Embassy East Avenue
Apartments by Vigor Developments Limited · Hoodi, near Mahadevapura, Bengaluru
Hoodi, near Mahadevapura, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Embassy East Avenue at a glance
- Possession (RERA)Sep 2028Karnataka RERA
- Construction83% built · on pace for Apr 2027RERA filing to 30 Sep 2026; estimate from average pace
- Homes booked368 of 393 (94%)RERA update · as on 30 Sep 2026
- RERA complaints (project)1 complaintKarnataka RERA · as on 21 Oct 2026
- Approvals filed7 of 9 on RERAKarnataka RERA uploads · 21 Oct 2026
- Nearest metroSri Sathya Sai Hospital · 0.77 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 96 min at peak23.77 km straight line · estimate
- Nearest lakeHoodi Lake · 240 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Embassy East Avenue is a residential project by Vigor Developments Limited in Hoodi, Bengaluru with 393 homes, registered with Karnataka RERA. The completion date on RERA is 30 Sep 2028.
Facts collected on 21 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Embassy East Avenue buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Vigor Developments Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Embassy East Avenue buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 1 BHK, 1.5 BHK, 2 BHK, 2.5 BHK, +1 more
- Carpet area
- 581 – 1,444 sq ft
- Towers
- 3
- Floors
- 22
- Total homes
- 393
- Land
- 3.75 acres
- Possession (RERA)
- Sep 2028
- Built (RERA update)
- 83%
Embassy East Avenue RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/446/PR/200224/006649
- Registered on
- 20 Feb 2024
- Promised completion
- 30 Sep 2028
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- 368 of 393 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| Tower 1 | 22 | 2 | 131 |
| Tower 2 | 22 | 1 | 131 |
| Tower 3 | 22 | 1 | 131 |
A dash (—) means the filing did not state that value.
Summary in plain English
Embassy East Avenue is a residential project by Vigor Developments Limited in Hoodi, Bengaluru East, with 393 homes across 3 towers of up to 22 floors. The project is registered with RERA for completion on 30 September 2028.
Written by AI from the RERA record above on 21 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 81.7% of land
- Water and power
- Water source filed with RERA: BWSSB
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- Karnataka Bank Ltd., Minerva Circle
- Building plan (RERA)
- BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Addlr.Dir/JDNORTH/0037/23-24 · dated 1 Feb 2024
- Project cost declared to RERA
- ₹399 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- Club House with Swimming Pool
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Embassy East Avenue location and address
- Address
- KATHA NO. 272, OLD NO. 401/245, SY NO. 197 OF HOODI VILLAGE , K R PURAM, WARD NO. 82 , Bengaluru East , Bengaluru Urban, Karnataka - 560066
- Village (RERA)
- Hoodi
- Locality
- Near Mahadevapura
- PIN code
- 560066
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.98809, 77.72689
Distances to landmarks
Not found in public records yet: landmarksAbout Hoodi
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 1.18 km | approx. 5 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 8.7 km | approx. 35 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 13.38 km | approx. 54 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 16.79 km | approx. 68 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 17.08 km | approx. 69 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 23.77 km | approx. 96 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 23Schools and colleges11 schools, 7 colleges, 5 kindergartens
- 8Hospitals and clinics8 hospitals, 0 clinics
Nearest schools and colleges
- Jain University School of Allied Healthcare & Sciences · 0.74 km
- Government Primary School · 0.97 km
- Gopalan International Schoool · 0.97 km
Nearest hospitals and clinics
- Manipal Hospitals Whitefield · 0.2 km
- Healing Hands Clinic - Whitefield, Bengaluru · 0.32 km
- Cloud Nine Hospital · 0.55 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Sri Sathya Sai Hospital (ಶ್ರೀ ಸತ್ಯ ಸಾಯಿ ಆಸ್ಪತ್ರೆ)Open now — nearest operating metro station0.77 km
- Hoodi Nearest railway station1.2 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Hoodi Lake, 240 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Hoodi Lake on OpenStreetMap (opens in a new tab) (ಸೀತಾರಾಮಪಾಳ್ಯ ಕೆರೆ)240 m
- Kodigehalli Lake on OpenStreetMap (opens in a new tab) (ಕೊಡಿಗೇಹಳ್ಳಿ ಕೆರೆ)1,055 m
- Pattandur Agrahara Kunte on OpenStreetMap (opens in a new tab) (ಪಟ್ಟಂದೂರು ಅಗ್ರಹಾರ ಕುಂಟೆ)1,380 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Embassy East Avenue home types and carpet areas
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Approved building plan17 pages

Approved Building/Plotting PlanFull PDF on RERA
Approved layout plan2 files

Location Demarcation.pdfFull PDF on RERA 
Village Map Demarcation.pdfFull PDF on RERA
Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.
Get brochure, floor plans & price| Home type | Carpet area | Homes |
|---|---|---|
| 1 bedroom - a4(a) | 581 sq ft | 1 |
| 1 bedroom - b1(a) | 608 sq ft | 2 |
| 1 bedroom - b2(a) | 632 sq ft | 1 |
| 1 bedroom - c1(a) | 725 sq ft | 1 |
| 1.5 bedroom - c1(b) | 811 sq ft | 1 |
| 2 bedroom - a1 | 736 sq ft | 45 |
| 2 bedroom - a2 | 758 sq ft | 44 |
| 2 bedroom - a3 | 743 sq ft | 90 |
| 2 bedroom - a4 | 780 sq ft | 20 |
| 2.5 bedroom - b1 | 919 sq ft | 40 |
| 2.5 bedroom - b2 | 944 sq ft | 21 |
| 3 bedroom - c1 | 1,086 sq ft | 58 |
| 3 bedroom - c1(c) | 1,444 sq ft | 1 |
| 3 bedroom - c1(d) | 1,444 sq ft | 2 |
| 3 bedroom - c2 | 1,086 sq ft | 22 |
| 3 bedroom - c2(a) | 1,418 sq ft | 1 |
| 3 bedroom - c3 | 1,086 sq ft | 22 |
| 3 bedroom - c3(a) | 1,418 sq ft | 1 |
| 3 bedroom - c4 | 1,086 sq ft | 19 |
| 3 bedroom - c4(a) | 1,415 sq ft | 1 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Embassy East Avenue possession date and construction status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
By tower (Q2 2026-27)
Units sold and unsold, from RERA (Q2 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 1 BEDROOM - C1(A) | 1 | 0 | 1 |
| 1 BEDROOM - A4(A) | 1 | 1 | 0 |
| 1 BEDROOM - B2(A) | 1 | 1 | 0 |
| 1.5 BEDROOM - C1(B) | 1 | 1 | 0 |
| 2 BEDROOM - A1 | 45 | 44 | 1 |
| 2 BEDROOM - A4 | 20 | 19 | 1 |
| 2.5 BEDROOM - B2 | 21 | 20 | 1 |
| 3 BEDROOM - C1 | 58 | 56 | 2 |
| 3 BEDROOM - C1(C) | 1 | 1 | 0 |
| 3 BEDROOM - C4 | 19 | 18 | 1 |
| 3 BEDROOM - C4(A) | 1 | 0 | 1 |
| 1 BEDROOM - B1(A) | 2 | 2 | 0 |
| 2 BEDROOM - A2 | 44 | 42 | 2 |
| 2 BEDROOM - A3 | 90 | 81 | 9 |
| 2.5 BEDROOM - B1 | 40 | 38 | 2 |
| 3 BEDROOM - C1(D) | 2 | 1 | 1 |
| 3 BEDROOM - C2 | 22 | 19 | 3 |
| 3 BEDROOM - C2(A) | 1 | 1 | 0 |
| 3 BEDROOM - C3 | 22 | 22 | 0 |
| 3 BEDROOM - C3(A) | 1 | 1 | 0 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 20 Feb 2024Registered with Karnataka RERA
- 1 Mar 2024Project start date given to RERA
- 30 Sep 2028Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Apr 2027 — about 18 months before the completion date on RERA (30 Sep 2028).
At the pace between the 4 quarterly filings we have (62% → 83% in 9 months), it would be around May 2027 — about 17 months before the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 15 Oct 2026 | 83% | 368 of 393 |
| Q1 2026-27to 30 Jun 2026 | 15 Jul 2026 | 78% | 379 of 393 |
| Q4 2025-26to 31 Mar 2026 | 14 Apr 2026 | 70% | 370 of 393 |
| Q3 2025-26to 31 Dec 2025 | 14 Jan 2026 | 62% | 368 of 393 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 83% ÷ 31 months (1 Mar 2024 to 30 Sep 2026) = 2.7% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 17 ÷ 2.7 = 6.3 months → Apr 2027. This is an estimate, not a date from the builder or RERA.
Pace between filings = (83% − 62%) ÷ 9 months = 2.3% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
16 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Building plan | BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Addlr.Dir/JDNORTH/0037/23-24 · dated 2024-02-01 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion | DC Office, Bengaluru · No. ALN SR [N] 167/1989-90, ALN SR [E] 229/2004-05 · dated 2013-03-27 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Change of Land Use | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| District Magistrate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approval/NOC under section 109 of KLR Act 1961 | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Addlr.Dir/JDNORTH/0037/23-24 · dated 1 Feb 2024
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Pollution board consent · KSPCBNot on RERA yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 21 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Embassy East Avenue RERA complaints and orders
1 complaint as on Source (rera.karnataka.gov.in) (opens in a new tab)
| Complaint ref | Filed | Subject | Status | Source |
|---|---|---|---|---|
| 01133/2025 | 6 Sep 2025 | unfair trade practice | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Vigor Developments Limited
- Promoter type
- Company
- Projects on this site
- 1
- RERA complaints against promoter
- 1
- Company number (CIN)
- U70109KA2021PTC146385
From Karnataka RERA, as collected so far (21 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Vigor Developments Limited’s RERA recordVigor Developments Limited delivery record
- 1Projects in Bengaluru on RERA1 approved registration under Vigor Developments Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 393Homes registeredAs stated in each registrations.
- 1RERA complaints0 open, 1 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 2.5Complaints per 1,000 homes1 complaints ÷ 393 homes in its 1 registration on Karnataka RERA in Bengaluru.
What the complaints are about
1 complaint subject as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Feb 2024
- 15 Oct 2026Quarterly update filed for Q2 2026-27: 83% built, 368 of 393 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Quarterly update filed for Q1 2026-27: 78% built, 379 of 393 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Apr 2026Quarterly update filed for Q4 2025-26: 70% built, 370 of 393 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Jan 2026Quarterly update filed for Q3 2025-26: 62% built, 368 of 393 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 6 Sep 2025Complaint 01133/2025 filed with RERA: “unfair trade practice” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Mar 2024Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 20 Feb 2024Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/200224/006649); completion date 30 Sep 2028 Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Feb 2024Building plan approved by BBMP - Bruhat Bengaluru Mahanagara Palike (No. BBMP/Addlr.Dir/JDNORTH/0037/23-24) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Embassy East Avenue FAQs
What is the RERA registration number for Embassy East Avenue?
The RERA registration number is PRM/KA/RERA/1251/446/PR/200224/006649, registered on 20 February 2024.
When will Embassy East Avenue be completed?
The completion date on RERA is 30 September 2028.
How many homes are in Embassy East Avenue?
The project has 393 homes across 3 towers.
What home types are available in Embassy East Avenue?
The project offers 1 bedroom, 1.5 bedroom, 2 bedroom, 2.5 bedroom, and 3 bedroom homes with carpet areas ranging from 581 sq ft to 1,444 sq ft.
What is the construction progress of Embassy East Avenue?
As of Q2 2026-27 (quarter ended 30 September 2026), the project is 83% complete.
How many homes are booked in Embassy East Avenue?
As of Q2 2026-27, 368 homes are booked out of 393 homes.
Where is Embassy East Avenue located?
The project is located in Hoodi, Bengaluru East taluk, Bengaluru Urban district, PIN code 560066.
How many RERA complaints have been filed against Embassy East Avenue?
There is 1 RERA complaint on this project.
Who is the builder of Embassy East Avenue?
The builder is Vigor Developments Limited, a company.
How many other projects does Vigor Developments Limited have on RERA record?
Vigor Developments Limited has 1 project in the Karnataka RERA records for Bengaluru, with 1 complaint filed against the builder across all projects.
Written by AI from the RERA record above on 21 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Embassy East Avenue
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Vigor Developments Limited? Review the builder.
Reviews of Vigor Developments Limited by verified buyers
No verified reviews of Vigor Developments Limited yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Pursuit Of A Radical RhapsodyTotal Environment Habitat Private Limited | 0.7 km | 715 | Dec 2029extended | — | 5 | Not collected |
| Vikyath ElegantVikyath Properties Pvt Ltd | 1 km | 80 | Dec 2025 | — | 0 | Not collected |
| Jai Kings LandJai Shelters | 1.1 km | 378 | Dec 2028 | — | 0 | Not collected |
| Sri Balaji GrandSri Balaji Shelters | 1.2 km | 60 | Jun 2027 | 49% | 0 | Not collected |
| Jai SignatureJai Shelters , H.A.Venugopal & 10 Others | 1.2 km | 50 | Mar 2028 | — | 0 | Not collected |
| Jai Fortune SquareJai Builders | 1.3 km | 136 | Dec 2025 | — | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 21 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/446/PR/200224/006649.
- RERA record last checked: 21 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 21 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects nearby
Hoodi, MahadevapuraUnder constructionRERA registeredBuyers’ group openPursuit Of A Radical Rhapsody
by Total Environment Habitat
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK, 4 BHK, 5 BHK
- 846 – 18,056 sq ft
- Dec 2029 (extended)
4 phases on RERA · 715 homes · 5 RERA complaints
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Pursuit Of A Radical Rhapsody
Hoodi, MahadevapuraReady to moveRERA registeredBuyers’ group openVikyath Elegant
by Vikyath Properties
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 649 – 1,103 sq ft
- Dec 2025
80 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Vikyath Elegant
Hoodi, near MahadevapuraUnder constructionRERA registeredBuyers’ group openJai Signature
by Jai Shelters , H.A.Venugopal & 10 Others
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 418 – 723 sq ft
- Mar 2028
50 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Jai Signature