Godrej Woodland
30×30, 30×40 +2 more plots by Godrej Properties Ltd · Thiruvaranga, Bengaluru
Thiruvaranga, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- plotted
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Godrej Woodland at a glance
- Completion (RERA)Dec 2026 ExtendedWas Dec 2025 · Karnataka RERA
- Construction89% built · on pace for Jun 2027 5 mo after RERA dateRERA filing to 30 Sep 2026 (Main registration); estimate from average pace
- RERA complaints (project)32 complaintsKarnataka RERA · as on 17 Oct 2026
- Approvals filed3 of 9 on RERAKarnataka RERA uploads · 17 Oct 2026
- Nearest metroHopefarm Channasandra · 12.91 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 146 min at peak35.99 km straight line · estimate
Project summary
Godrej Woodland is a plotted development by Godrej Properties Ltd in Thiruvaranga, Bengaluru with 1,025 plots, registered with Karnataka RERA. The completion date on RERA is 31 Dec 2026. It is registered in 2 phases.
Facts collected on 17 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the developer pays us a commission.
Godrej Woodland buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Godrej Properties Ltd for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the developer offers and book directly with the developer if you want to. Free for buyers. If you book through us, the developer pays us a commission.
- Gathering buyers
- Talking to the developer
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, plot size and timeline with us on a call; developers negotiate with them. Joining is free and never obliges you to buy.
Join the Godrej Woodland buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: plot sizes, approval, land and completion
- Plot sizes (feet)
- 30×30, 30×40, 30×50, 30×60
- Plot area
- 855 – 6,354 sq ft
- Total plots
- 1,025
- Layout approved by
- BMRDA
- Land
- Not found in public records yet: land area
- Land conversion orders
- 1
- Completion (extended)
- Dec 2026
- Development (RERA update)
- Not found in public records yet: development progress
Plot sizes (RERA filing)
| Size (feet) | Area | Plots |
|---|---|---|
| 30×30 | 900 sq ft | 127 |
| 30×40 | 1,200 sq ft | 263 |
| 30×50 | 1,500 sq ft | 163 |
| 30×60 | 1,800 sq ft | 106 |
| Odd-sized (irregular) | varies | 366 |
Sizes as filed with RERA, converted from metres to feet (9.14 m = 30 ft, 12.19 m = 40 ft). Ask the developer which plots are still unsold.
Approving authority as filed: BMRDA - Bangalore Metropolitan Region Development Authority.
Land conversion orders (RERA filing)
| Phase | Survey no. | Converted for | Order | By |
|---|---|---|---|---|
| Phase 2 | SY NO. 24/2, 26/1, 26/2, 31/2, 31/3 & 53/1 THIRUVARANGA VILLAGE | Residential | No. ALN(HOS.A)C.R/18/2021-22, 10 Nov 2021 | Rural DC |
RERA does not cover each plot’s khata. Ask the developer for the khata and title documents and have a lawyer check them before paying an advance.
Godrej Woodland RERA number and registration details
- RERA number
- PRM/KA/RERA/1250/304/PR/210208/003856
- Registered on
- 8 Feb 2021
- Promised completion
- 31 Dec 2025
- Extended to
- 31 Dec 2026
- RERA status
- New launch
- Plots booked
- Not found in public records yet: plots booked
- Price
- Not found in public records yet: price
- Project type
- Plotted
2 RERA registrations (one per phase) are shown together on this page; dates above are the latest across phases.
Phases and RERA numbers
| Phase | RERA number | Promised completion | Plots | Status | Source |
|---|---|---|---|---|---|
| Main registration | PRM/KA/RERA/1250/304/PR/210208/003856 | 31 Dec 2025Extended to 31 Dec 2026 | 900 | New launch | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Phase 2 | PRM/KA/RERA/1250/304/PR/020922/005201 | 31 Dec 2025Extended to 31 Dec 2026 | 125 | New launch | Source (rera.karnataka.gov.in) (opens in a new tab) |
Summary in plain English
Godrej Woodland is a plotted layout by Godrej Properties Ltd in Thiruvaranga, Hosakote, with 1,025 plots across two RERA registrations. The layout is approved by BMRDA and was originally scheduled for completion on 31 December 2025, extended to 31 December 2026. As of Q2 2026-27, the development is 89% complete.
Written by AI from the RERA record above on 17 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, loans, escrow and other details
- Open space
- Not found in public records yet: open space
- Water and power
- Water source filed with RERA: BWSSB
- Plot loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA) · Main registration
- Axis Bank, Majestic Branch
- Escrow bank (RERA) · Phase 2
- Axis Bank, Bangalore
Amenities
Godrej Woodland location and address
- Address
- Sy.No. 19, 25, 31/1, 32, 33, 34, 35/1, 35/2, 37, 38/1, 38/2 , Thiruvaranga Village, Anugondanahalli Hobli, Hoskote Taluk
- Village (RERA)
- Thiruvaranga
- PIN code
- 400050
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.90391, 77.83682
Distances to landmarks
Not found in public records yet: landmarksAbout Thiruvaranga
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 14.21 km | approx. 58 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 17.01 km | approx. 69 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 19.58 km | approx. 79 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 28.46 km | approx. 115 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 30.12 km | approx. 122 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 35.99 km | approx. 146 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 1Schools and colleges1 schools, 0 colleges, 0 kindergartens
- 0Hospitals and clinics0 hospitals, 0 clinics
Nearest schools and colleges
- New Macoulay School · 1.69 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Hopefarm Channasandra (ಹೋಪ್ ಫಾರ್ಮ್ ಚನ್ನಸಂದ್ರ)Open now — nearest operating metro station12.91 km
- Devangonthi (ದೇವನಗೊಂದಿ)Nearest railway station9.05 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Godrej Woodland layout plan and plot types as filed
Documents the developer uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Approved layout plan

Phase 2: Approved Layout PlanFull PDF on RERA
Layout plan and brochure not published? The developer shares them only on request. We’ll get the brochure, layout plan and current price list for you, free.
Get brochure, layout plan & price| Plot type (as filed) | Area | Plots |
|---|---|---|
| Plot 30 m × 40 m | 691 sq ft | 245 |
| Plot 30 m × 50 m | 1,500 sq ft | 154 |
| Plot 30 m × 60 m | 1,800 sq ft | 94 |
| Plot 30 m × 30 m | 900 sq ft | 127 |
| Plot 30 m × 40 m | — | 18 |
| Plot 30 m × 50 m | — | 9 |
| Plot 30 m × 60 m | — | 12 |
| Odd plots | 1,718 sq ft | 280 |
| Odd-shaped plots | — | 86 |
Plot types and counts as filed with Karnataka RERA.
We have not collected the layout plan drawing; the developer’s sales team can share it.
Godrej Woodland completion date and development status
Timeline
- 1 Jan 2021Main registration: Project start date given to RERA
- 8 Feb 2021Main registration: Registered with Karnataka RERA
- 22 Jun 2022Phase 2: Project start date given to RERA
- 2 Sep 2022Phase 2: Registered with Karnataka RERA
- 31 Dec 2025Main registration: Completion date given at registration
- 31 Dec 2025Phase 2: Completion date given at registration
- 31 Dec 2026Main registration: Section 6 Extension: completion date moved to this date
- 31 Dec 2026Phase 2: Section 6 Extension: completion date moved to this date
Construction pace from RERA quarterly filings (Main registration)
At the average pace so far, construction would reach 100% around Jun 2027 — about 5 months after the completion date on RERA (31 Dec 2026).
At the pace between the 4 quarterly filings we have (86% → 89% in 9 months), it would be around Jun 2029 — about 30 months after the RERA date.
This project has 2 RERA registrations; the chart uses Main registration, the one with the most quarterly filings.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Developed | Plots booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 15 Oct 2026 | 89% | — |
| Q1 2026-27to 30 Jun 2026 | 15 Jul 2026 | 88% | — |
| Q4 2025-26to 31 Mar 2026 | 13 Apr 2026 | 87% | — |
| Q3 2025-26to 31 Dec 2025 | 13 Jan 2026 | 86% | — |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 89% ÷ 68.9 months (1 Jan 2021 to 30 Sep 2026) = 1.3% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 11 ÷ 1.3 = 8.5 months → Jun 2027. This is an estimate, not a date from the builder or RERA.
Pace between filings = (89% − 86%) ÷ 9 months = 0.3% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Layout plan (Main registration) | BMRDA - Bangalore Metropolitan Region Development Authority | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Layout plan (Phase 2) | BMRDA - Bangalore Metropolitan Region Development Authority · No. STRRPA/TA/LAO/33/2021-22 · dated 2022-03-31 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (Phase 2) | Rural DC · No. ALN(HOS.A)C.R/18/2021-22 · dated 2021-11-10 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA (Phase 2)
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BMRDA - Bangalore Metropolitan Region Development Authority · No. STRRPA/TA/LAO/33/2021-22 · dated 31 Mar 2022
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBNot on RERA yet
- Water and sewerage · BWSSBNot on RERA yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 17 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). Each phase is registered separately; this list is for the phase named above. The project page on RERA lists each upload.
Godrej Woodland RERA complaints and orders
32 complaints as on Source (rera.karnataka.gov.in) (opens in a new tab)
32 rows: rera complaints. Scroll inside the table to see them all.
| Complaint ref | Filed | Subject | Status | Source |
|---|---|---|---|---|
| 01093/2026 | 2 Sep 2026 | Seeking delay interest | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 01061/2026 | 25 Aug 2026 | delay of handing over the plots with all ameneties as agreed in the agreement | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 01059/2026 | 25 Aug 2026 | delay of handing over the plots with all ameneties as agreed in the agreement | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 01058/2026 | 25 Aug 2026 | delay of handing over the plots with all ameneties as agreed in the agreement | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 01060/2026 | 25 Aug 2026 | delay of handing over the plots with all ameneties as agreed in the agreement | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00959/2026 | 5 Aug 2026 | Complaint under section 31 of the real estate (regulation and development) act, 2016 read with rule 35(1) of the karnataka real estate (regulation and development) rules, 2017 | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00677/2026 | 9 Jun 2026 | scrutiny raised by the Hon'ble Authority in directing the Complainant to furnish the construction agreement or sale agreement executed between the parties. That the Complainant respectfully submits th | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00665/2026 | 6 Jun 2026 | delay of handing over the plots along with ammenities as agreed as per agreement | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00490/2026 | 11 May 2026 | delay of handing over the plots along with agreed amenities as agreed in the agreement | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00491/2026 | 11 May 2026 | delay of handing over the plots along with agreed amenities as agreed in the agreement | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00495/2026 | 11 May 2026 | delay of handing over the plots along with agreed in the agreement | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00494/2026 | 11 May 2026 | delay of handing over the plots along with agreed in the agreement | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00493/2026 | 11 May 2026 | delay of handing over the plots along with agreed in the agreement | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00492/2026 | 11 May 2026 | delay of handing over the plots along with agreed in the agreement | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00489/2026 | 11 May 2026 | delay of handing over the plots along with agreed amenities as agreed in the agreement | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00415/2026 | 18 Apr 2026 | delay of handing over the plots along with agreed amenities as agreed in the agreement | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00416/2026 | 18 Apr 2026 | delay of handing over the plots along with agreed amenities as agreed in the agreement | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00384/2026 | 15 Apr 2026 | delay of handing over the plots along with agreed amenities as agreed in the agreement | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00383/2026 | 15 Apr 2026 | delay of handing over the plots along with agreed ameneties as agreed in the agreement | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00378/2026 | 10 Apr 2026 | delay of handing over the plots along with agreed amenities as agreed in the agreement | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00376/2026 | 10 Apr 2026 | delay of handing over the plots along with agreed amenities as agreed in the agreement | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00375/2026 | 10 Apr 2026 | delay of handing over the plots along with agreed amenities as agreed in the agreement | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00379/2026 | 10 Apr 2026 | delay of handing over the plots along with agreed amenities as agreed in the agreement | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00382/2026 | 10 Apr 2026 | delay of handing over the plots along with agreed amenities as agreed in the agreement | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00373/2026 | 9 Apr 2026 | delay of handing over the plots along with agreed amenities as agreed in the agreement | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00363/2026 | 8 Apr 2026 | inordinate and illegal delay in handing over possession of the allotted plot as agreed in the sale deed by providing all the basic amenities, despite having received the full sale consideration. | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00362/2026 | 8 Apr 2026 | delay of handing over the plots along with agreed in the agreement | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00336/2026 | 4 Apr 2026 | delay of handing over the plots along with agreed in the agreement | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00315/2026 | 27 Mar 2026 | delay of handing over the plots with all ameneties as agreed in the agreement | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00818/2023 | 23 May 2023 | Complaint filed u/s 31 of the real estate (regulation and development) act, 2016 | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00621/2023 | 2 May 2023 | Greed for Money, Zero customer relationship and threating to pay without following the RERA guidelines | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/211112/0008548 | 12 Nov 2021 | As no bank is approving the project i have no confidence to for loan with landers like godrej housing finance / i wish to proceed with bank only for plot loan | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Godrej Properties Ltd
- Promoter type
- Company
- Projects on this site
- 20
- RERA complaints against promoter
- 65
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (17 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Godrej Properties Ltd’s RERA recordGodrej Properties Limited delivery record
- 20Projects in Bengaluru on RERA26 approved registrations under Godrej Properties Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 21,984Homes and plots registeredAs stated in each registrations.
- 65RERA complaints33 open, 32 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 3Complaints per 1,000 homes and plots65 complaints ÷ 21,984 homes and plots in its 26 registrations on Karnataka RERA in Bengaluru.
What the complaints are about
65 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Jan 2021
- 31 Dec 2026Main registration: Completion date extended to 31 Dec 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
- 31 Dec 2026Phase 2: Completion date extended to 31 Dec 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Oct 2026Main registration: Quarterly update filed for Q2 2026-27: 89% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Oct 2026Phase 2: Quarterly update filed for Q2 2026-27: 89% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 2 Sep 2026Complaint 01093/2026 filed with RERA: “Seeking delay interest” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 25 Aug 2026Complaint 01061/2026 filed with RERA: “delay of handing over the plots with all ameneties as agreed in the agreement” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 25 Aug 2026Complaint 01059/2026 filed with RERA: “delay of handing over the plots with all ameneties as agreed in the agreement” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 25 Aug 2026Complaint 01058/2026 filed with RERA: “delay of handing over the plots with all ameneties as agreed in the agreement” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 25 Aug 2026Complaint 01060/2026 filed with RERA: “delay of handing over the plots with all ameneties as agreed in the agreement” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 5 Aug 2026Complaint 00959/2026 filed with RERA: “Complaint under section 31 of the real estate (regulation and development) act, 2016 read with rule 35(1) of the karnataka real estate (regulation and development) rules, 2017” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Main registration: Quarterly update filed for Q1 2026-27: 88% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Phase 2: Quarterly update filed for Q1 2026-27: 88% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 9 Jun 2026Complaint 00677/2026 filed with RERA: “scrutiny raised by the Hon'ble Authority in directing the Complainant to furnish the construction agreement or sale agreement executed between the parties. That the Complainant respectfully submits th” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 6 Jun 2026Complaint 00665/2026 filed with RERA: “delay of handing over the plots along with ammenities as agreed as per agreement” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 11 May 2026Complaint 00490/2026 filed with RERA: “delay of handing over the plots along with agreed amenities as agreed in the agreement” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 11 May 2026Complaint 00491/2026 filed with RERA: “delay of handing over the plots along with agreed amenities as agreed in the agreement” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 11 May 2026Complaint 00495/2026 filed with RERA: “delay of handing over the plots along with agreed in the agreement” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 11 May 2026Complaint 00494/2026 filed with RERA: “delay of handing over the plots along with agreed in the agreement” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 11 May 2026Complaint 00493/2026 filed with RERA: “delay of handing over the plots along with agreed in the agreement” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 11 May 2026Complaint 00492/2026 filed with RERA: “delay of handing over the plots along with agreed in the agreement” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 11 May 2026Complaint 00489/2026 filed with RERA: “delay of handing over the plots along with agreed amenities as agreed in the agreement” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 18 Apr 2026Complaint 00415/2026 filed with RERA: “delay of handing over the plots along with agreed amenities as agreed in the agreement” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 18 Apr 2026Complaint 00416/2026 filed with RERA: “delay of handing over the plots along with agreed amenities as agreed in the agreement” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Complaint 00384/2026 filed with RERA: “delay of handing over the plots along with agreed amenities as agreed in the agreement” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Complaint 00383/2026 filed with RERA: “delay of handing over the plots along with agreed ameneties as agreed in the agreement” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 13 Apr 2026Main registration: Quarterly update filed for Q4 2025-26: 87% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 13 Apr 2026Phase 2: Quarterly update filed for Q4 2025-26: 87% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 10 Apr 2026Complaint 00378/2026 filed with RERA: “delay of handing over the plots along with agreed amenities as agreed in the agreement” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 10 Apr 2026Complaint 00376/2026 filed with RERA: “delay of handing over the plots along with agreed amenities as agreed in the agreement” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 10 Apr 2026Complaint 00375/2026 filed with RERA: “delay of handing over the plots along with agreed amenities as agreed in the agreement” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. Showing the latest 30 of 47 dated events. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Plot loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
Godrej Woodland FAQs
What are the plot sizes in Godrej Woodland?
The main registration offers plots of 30×40 sq ft (1,200 sq ft), 30×50 sq ft (1,500 sq ft), 30×30 sq ft (900 sq ft), and 30×60 sq ft (1,800 sq ft). Phase 2 has plots of 30×40 sq ft (1,200 sq ft), 30×60 sq ft (1,800 sq ft), and 30×50 sq ft (1,500 sq ft). Both phases also include odd-sized plots.
How many plots are in Godrej Woodland?
There are 1,025 plots total: 900 in the main registration and 125 in Phase 2.
Who approved the layout for Godrej Woodland?
The layout was approved by BMRDA (Bengaluru Metropolitan Region Development Authority).
What are the RERA registration numbers for Godrej Woodland?
The main registration number is PRM/KA/RERA/1250/304/PR/210208/003856 (registered 8 February 2021) and Phase 2 is PRM/KA/RERA/1250/304/PR/020922/005201 (registered 2 September 2022).
When is Godrej Woodland expected to be completed?
The completion date on RERA is 31 December 2026, extended from the original date of 31 December 2025 under Section 6 Extension.
What is the development progress of Godrej Woodland?
As of Q2 2026-27 (quarter ended 30 September 2026), the layout development is 89% complete.
How many RERA complaints are there on Godrej Woodland?
There are 32 complaints on the project: 31 on the main registration and 1 on Phase 2.
Where is Godrej Woodland located?
The project is in Thiruvaranga, Hosakote taluk, Bengaluru Rural district, PIN code 400050.
What is the developer's track record?
Godrej Properties Ltd has 65 complaints across all its projects in the RERA Bengaluru records and 12 projects registered with RERA in Bengaluru.
How many land conversion orders are there for Godrej Woodland?
Phase 2 has 1 land conversion order. The main registration does not mention land conversion orders in the RERA record.
Written by AI from the RERA record above on 17 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Godrej Woodland
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a plot from Godrej Properties Ltd? Review the developer.
Reviews of Godrej Properties Ltd by verified buyers
No verified reviews of Godrej Properties Ltd yet. If you bought a plot from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the developer may reply.
Similar projects within 5 km
| Project | Distance | Plots | Completion (RERA) | Developed | Complaints | Price |
|---|---|---|---|---|---|---|
| Roman OrchardRoman Developers | 1.6 km | 664 | Dec 2026 | — | 0 | Not collected |
| KNS LaurelNeelanchal Landholdings LLP | 3.2 km | 220 | Jul 2026 | — | 0 | Not collected |
| Lavender MeadowsTerrafem Group LLP | 3.3 km | 137 | Dec 2025 | — | 1 | Not collected |
| Avalon CountyLand Capital Arkashree Developers | 3.3 km | 76 | Dec 2027 | 100% | 0 | Not collected |
| BrundavanVishnu Kiran Kasa | 3.7 km | 28 | Dec 2024 | — | 0 | Not collected |
| Sai Metro City 9th PhaseSai Reniit Projects Pvt Ltd | 3.9 km | 129 | Nov 2026 | — | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the developer’s own website where we found one.
Sources and last checked dates
Collected on 17 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration numbers: PRM/KA/RERA/1250/304/PR/210208/003856, PRM/KA/RERA/1250/304/PR/020922/005201.
- RERA record last checked: 17 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 17 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the developer’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects nearby
Baguru, HoskoteUnder constructionRERA registeredBuyers’ group openRoman Orchard
by Roman
Price: Price on requestGet brochure & price →
- 30×40, 30×50
- 969 – 10,450 sq ft plots
- Approved by Local Planning Authority
- Dec 2026
664 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Roman Orchard
Muguluru, near SarjapurUnder constructionRERA registeredBuyers’ group openKNS Laurel
by Neelanchal Landholdings
Price: Price on requestGet brochure & price →
- 20×30, 30×37, 30×40 +3 more
- 600 – 30,871 sq ft plots
- Approved by BMRDA
- Jul 2026
RERA not updated since promised Jul 2026 · 2 phases on RERA · 220 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for KNS Laurel
Kuguru, near SarjapurUnder constructionRERA registeredBuyers’ group openLavender Meadows
by Terrafem Group
Price: Price on requestGet brochure & price →
- 30×33, 30×40, 25×50 +1 more
- 646 – 3,006 sq ft plots
- Approved by BMRDA
- Dec 2025
RERA not updated since promised Dec 2025 · 137 plots · 1 RERA complaint
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Lavender Meadows