GM Global Techies Town
2 & 3 BHK apartments by M/s.Gulam Mustafa Enterprises Pvt Ltd · Thirupalya, Electronic City Phase 1, Bengaluru
Thirupalya, Electronic City Phase 1, Bengaluru
- Under construction
- RERA registered
- residential
by M/s.Gulam Mustafa Enterprises Pvt Ltd
Price: Price on request
Project summary
GM Global Techies Town is a residential project by M/s.Gulam Mustafa Enterprises Pvt Ltd in Thirupalya, Bengaluru with 4,176 homes, registered with Karnataka RERA. The completion date on RERA is 18 Nov 2026. It is registered in 3 phases.
Not in the RERA record we collected yet: map location. This page fills in as the record is collected.
Facts collected on 15 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
GM Global Techies Town buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks M/s.Gulam Mustafa Enterprises Pvt Ltd for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the GM Global Techies Town buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 2 BHK, 3 BHK
- Carpet area
- 630 – 1,225 sq ft
- Towers
- 3
- Floors
- 31
- Total homes
- 4,176
- Land
- 25.68 acres
- Possession (extended)
- Nov 2026
- Built (RERA update)
- Not found in public records yet: construction progress
GM Global Techies Town RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/308/PR/170928/001289
- Registered on
- 28 Sep 2017
- Promised completion
- 9 Jun 2024
- Extended to
- 18 Nov 2026
- RERA status
- New launch
- Homes booked
- Not found in public records yet: homes booked
- Price
- Not found in public records yet: price
- Project type
- Residential
3 RERA registrations (one per phase) are shown together on this page; dates above are the latest across phases.
Phases and RERA numbers
| Phase | RERA number | Promised completion | Homes | Status | Source |
|---|---|---|---|---|---|
| Tower C | PRM/KA/RERA/1251/308/PR/170928/001289 | 18 Aug 2021Extended to 18 May 2023 | 1,416 | Under construction | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Tower- A | PRM/KA/RERA/1251/308/PR/170928/001304 | 18 Feb 2022Extended to 18 Nov 2026 | 1,406 | Under construction | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Tower-B (Tower-2 | PRM/KA/RERA/1251/308/PR/180627/001941 | 9 Jun 2024Extended to 9 Mar 2026 | 1,354 | New launch | Source (rera.karnataka.gov.in) (opens in a new tab) |
Towers and blocks (RERA filing)
| Tower | Phase | Floors | Basements | Homes |
|---|---|---|---|---|
| C | Tower C | 31 | 2 | 1,416 |
| Tower A | Tower- A | 31 | 2 | 1,406 |
| Tower B | Tower-B (Tower-2 | 31 | 2 | 1,354 |
A dash (—) means the filing did not state that value.
Summary in plain English
GM Global Techies Town is a residential project by M/s. Gulam Mustafa Enterprises Pvt Ltd in Anekal, Bengaluru Urban, with 4,176 homes across 3 towers. Tower C is scheduled for completion on 18 May 2023, Tower A on 18 November 2026, and Tower B on 9 March 2026.
Written by AI from the RERA record above on 15 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- Not found in public records yet: open space
- Water and power
- Not found in public records yet: water and power
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA) · Tower C
- HDFC, BTM Layout
- Escrow bank (RERA) · Tower- A
- HDFC, BTM Layout
- Escrow bank (RERA) · Tower-B (Tower-2
- HDFC, BTM Layout
Amenities
GM Global Techies Town location and address
- Address
- Electronic City, Thirupalya, Jigani Hobli
- Village (RERA)
- Thirupalya
- Locality
- Electronic City Phase 1Also known as Electronic City, Electronics City, E-City
- PIN code
- 560095
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- Not found in public records yet: coordinates
Distances to landmarks
Not found in public records yet: landmarksAbout Electronic City Phase 1
Not found in public records yet: locality factsGM Global Techies Town home types and carpet areas
Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.
Get brochure, floor plans & price| Home type | Carpet area | Homes |
|---|---|---|
| 2 BHK | 630 – 805 sq ft | 2,462 |
| 3 BHK | 1,050 – 1,225 sq ft | 1,714 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
GM Global Techies Town possession date and construction status
Timeline
- 18 Feb 2017Tower C: Project start date given to RERA
- 18 Feb 2017Tower- A: Project start date given to RERA
- 28 Sep 2017Tower C: Registered with Karnataka RERA
- 28 Sep 2017Tower- A: Registered with Karnataka RERA
- 9 Jun 2018Tower-B (Tower-2: Project start date given to RERA
- 27 Jun 2018Tower-B (Tower-2: Registered with Karnataka RERA
- 18 Aug 2021Tower C: Completion date given at registration
- 18 Feb 2022Tower- A: Completion date given at registration
- 18 May 2022Tower C: Covid Extension: completion date moved to this date
- 18 Nov 2022Tower- A: Covid Extension: completion date moved to this date
- 18 May 2023Tower C: Section 6 Extension: completion date moved to this date
- 18 Nov 2023Tower- A: Section 6 Extension: completion date moved to this date
- 9 Jun 2024Tower-B (Tower-2: Completion date given at registration
- 9 Mar 2025Tower-B (Tower-2: Covid Extension: completion date moved to this date
- 9 Mar 2026Tower-B (Tower-2: Section 6 Extension: completion date moved to this date
- 18 Nov 2026Tower- A: Further Extension: completion date moved to this date
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Building plan (Tower C) | KIADB - Karnataka Industrial Areas Development Board | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Building plan (Tower- A) | KIADB - Karnataka Industrial Areas Development Board | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Building plan (Tower-B (Tower-2) | KIADB - Karnataka Industrial Areas Development Board | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA (Tower C)
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Commencement certificate · Permission to start buildingNot on RERA yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBNot on RERA yet
- Water and sewerage · BWSSBNot on RERA yet
- Electricity · BESCOMNot on RERA yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 15 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). Each phase is registered separately; this list is for the phase named above. The project page on RERA lists each upload.
GM Global Techies Town RERA complaints and orders
182 complaints as on Source (rera.karnataka.gov.in) (opens in a new tab)
182 rows: rera complaints. Scroll inside the table to see them all.
| Complaint ref | Filed | Subject | Status | Source |
|---|---|---|---|---|
| 01233/2026 | 14 Oct 2026 | Delayed Construction - No Information a no progress communicated or shared | Scrutiny completed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 01080/2026 | 31 Aug 2026 | Delay in completing the building for occupency purose and not providing electricity to the Complainants apartment due to which the Complainant is having loss of income. | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 01009/2026 | 14 Aug 2026 | Possession with Delayed compensation | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00918/2026 | 29 Jul 2026 | refund of advance sale cosideration along with interest and compensation | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00906/2026 | 28 Jul 2026 | Breach of Agreement | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00790/2026 | 6 Jul 2026 | Possession is delayed. I seek compensation from builder. | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00674/2026 | 9 Jun 2026 | Complaint under Section 18 of the Real Estate (Regulation and Development) Act, 2016 seeking cancellation, refund, interest and compensation due to inordinate delay in possession by the promoter. | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00625/2026 | 1 Jun 2026 | Delay in completing the project and breach of agreement | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00581/2026 | 25 May 2026 | Complaint Against Builder for Delay in Project Handover – Request for Compensation | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00514/2026 | 12 May 2026 | Project stalled and delayed by more than 3 years | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00471/2026 | 5 May 2026 | Unjustified 90% Disbursement on a 30% Incomplete Skeleton Structure, Concealment of Title Defects, and Complete Failure to Hand Over Possession of Unit C1633. | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00394/2026 | 15 Apr 2026 | Project delayed from the builder | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00339/2026 | 6 Apr 2026 | Denial of possession even after 8 years of allotment and 2 years of registration | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00325/2026 | 31 Mar 2026 | Delay in flat C2641 handover with registration | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00196/2026 | 2 Mar 2026 | refund of money | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00195/2026 | 2 Mar 2026 | Refund of earnest money along with 18% interest | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00051/2026 | 20 Jan 2026 | Exit from the Project and Refund | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00050/2026 | 20 Jan 2026 | Exit from the Project and Refund | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 01456/2025 | 8 Dec 2025 | Possession of flat and compensation for delay | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 01459/2025 | 8 Dec 2025 | delivery of possession of schedule B and C Properties and delay compensation | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 01328/2025 | 31 Oct 2025 | Cancellation and refund request regarding Property at GM Infinite Tower C 2441 | Posted for orders | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 01289/2025 | 17 Oct 2025 | Delayed Possession – Reliefs Sought – Direction from the Authority – Completion of Project – Execution of Sale Deed in Favour of the Complainant | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 01028/2025 | 21 Aug 2025 | Issue with Flat Registration / Refund | Posted for orders | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00975/2025 | 29 Jul 2025 | Delay in Possession of Flat in GM Global Techies Town Tower C Despite Completion of Registration in March 2024 and Promised Handover in 2021 | Posted for orders | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00791/2025 | 29 May 2025 | Fraudulent Double Registration of Flat C-2447 by GM Global Techies Town and Non-Refund of Payment | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00783/2025 | 28 May 2025 | Project is not delivered within the agreed date, its overdue more than 2 years. No response from the builder. | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00520/2025 | 19 Mar 2025 | Prolonged Delay in Possession & Request for Interest on Delay Period | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00460/2025 | 11 Mar 2025 | Delayed Possession | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00399/2025 | 7 Mar 2025 | Project/flat is incomplete and stands undelivered as of today, violation of sale agreement, refund of principle along interest | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00203/2025 | 27 Jan 2025 | Flat not completed by Builder | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00174/2025 | 23 Jan 2025 | Complaint for Delay in handover of the possession and for Refund | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00154/2025 | 21 Jan 2025 | Complaint under RERA for Refund of Booking Amount with interest - GM GLOBAL TECHIES TOWN TOWER- A | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00026/2025 | 4 Jan 2025 | Unreasonable delay by developer in registration & handover of flat | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 01357/2024 | 26 Dec 2024 | GTT Tower C is still not completed, after a delay of 5 years | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 01289/2024 | 18 Dec 2024 | Project is stalled - asking for full refund of booking amount with interest | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 01268/2024 | 30 Nov 2024 | Return of full amount with interest | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 01205/2024 | 19 Nov 2024 | Delay in construction and intention to cheat | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 01206/2024 | 19 Nov 2024 | Delay in construction and intention to cheat | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 01153/2024 | 13 Nov 2024 | Compensation for delay in construction and handover | Disposed ao | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 01131/2024 | 12 Nov 2024 | Request for Refund amount paid towards flat agreement, advance amount with compensation | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 01038/2024 | 19 Oct 2024 | Non adherence to delivery date and refund of amount | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 01003/2024 | 15 Oct 2024 | Booking Amount Not Refunded | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00896/2024 | 17 Sep 2024 | Delayed construction in progress | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00864/2024 | 10 Sep 2024 | Insolvency/Bankruptcy of Builder "Gulam Mustafa Enterprises Pvt Ltd" and thereafter retention of Buyers details/rights by RERA across project handover to other promoter/builder/party | Posted for orders | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00796/2024 | 26 Aug 2024 | Complaint Seeking Registration of Apartment, Execution of Sale Deed, Completion of Unit, and Transfer of Khata | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00781/2024 | 22 Aug 2024 | Complaint claiming Refund of Entire Sale Consideration Amount | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00755/2024 | 20 Aug 2024 | RERA Approval Expired- Seeking refund of the advance amount of Rs 200000/-. | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00673/2024 | 8 Jul 2024 | Delayed possession and no cooperation from the Builder | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00654/2024 | 2 Jul 2024 | Delay in completion of the project | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00643/2024 | 27 Jun 2024 | Project delivery is delayed far beyond the committed deadlines | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00606/2024 | 18 Jun 2024 | interest on delay period | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00590/2024 | 14 Jun 2024 | Urgent Request for Intervention from RERA Authority Regarding Delayed Completion and Compensation for Flat Purchase | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00568/2024 | 11 Jun 2024 | refund of amount with interest | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00561/2024 | 10 Jun 2024 | Refund Required | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00539/2024 | 4 Jun 2024 | Please Refund our booking amount | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00419/2024 | 29 Apr 2024 | Interest compensation due to delay in project | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00393/2024 | 17 Apr 2024 | Refund of booking amount on cancellation | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00363/2024 | 8 Apr 2024 | Refund & compensation | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00350/2024 | 2 Apr 2024 | Interest on delay period | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00328/2024 | 27 Mar 2024 | Interest on delay period | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00311/2024 | 25 Mar 2024 | Interest on delay period | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00299/2024 | 21 Mar 2024 | No refund given after booking amount paid. Refused to sign the agreement for the booked unit. | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00297/2024 | 20 Mar 2024 | delay in project | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00285/2024 | 15 Mar 2024 | interest on delay period and cancellation of notice serve by Builder | Posted for orders | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00241/2024 | 29 Feb 2024 | Nearly 2 years delay in delivery from promised delivery date,Refund with compensation of paid amount against the flat and settlement on home loan | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00231/2024 | 26 Feb 2024 | Delay in Possession | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00161/2024 | 3 Feb 2024 | Complaint for refund of rs 7,40,000/- along with interest and compensation | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00131/2024 | 30 Jan 2024 | Flat is not delivered as per the agreement | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00088/2024 | 19 Jan 2024 | Project is not delivered in time as per the agreement. | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00084/2024 | 18 Jan 2024 | paid 6.2 lacs for A2416 on 23rd Dec 2023. No calls have been responded after taking the money | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00076/2024 | 18 Jan 2024 | Not returning refundable deposit | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00062/2024 | 17 Jan 2024 | Persistent Delays and Lack of Clear Completion Roadmap for project - Request for Compensation | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00034/2024 | 10 Jan 2024 | Delivery/ possession of the Flats to the Allottee | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00035/2024 | 10 Jan 2024 | Delivery/ possession of the Flats to the Allottee | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00038/2024 | 10 Jan 2024 | Persistent Delays and Lack of Clear Completion Roadmap for project - Request for Compensation | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00046/2024 | 10 Jan 2024 | Aggrieved by non delivery of possession of property, seeking for Compensation (Reference Complaint Temporary Application No : TMP/240108/0004711) | Disposed ao | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00039/2024 | 10 Jan 2024 | Aggrieved by expiry of delivery of possession of property, seeking to refund the entire amount paid along with interest | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00017/2024 | 5 Jan 2024 | Delay compensation from the RERA registration expiry date | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00022/2024 | 5 Jan 2024 | Refund of advance booking amount | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 01862/2023 | 21 Dec 2023 | Refund of the Deposited Amount | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 01858/2023 | 20 Dec 2023 | Delay in Handover of Apt No C2017 in GM Global Techies Town | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 01820/2023 | 9 Dec 2023 | Not getting refund | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 01765/2023 | 28 Nov 2023 | Refund of my booking amount of 2 lakhs | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 01761/2023 | 27 Nov 2023 | Booking amount of 2 lac has not been refunded | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 01706/2023 | 15 Nov 2023 | Refund of booking amount | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 01578/2023 | 11 Oct 2023 | Builder is not giving legal documents for verification and instead asked me to cancel the booking with them by keeping my booking amount | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 01570/2023 | 10 Oct 2023 | Not refunding booking amount even after cancellation | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 01373/2023 | 8 Sep 2023 | Refund of Advance amount | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 01320/2023 | 1 Sep 2023 | Return of amount | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 01304/2023 | 1 Sep 2023 | Project is Incomplete | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 01274/2023 | 21 Aug 2023 | Delayed Possession and Denied to pay compensation | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 01266/2023 | 19 Aug 2023 | Compensation for the delay | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 01232/2023 | 9 Aug 2023 | Delay in delivery of flat as per committed date | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 01224/2023 | 5 Aug 2023 | Incomplete Project and Delayed Possession Complaint | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 01114/2023 | 20 Jul 2023 | Refund my amount and settlement of SBI home loan asap | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 01115/2023 | 20 Jul 2023 | The delivery of flat is delayed beyond expectation leads to uncertainty and financial loss | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00997/2023 | 28 Jun 2023 | Refund with compensation of paid amount against the flat | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 01017/2023 | 28 Jun 2023 | Delay in project completion, handover and compensation to buyers | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00947/2023 | 21 Jun 2023 | Request for refund of token money - unable to provide loan with the national bank of 90% | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00897/2023 | 5 Jun 2023 | Delivery of flat with delay compensation | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00878/2023 | 2 Jun 2023 | Refund of security deposit | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00791/2023 | 20 May 2023 | Project Delivery Date Expiry and No compensation provided | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00700/2023 | 6 May 2023 | Delay compensation | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00686/2023 | 6 May 2023 | Delay in Delivery of Flat A2318 | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00701/2023 | 6 May 2023 | Delay compensation | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00601/2023 | 28 Apr 2023 | Not refunding the advance booking amount | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00453/2023 | 10 Apr 2023 | Refund of Expression of interest(EOI) | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00155/2023 | 2 Feb 2023 | Delay in allotment of flat, no delivery date given by builder and no compensation given | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00131/2023 | 31 Jan 2023 | Booking amount refund issue | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00116/2023 | 24 Jan 2023 | The Delivery date extended by one More year, excluded the 9 months extension by RERA | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00086/2023 | 17 Jan 2023 | Refund of booking amount on cancellation | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00058/2023 | 10 Jan 2023 | Nearly 2 years delay in delivery from promised delivery date | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00036/2023 | 9 Jan 2023 | Delay in the handover/completion of the project | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00030/2023 | 6 Jan 2023 | Delay Compensation | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00024/2023 | 5 Jan 2023 | Compensation for delay and completion of construction | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00025/2023 | 5 Jan 2023 | Global Techies Town Tower A - Possession delay and no compensation from builder. | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/221227/0010537 | 27 Dec 2022 | Delay Possession and refused to pay compensation | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/221221/0010506 | 21 Dec 2022 | Refund of Booking amount on cancelation | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/221220/0010492 | 20 Dec 2022 | Delay compensation from the RERA registration expiry date | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/221117/0010354 | 17 Nov 2022 | Delay Compensation | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/221029/0010140 | 29 Oct 2022 | Request for Refund of Amount paid with Interest | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220922/0010043 | 22 Sep 2022 | I need to have compensation for delay from builder as the project is delayed | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220920/0010033 | 20 Sep 2022 | Delay Compensation | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220914/0010012 | 14 Sep 2022 | Delay Compensation | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220913/0010006 | 13 Sep 2022 | Delay in handover and non payment of compensation | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220912/0010004 | 12 Sep 2022 | Regarding Delay compensation-Flat No C-0136-1150 sqft In GLOBAL TECHIES TOWN E CITY | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220908/0009992 | 8 Sep 2022 | Delay Compensation & No Handover/delayed project | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220908/0009993 | 8 Sep 2022 | Delay in handover and non payment of compensation | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220908/0009987 | 8 Sep 2022 | Delay Compensation | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220907/0009983 | 7 Sep 2022 | Project completion , delivery of flat and compensation for bank interest and delay | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220907/0009984 | 7 Sep 2022 | Delay compesation | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220907/0009982 | 7 Sep 2022 | Return of Amount and compensation | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220902/0009973 | 2 Sep 2022 | Completion delay and Compensation | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220902/0009970 | 2 Sep 2022 | GM Infinite not keeping their promises to customers | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220830/0009961 | 30 Aug 2022 | Compensation | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220829/0009958 | 29 Aug 2022 | Compensation for delayed project | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220825/0009934 | 25 Aug 2022 | Delay Compensation | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220822/0009928 | 22 Aug 2022 | Delay Compensation | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220818/0009910 | 18 Aug 2022 | Delay Compensation | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220818/0009909 | 18 Aug 2022 | Delay in posession and registration | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220817/0009905 | 17 Aug 2022 | Delay Compensation | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220816/0009899 | 16 Aug 2022 | Delay compensation | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220816/0009901 | 16 Aug 2022 | Delay compensation | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220816/0009895 | 16 Aug 2022 | Delay Compensation | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220816/0009898 | 16 Aug 2022 | Project is Delayed and No Transparency at all | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220816/0009894 | 16 Aug 2022 | Delayed delivery of flat possession | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220811/0009864 | 11 Aug 2022 | Delayed compensation | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220811/0009877 | 11 Aug 2022 | Delay in Handover | Disposed ao | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220801/0009831 | 1 Aug 2022 | Delay Compensation | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220726/0009816 | 26 Jul 2022 | Delay in completion of project GM Global Techies Town C | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220726/0009815 | 26 Jul 2022 | Delay compensation | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220726/0009817 | 26 Jul 2022 | Payment of compensation from the date of expiry of the delivery date till the actual delivery date | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220725/0009810 | 25 Jul 2022 | Delay Compensation | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220722/0009792 | 22 Jul 2022 | Delay Compensation | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220720/0009780 | 20 Jul 2022 | Delay compensation | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220720/0009775 | 20 Jul 2022 | Delay in handover of the Apartment | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220720/0009776 | 20 Jul 2022 | Delay Compensation | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220720/0009783 | 20 Jul 2022 | Delivery Delayed and Compensations | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220719/0009766 | 19 Jul 2022 | Delay Compensation | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220719/0009761 | 19 Jul 2022 | Apartment not delivered on promised date | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220719/0009763 | 19 Jul 2022 | Builder is not following the agreement. | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220715/0009753 | 15 Jul 2022 | Delay Compensation | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220713/0009745 | 13 Jul 2022 | Delay Compensation | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220707/0009727 | 7 Jul 2022 | Delayed completion and delivery of possession | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220704/0009715 | 4 Jul 2022 | Delay in project completion and handover and compensation to buyers | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220624/0009675 | 24 Jun 2022 | Delivery Date Expired Which Was 18-05-2022 | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220614/0009623 | 14 Jun 2022 | Delay in handover and compensation to buyers | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220607/0009598 | 7 Jun 2022 | Delay Compensation post expiration of Date of Completion of the project. | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220606/0009592 | 6 Jun 2022 | Delay compensation | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220603/0009583 | 3 Jun 2022 | GM GLOBAL TECHIES TOWN TOWER C (PRM/KA/RERA/1251/308/PR/170928/001289) - Delayed | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220603/0009584 | 3 Jun 2022 | Delayed project | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220601/0009565 | 1 Jun 2022 | GM Global Techies Town Tower C project delayed | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220531/0009550 | 31 May 2022 | Delayed Compensation | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220531/0009553 | 31 May 2022 | Project Delay | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220525/0009532 | 25 May 2022 | Project is stalled, looking for immediate possession of Flat and Compensation | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220525/0009530 | 25 May 2022 | Delay in project completion | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220523/0009507 | 23 May 2022 | Need monthly compensation for delay | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220209/0008999 | 9 Feb 2022 | Booking Amount Refund of Rs. 1 Lakh. | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/211113/0008552 | 13 Nov 2021 | Refund not done for blocking amount after cancellation | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/191221/0003014 | 21 Dec 2019 | Flat given to different customer without notice and taking booking installment with fake promises | Disposed ao | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/191020/0004270 | 20 Oct 2019 | Cheat / Fraud by GM Infinite - Bangalore | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/190218/0002184 | 18 Feb 2019 | Amount to be refunded due to non compliance of words | Disposed ao | Source (rera.karnataka.gov.in) (opens in a new tab) |
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About M/s.Gulam Mustafa Enterprises Pvt Ltd
- Promoter type
- Company
- Projects on this site
- 1
- RERA complaints against promoter
- 223
- Company number (CIN)
- U70100KA1982PTC004720
From Karnataka RERA, as collected so far (15 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
M/s.Gulam Mustafa Enterprises Pvt Ltd’s RERA recordM/s.Gulam Mustafa Enterprises Pvt Ltd delivery record
- 1Projects in Bengaluru on RERA3 approved registrations under M/s.Gulam Mustafa Enterprises Pvt Ltd in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 4,176Homes registeredAs stated in each registrations.
- 223RERA complaints33 open, 190 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 53.4Complaints per 1,000 homes223 complaints ÷ 4,176 homes in its 3 registrations on Karnataka RERA in Bengaluru.
What the complaints are about
223 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Feb 2017
- 18 Nov 2026Tower- A: Completion date extended to 18 Nov 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Oct 2026Complaint 01233/2026 filed with RERA: “Delayed Construction - No Information a no progress communicated or shared” — now scrutiny completed Source (rera.karnataka.gov.in) (opens in a new tab)
- 31 Aug 2026Complaint 01080/2026 filed with RERA: “Delay in completing the building for occupency purose and not providing electricity to the Complainants apartment due to which the Complainant is having loss of income.” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Aug 2026Complaint 01009/2026 filed with RERA: “Possession with Delayed compensation” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 29 Jul 2026Complaint 00918/2026 filed with RERA: “refund of advance sale cosideration along with interest and compensation” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 28 Jul 2026Complaint 00906/2026 filed with RERA: “Breach of Agreement” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 6 Jul 2026Complaint 00790/2026 filed with RERA: “Possession is delayed. I seek compensation from builder.” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 9 Jun 2026Complaint 00674/2026 filed with RERA: “Complaint under Section 18 of the Real Estate (Regulation and Development) Act, 2016 seeking cancellation, refund, interest and compensation due to inordinate delay in possession by the promoter.” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Jun 2026Complaint 00625/2026 filed with RERA: “Delay in completing the project and breach of agreement” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 25 May 2026Complaint 00581/2026 filed with RERA: “Complaint Against Builder for Delay in Project Handover – Request for Compensation” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 12 May 2026Complaint 00514/2026 filed with RERA: “Project stalled and delayed by more than 3 years” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 5 May 2026Complaint 00471/2026 filed with RERA: “Unjustified 90% Disbursement on a 30% Incomplete Skeleton Structure, Concealment of Title Defects, and Complete Failure to Hand Over Possession of Unit C1633.” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Complaint 00394/2026 filed with RERA: “Project delayed from the builder” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 6 Apr 2026Complaint 00339/2026 filed with RERA: “Denial of possession even after 8 years of allotment and 2 years of registration” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 31 Mar 2026Complaint 00325/2026 filed with RERA: “Delay in flat C2641 handover with registration” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 9 Mar 2026Tower-B (Tower-2: Completion date extended to 9 Mar 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
- 2 Mar 2026Complaint 00196/2026 filed with RERA: “refund of money” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 2 Mar 2026Complaint 00195/2026 filed with RERA: “Refund of earnest money along with 18% interest” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 20 Jan 2026Complaint 00051/2026 filed with RERA: “Exit from the Project and Refund” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 20 Jan 2026Complaint 00050/2026 filed with RERA: “Exit from the Project and Refund” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 8 Dec 2025Complaint 01456/2025 filed with RERA: “Possession of flat and compensation for delay” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 8 Dec 2025Complaint 01459/2025 filed with RERA: “delivery of possession of schedule B and C Properties and delay compensation” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 31 Oct 2025Complaint 01328/2025 filed with RERA: “Cancellation and refund request regarding Property at GM Infinite Tower C 2441” — now posted for orders Source (rera.karnataka.gov.in) (opens in a new tab)
- 17 Oct 2025Complaint 01289/2025 filed with RERA: “Delayed Possession – Reliefs Sought – Direction from the Authority – Completion of Project – Execution of Sale Deed in Favour of the Complainant” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 21 Aug 2025Complaint 01028/2025 filed with RERA: “Issue with Flat Registration / Refund” — now posted for orders Source (rera.karnataka.gov.in) (opens in a new tab)
- 29 Jul 2025Complaint 00975/2025 filed with RERA: “Delay in Possession of Flat in GM Global Techies Town Tower C Despite Completion of Registration in March 2024 and Promised Handover in 2021” — now posted for orders Source (rera.karnataka.gov.in) (opens in a new tab)
- 29 May 2025Complaint 00791/2025 filed with RERA: “Fraudulent Double Registration of Flat C-2447 by GM Global Techies Town and Non-Refund of Payment” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 28 May 2025Complaint 00783/2025 filed with RERA: “Project is not delivered within the agreed date, its overdue more than 2 years. No response from the builder.” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 19 Mar 2025Complaint 00520/2025 filed with RERA: “Prolonged Delay in Possession & Request for Interest on Delay Period” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 11 Mar 2025Complaint 00460/2025 filed with RERA: “Delayed Possession” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. Showing the latest 30 of 191 dated events. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
GM Global Techies Town FAQs
What are the RERA registration numbers for GM Global Techies Town?
The three registrations are: Tower C (PRM/KA/RERA/1251/308/PR/170928/001289), Tower A (PRM/KA/RERA/1251/308/PR/170928/001304), and Tower B (PRM/KA/RERA/1251/308/PR/180627/001941).
How many homes are in GM Global Techies Town?
The project has 4,176 homes in total: 1,416 in Tower C, 1,406 in Tower A, and 1,354 in Tower B.
What home types are available in GM Global Techies Town?
The project offers 2 BHK homes with carpet area from 630 to 805 sq ft, and 3 BHK homes with carpet area from 1,050 to 1,225 sq ft.
When is GM Global Techies Town expected to be completed?
Tower C completion is 18 May 2023, Tower A is 18 November 2026, and Tower B is 9 March 2026.
What extensions have been given for GM Global Techies Town?
Tower C received a Covid extension to 18 May 2022 and a Section 6 extension to 18 May 2023. Tower A received extensions for Covid (18 November 2022), Section 6 (18 November 2023), and further extension (18 November 2026). Tower B received Covid extension to 9 March 2025 and Section 6 extension to 9 March 2026.
How many RERA complaints are filed on GM Global Techies Town?
There are 182 complaints on the project: 112 on Tower C, 66 on Tower A, and 4 on Tower B.
How many RERA complaints are against the builder M/s. Gulam Mustafa Enterprises Pvt Ltd?
There are 223 complaints against the builder across all projects on the RERA record.
Where is GM Global Techies Town located?
The project is located in Anekal taluk, Bengaluru Urban district, with PIN code 560095.
What is the project status of GM Global Techies Town on RERA?
Tower C and Tower A are marked as Ongoing, and Tower B is marked as New Project Launch.
How many towers does GM Global Techies Town have?
The project has 3 towers, each with a maximum of 31 floors.
Written by AI from the RERA record above on 15 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about GM Global Techies Town
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from M/s.Gulam Mustafa Enterprises Pvt Ltd? Review the builder.
Reviews of M/s.Gulam Mustafa Enterprises Pvt Ltd by verified buyers
No verified reviews of M/s.Gulam Mustafa Enterprises Pvt Ltd yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Sources and last checked dates
Collected on 15 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration numbers: PRM/KA/RERA/1251/308/PR/170928/001289, PRM/KA/RERA/1251/308/PR/170928/001304, PRM/KA/RERA/1251/308/PR/180627/001941.
- RERA record last checked: 15 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 15 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Electronic City Phase 1
Margandanahalli, Electronic City Phase 1Under constructionRERA registeredBuyers’ group openAgani Velocity
by Agani
Price: Price on requestGet brochure & price →
- 2 BHK, 2.5 BHK, 3 BHK
- 689 – 1,087 sq ft
- Dec 2030
60 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Agani Velocity
Veerasandra, Electronic City Phase 1Under constructionRERA registeredBuyers’ group openAyatana Residences E-City
by Aratt One World
Price: Price on requestGet brochure & price →
- 3 BHK, 4 BHK
- 1,272 – 1,613 sq ft
- Jun 2029
166 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Ayatana Residences E-City
Doddanagamangala, Electronic City Phase 1Under constructionRERA registeredBuyers’ group openMy Buildcon Serene
by My Buildcon
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 717 – 1,022 sq ft
- Jun 2027
149 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for My Buildcon Serene