as New Project Launch.

Written by AI from the RERA record above on 5 Oct 2026. Answers use only that record; check them against the source before you decide.

Questions about CENTREO by Enessen Estates & Prime One Corp

No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.

Bought a home from Silverstream Developers Pvt Ltd? Review the builder.

Reviews of Silverstream Developers Pvt Ltd by verified buyers

No verified reviews of Silverstream Developers Pvt Ltd yet. If you bought a home from them, your review helps other buyers.

How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.

Similar projects within 5 km

ProjectDistanceHomesPossession (RERA)BuiltComplaintsPrice
PoschRroyal Indraprastha Infra Private Limited0.5 km78Dec 203111%0Not collected
Assetz Meru & MeadowGokulam Shelters Private Limited1.2 km520Nov 203020%0Not collected
TG HeritageT G Developers1.6 km84Dec 2027100%0Not collected
AvalonInCiCon-AG1.6 km29Sep 202889%0Not collected
Sree Lakshmi Vallabha ResidencyShankara Vijaya Constructions LLP1.8 km132Dec 2026—0Not collected
Salarpuria Sattva Misty CharmSattva Resi Private Limited1.8 km1,339Oct 2024extended—1Not collected

Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sources and last checked dates

  1. Karnataka RERA — project register (search by the registration number) (opens in a new tab)

Collected on 13 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.

How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/310/PR/190823/002820.

  • RERA record last checked: 13 Oct 2026
  • Last change in the record (registration, quarterly filing or complaint): 10 Sep 2026

How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error

More new projects in Kanakapura Road

  • Posch: Site photo filed with Karnataka RERAGubballala, Kanakapura RoadUnder constructionRERA registeredBuyers’ group open

    Posch

    by Rroyal Indraprastha Infra

    Price: Price on requestGet brochure & price →

    • 3 BHK, 4 BHK
    • 1,141 – 1,641 sq ft
    • Dec 2031

    78 homes

    Be one of the first 10 buyers in this groupFounding members — it’s free

    Join group for Posch
  • TG Heritage: Site photo filed with Karnataka RERAMallasandra, Kanakapura RoadUnder constructionRERA registeredBuyers’ group open

    TG Heritage

    by T G Developers

    Price: Price on requestGet brochure & price →

    • 1 BHK, 2 BHK, 3 BHK
    • 489 – 971 sq ft
    • Dec 2027

    84 homes

    Be one of the first 10 buyers in this groupFounding members — it’s free

    Join group for TG Heritage