Eeshanya Aaroha
2 & 3 BHK apartments by Eeshanya Infra LLP · Vagata, Hoskote, Bengaluru
Vagata, Hoskote, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Eeshanya Aaroha at a glance
- Possession (RERA)May 2028Karnataka RERA
- Construction50% built · on pace for Dec 2027RERA filing to 30 Sep 2026; estimate from average pace
- Homes booked55 of 120 (46%)RERA update · as on 30 Sep 2026
- RERA complaints (project)None listedKarnataka RERA · as on 19 Oct 2026
- Approvals filed8 of 9 on RERAKarnataka RERA uploads · 19 Oct 2026
- Nearest metroWhitefield (Kadugodi) · 6.25 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 108 min at peak26.64 km straight line · estimate
- Nearest lakeUnnamed lake · 948 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Eeshanya Aaroha is a residential project by Eeshanya Infra LLP in Vagata, Bengaluru with 120 homes, registered with Karnataka RERA. The completion date on RERA is 31 May 2028.
Facts collected on 19 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Eeshanya Aaroha buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Eeshanya Infra LLP for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Eeshanya Aaroha buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 2 BHK, 2.5 BHK, 3 BHK
- Carpet area
- 689 – 1,040 sq ft
- Towers
- 1
- Floors
- 12
- Total homes
- 120
- Land
- 1.4 acres
- Possession (RERA)
- May 2028
- Built (RERA update)
- 50%
Eeshanya Aaroha RERA number and registration details
- RERA number
- PRM/KA/RERA/1250/304/PR/150925/008093
- Registered on
- 15 Sep 2025
- Promised completion
- 31 May 2028
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- 55 of 120 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| TOWER1 | 12 | 1 | 120 |
A dash (—) means the filing did not state that value.
Summary in plain English
Eeshanya Aaroha is a residential project by Eeshanya Infra LLP in Vagata, Hosakote, offering 120 homes in 1 tower. The project includes 2 BHK, 2.5 BHK, and 3 BHK homes with completion targeted for 31 May 2028.
Written by AI from the RERA record above on 19 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 78.7% of land
- Water and power
- Water source filed with RERA: BoreWell,Local Authority
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- Axis Bank, NALLURAHALLI
- Building plan (RERA)
- Satellite Town Ring Road Planning Authority · No. STRRPA/TP/CC/58/2025-26 · dated 9 Jul 2025
- Project cost declared to RERA
- ₹77.98 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- CCTV Surveillance
- Water and Sanitation
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Eeshanya Aaroha location and address
- Address
- Sy No 26/1, 26/4, , Vagata Village Panchayat, Kancharakanahalli Village , Hosakote , Bengaluru Rural, Karnataka - 562114
- Village (RERA)
- Vagata
- Locality
- HoskoteAlso known as Hosakote
- PIN code
- 562114
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.98666, 77.81488
Distances to landmarks
Not found in public records yet: landmarksAbout Hoskote
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 8.36 km | approx. 34 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 16.09 km | approx. 65 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 22.21 km | approx. 90 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 22.27 km | approx. 90 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 26.6 km | approx. 108 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 26.64 km | approx. 108 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 2Schools and colleges2 schools, 0 colleges, 0 kindergartens
- 0Hospitals and clinics0 hospitals, 0 clinics
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Whitefield (Kadugodi) (ವೈಟ್ಫೀಲ್ಡ್ (ಕಾಡುಗೋಡಿ))Open now — nearest operating metro station6.25 km
- Devangonthi (ದೇವನಗೊಂದಿ)Nearest railway station1.79 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 948 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 948 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,161 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,466 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Eeshanya Aaroha floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Brochure17 pages

BrochureFull PDF on RERA 






Approved building plan

Approved Building PlanFull PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 2 BHK | 689 sq ft | 48 |
| 2.5 BHK | 861 – 897 sq ft | 48 |
| 3 BHK | 1,003 – 1,040 sq ft | 24 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Eeshanya Aaroha possession date and construction status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
Units sold and unsold, from RERA (Q2 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 2 BHK | 48 | 29 | 19 |
| 2.5 BHK | 48 | 17 | 31 |
| 3 BHK | 24 | 9 | 15 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 9 Jul 2025Project start date given to RERA
- 15 Sep 2025Registered with Karnataka RERA
- 31 May 2028Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Dec 2027 — about 5 months before the completion date on RERA (31 May 2028).
At the pace between the 4 quarterly filings we have (21% → 50% in 9 months), it would be around Jan 2028 — about 5 months before the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 15 Oct 2026 | 50% | 55 of 120 |
| Q1 2026-27to 30 Jun 2026 | 15 Jul 2026 | 40% | 36 of 120 |
| Q4 2025-26to 31 Mar 2026 | 16 Apr 2026 | 24% | 30 of 120 |
| Q3 2025-26to 31 Dec 2025 | 15 Jan 2026 | 21% | 12 of 120 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 50% ÷ 14.7 months (9 Jul 2025 to 30 Sep 2026) = 3.4% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 50 ÷ 3.4 = 14.7 months → Dec 2027. This is an estimate, not a date from the builder or RERA.
Pace between filings = (50% − 21%) ÷ 9 months = 3.2% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Building plan | Satellite Town Ring Road Planning Authority · No. STRRPA/TP/CC/58/2025-26 · dated 2025-07-09 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (2 orders) | Deputy Commisioner of Bangalore Rural · No. 22469 and 1 more · dated 2024-11-20 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — Satellite Town Ring Road Planning Authority · No. STRRPA/TP/CC/58/2025-26 · dated 9 Jul 2025
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 19 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Eeshanya Aaroha RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Eeshanya Infra LLP
- Promoter type
- Partnership Firm
- Projects on this site
- 1
- RERA complaints against promoter
- 0
- Company number (CIN)
- ACC-2508
From Karnataka RERA, as collected so far (19 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Eeshanya Infra LLP’s RERA recordEeshanya Infra LLP delivery record
- 1Projects in Bengaluru on RERA1 approved registration under Eeshanya Infra LLP in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 120Homes registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 homes0 complaints ÷ 120 homes in its 1 registration on Karnataka RERA in Bengaluru.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Jul 2025
- 15 Oct 2026Quarterly update filed for Q2 2026-27: 50% built, 55 of 120 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Quarterly update filed for Q1 2026-27: 40% built, 36 of 120 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 16 Apr 2026Quarterly update filed for Q4 2025-26: 24% built, 30 of 120 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jan 2026Quarterly update filed for Q3 2025-26: 21% built, 12 of 120 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Sep 2025Registered with Karnataka RERA (PRM/KA/RERA/1250/304/PR/150925/008093); completion date 31 May 2028 Source (rera.karnataka.gov.in) (opens in a new tab)
- 9 Jul 2025Building plan approved by Satellite Town Ring Road Planning Authority (No. STRRPA/TP/CC/58/2025-26) Source (rera.karnataka.gov.in) (opens in a new tab)
- 9 Jul 2025Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Eeshanya Aaroha FAQs
What types of homes are available in Eeshanya Aaroha?
The project offers 2 BHK (48 homes, 689 sq ft carpet area), 2.5 BHK (48 homes, 861-897 sq ft carpet area), and 3 BHK (24 homes, 1,003-1,040 sq ft carpet area).
What is the RERA registration number for Eeshanya Aaroha?
The RERA registration number is PRM/KA/RERA/1250/304/PR/150925/008093, registered on 15 September 2025.
When is Eeshanya Aaroha expected to be completed?
The project completion date on RERA is 31 May 2028.
How many homes are in Eeshanya Aaroha?
The project has 120 homes in total.
What is the current construction status of Eeshyana Aaroha?
As of Q2 2026-27 (ending 30 September 2026), the project is 50% complete.
How many homes have been booked in Eeshanya Aaroha?
As of Q2 2026-27, 55 homes have been booked out of 120 homes.
Where is Eeshanya Aaroha located?
The project is in Vagata, Hosakote taluk, Bengaluru Rural district, with PIN code 562114.
Are there any RERA complaints against Eeshanya Aaroha?
There are no RERA complaints on this project or against the builder.
Who is the builder of Eeshanya Aaroha?
Eeshanya Infra LLP, a partnership firm, is the builder.
Which bank holds the escrow account for Eeshanya Aaroha?
Axis Bank holds the escrow account for this project.
Written by AI from the RERA record above on 19 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Eeshanya Aaroha
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Eeshanya Infra LLP? Review the builder.
Reviews of Eeshanya Infra LLP by verified buyers
No verified reviews of Eeshanya Infra LLP yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| United Suvarna HomesUnited Suvarna Homes | 0.2 km | 156 | Sep 2029 | 36% | 0 | Not collected |
| Provident BotanicoPuravankara Limited | 1.1 km | 1,275 | Sep 2028 | 34% | 0 | from ₹1.25 Cr |
| DS Max Sky SamuraiDS-Max Properties Private Limited | 1.2 km | 285 | Dec 2028 | 100% | 0 | Not collected |
| Provident Capella 2Puravankara Limited | 1.2 km | 345 | Jun 2025extended | — | 0 | from ₹99.9 L |
| Emmay Environs PrideEmmay environs | 2 km | 77 | Mar 2024extended | — | 0 | Not collected |
| Sowparnika AshiyanaSowparnika Projects And Infrastructure Private Limited | 2.1 km | 1,518 | Dec 2025 | — | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 19 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1250/304/PR/150925/008093.
- RERA record last checked: 19 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 19 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Hoskote
Kacharakanahalli, HoskoteUnder constructionRERA registeredBuyers’ group openUnited Suvarna Homes
by United Suvarna Homes
Price: Price on requestGet brochure & price →
- 3 BHK
- 1,029 – 1,203 sq ft
- Sep 2029
156 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for United Suvarna Homes
Devalapura, HoskoteUnder constructionRERA registeredBuyers’ group openDS Max Sky Samurai
by DS-Max Properties
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 669 – 1,140 sq ft
- Dec 2028
285 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for DS Max Sky Samurai
Devanagundi, HoskoteUnder constructionRERA registeredBuyers’ group openAr Belle Vie Phase 1
by S & S PROPERTIES and JMD
Price: Price on requestGet brochure & price →
- 4 BHK, 5 BHK, 6 BHK, Villa
- 2,151 – 21,517 sq ft
- Feb 2029
222 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Ar Belle Vie Phase 1