Godrej Woodscapes
1, 2, 3 & 4 BHK apartments by Godrej Properties Limited · Konadasapura, Budigere Cross, Bengaluru
Konadasapura, Budigere Cross, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
Listed price: ₹4.1 Cr
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Godrej Woodscapes at a glance
- Price from₹4.1 Cr · 4 BHKBuilder’s website · as on 23 Oct 2026
- All-in from₹4.62 Cr · 4 BHKBuilder price + GST, stamp duty, registration · 23 Oct 2026
- Possession (RERA)Jun 2030Karnataka RERA
- Construction32% built · on pace for May 2032 40 mo after RERA dateRERA filing to 30 Sep 2026 (Main registration); estimate from average pace
- RERA complaints (project)7 complaintsKarnataka RERA · as on 21 Oct 2026
- Approvals filed8 of 9 on RERAKarnataka RERA uploads · 21 Oct 2026
- Nearest metroWhitefield (Kadugodi) · 5.88 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 72 min at peak17.72 km straight line · estimate
- Nearest lakeKonadasapura lake · 347 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Godrej Woodscapes is a residential project by Godrej Properties Limited in Konadasapura, Bengaluru with 2,400 homes, registered with Karnataka RERA. The completion date on RERA is 1 Jun 2030. It is registered in 2 phases.
Facts collected on 21 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Godrej Woodscapes buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Godrej Properties Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Godrej Woodscapes buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 1 BHK, 2 BHK, 2.5 BHK, 3 BHK, +2 more
- Carpet area
- 103 – 1,983 sq ft
- Towers
- 15
- Floors
- 39
- Total homes
- 2,400
- Land
- 17.22 acres
- Possession (RERA)
- Jun 2030
- Built (RERA update)
- Not found in public records yet: construction progress
Godrej Woodscapes RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/446/PR/170524/006882
- Registered on
- 17 May 2024
- Promised completion
- 1 Jun 2030
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- Not found in public records yet: homes booked
- Price
- ₹4.1 Cr as on
- Project type
- Residential
2 RERA registrations (one per phase) are shown together on this page; dates above are the latest across phases.
From the builder’s own website; see the price list below for size basis.
Phases and RERA numbers
| Phase | RERA number | Promised completion | Homes | Status | Source |
|---|---|---|---|---|---|
| Main registration | PRM/KA/RERA/1251/446/PR/170524/006882 | 31 Jan 2029 | 2,168 | New launch | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Phase 2 | PRM/KA/RERA/1251/446/PR/170524/006888 | 1 Jun 2030 | 232 | New launch | Source (rera.karnataka.gov.in) (opens in a new tab) |
Towers and blocks (RERA filing)
15 rows: towers. Scroll inside the table to see them all.
| Tower | Phase | Floors | Basements | Homes |
|---|---|---|---|---|
| Tower D | Main registration | 39 | 3 | 158 |
| E | Main registration | 39 | 3 | 158 |
| F | Main registration | 39 | 3 | 158 |
| G | Main registration | 39 | 3 | 150 |
| H | Main registration | 39 | 3 | 150 |
| J | Main registration | 39 | 3 | 150 |
| K | Main registration | 39 | 3 | 150 |
| L | Main registration | 39 | 3 | 236 |
| M | Main registration | 39 | 3 | 196 |
| N | Main registration | 39 | 3 | 200 |
| A | Main registration | 38 | 2 | 154 |
| B | Main registration | 38 | 2 | 154 |
| C | Main registration | 38 | 2 | 154 |
| Tower P | Phase 2 | 37 | 3 | 116 |
| Tower Q | Phase 2 | 37 | 3 | 116 |
A dash (—) means the filing did not state that value.
Godrej Woodscapes price list
| Home type | Size | Price | ₹ per sq ft | Source |
|---|---|---|---|---|
| 4 BHK | —unknown | From ₹4.1 Cronwards | — | Source (godrejproperties.com) (opens in a new tab) |
As published by the builder on the date shown — not an offer, and not checked with the builder. Check whether the size is carpet or super built-up area before comparing.
Price per sq ft vs projects within 5 km
The builder’s published prices work out to about ₹20,700 – ₹39,300 per sq ft of carpet area.
| Home type | Builder price | Carpet area (RERA) | ₹ per sq ft carpet |
|---|---|---|---|
| 4 BHK | from ₹4.1 Crseen 23 Oct 2026 | 1,042 – 1,983 sq ft | ₹20,700 – ₹39,300 |
Worked out as the builder’s “from” price ÷ the largest and smallest carpet area RERA lists for that home type — we don’t know which unit the starting price is for. Builders usually say taxes and other charges are extra. Builder price list (godrejproperties.com) (opens in a new tab) RERA carpet areas (rera.karnataka.gov.in) (opens in a new tab)
Compared with nearby projects
Same method for every project: the middle of its builder’s published “from” prices ÷ RERA carpet areas. Only projects whose builder publishes BHK-wise prices are included: Brigade Belvedere (0.4 km), Sobha Galera (1.7 km), Godrej Parkshire (3.4 km), Godrej Splendour (4.2 km), Brigade Lakecrest (4.7 km).
Sources:Source (godrejproperties.com) (opens in a new tab)Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Price history
One snapshot so far: the builder’s “onwards” prices seen on 23 Oct 2026. Each new check of the builder’s website adds a dated point here, so rises and offers show up with their dates.
| Seen on | Where | Prices |
|---|---|---|
| 23 Oct 2026 | Builder’s website Source (godrejproperties.com) (opens in a new tab) | 4 BHK from ₹4.1 Cr |
Summary in plain English
Godrej Woodscapes is a residential project by Godrej Properties Limited in Konadasapura, Bengaluru East. The project has 2,400 homes across 13 towers in the main registration and 2 towers in Phase 2, with completion dates of 31 January 2029 and 1 June 2030 respectively.
Written by AI from the RERA record above on 21 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- Not found in public records yet: open space
- Water and power
- Water source filed with RERA: Local Authority, Others
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA) · Main registration
- Axis Bank, Majestic
- Escrow bank (RERA) · Phase 2
- Axis Bank, Majestic
Amenities
- Electricity
- CCTV Surveillance
- Club House
- Outdoor Sports facility
- Indoor Sports facility
- Swimming Pool
- Gym
- Parks
- Power Backup
- Water and Sanitation
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Godrej Woodscapes location and address
- Address
- Sy.No 3 and 4, Konadasapura Village, Budigere Cross, , Bidarahalli Hobli, Bangalore East , Bengaluru East , Bengaluru Urban, Karnataka - 560049
- Village (RERA)
- Konadasapura
- Locality
- Budigere CrossAlso known as Budigere
- PIN code
- 560049
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.04825, 77.75192
Distances to landmarks
Not found in public records yet: landmarksAbout Budigere Cross
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 6.91 km | approx. 28 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 14.3 km | approx. 58 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 15.83 km | approx. 64 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 17.72 km | approx. 72 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 21.24 km | approx. 86 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 24.01 km | approx. 97 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 10Schools and colleges9 schools, 1 colleges, 0 kindergartens
- 0Hospitals and clinics0 hospitals, 0 clinics
Nearest schools and colleges
- Vibgyor School Kadugodi · 1.04 km
- Auxillium School · 1.21 km
- National Public School ITPL · 1.41 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Whitefield (Kadugodi) (ವೈಟ್ಫೀಲ್ಡ್ (ಕಾಡುಗೋಡಿ))Open now — nearest operating metro station5.88 km
- Whitefield (ವೈಟ್ಫೀಲ್ಡ್)Nearest railway station5.86 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Konadasapura lake, 347 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Konadasapura lake on OpenStreetMap (opens in a new tab) 347 m
- Nimbekaipura Lake on OpenStreetMap (opens in a new tab) 498 m
- Katamanallur Lake on OpenStreetMap (opens in a new tab) 961 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Godrej Woodscapes floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Floor plans6 files

Phase 2: Building 5_Tower P_Q Typical Floor Plans for 31_32_33Filed 9 Apr 2025 · Full PDF on RERA 
Main registration: Typical Floor - 2-19 21-29 31-35 37 & 39 Floors-minFiled 16 May 2024 · Full PDF on RERA 
Main registration: Building-3 - Floor Plan-minFiled 16 May 2024 · Full PDF on RERA 
Main registration: Building-3 - Floor Plans-minFiled 16 May 2024 · Full PDF on RERA 
Main registration: Building-4 - Floor Plans-1-minFiled 16 May 2024 · Full PDF on RERA 
Main registration: Building-4 - Floor Plans-minFiled 16 May 2024 · Full PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 1 BHK | 109 – 491 sq ft | 86 |
| 1bt-ews | 103 – 125 sq ft | 160 |
| 2 BHK | 716 – 1,191 sq ft | 484 |
| 2.5 BHK | 868 – 1,429 sq ft | 11 |
| 3 BHK | 751 – 1,983 sq ft | 1,505 |
| 3.5 BHK | 1,625 sq ft | 1 |
| 4 BHK | 1,042 – 1,983 sq ft | 153 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Godrej Woodscapes possession date and construction status
Timeline
- 31 Jan 2024Main registration: Project start date given to RERA
- 17 May 2024Main registration: Registered with Karnataka RERA
- 17 May 2024Phase 2: Registered with Karnataka RERA
- 1 Jun 2024Phase 2: Project start date given to RERA
- 31 Jan 2029Main registration: Completion date given at registration
- 1 Jun 2030Phase 2: Completion date given at registration
Construction pace from RERA quarterly filings (Main registration)
At the average pace so far, construction would reach 100% around May 2032 — about 40 months after the completion date on RERA (31 Jan 2029).
At the pace between the 4 quarterly filings we have (18% → 32% in 9 months), it would be around May 2030 — about 16 months after the RERA date.
This project has 2 RERA registrations; the chart uses Main registration, the one with the most quarterly filings.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 15 Oct 2026 | 32% | 2,165 of 2,168 |
| Q1 2026-27to 30 Jun 2026 | 10 Jul 2026 | 26% | 2,161 of 2,168 |
| Q4 2025-26to 31 Mar 2026 | 13 Apr 2026 | 24% | 2,161 of 2,168 |
| Q3 2025-26to 31 Dec 2025 | 14 Jan 2026 | 18% | 2,158 of 2,168 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 32% ÷ 32 months (31 Jan 2024 to 30 Sep 2026) = 1% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 68 ÷ 1 = 67.9 months → May 2032. This is an estimate, not a date from the builder or RERA.
Pace between filings = (32% − 18%) ÷ 9 months = 1.6% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
35 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Building plan (Main registration) | BDA - Bangalore Development Authority · No. BDA/TPM/DLP-16/22-23/1358/23-24 · dated 2023-09-29 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (Main registration) | Divisional Commissioner · No. ALN.1.SR.93/65-66 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Change of Land Use (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| District Magistrate (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approval/NOC under section 109 of KLR Act 1961 (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approval/NOC under section 14 of the KTCP Act (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| NOC in case of building proposals abutting to neighbouring properties (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Building plan (Phase 2) | BDA - Bangalore Development Authority · No. BDA/TPM/DLP-16/22-23/1358/23-24 · dated 2023-09-29 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (Phase 2) | District Commissioner · No. ALN.1.SR.93/65-66 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| District Magistrate (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approval/NOC under section 14 of the KTCP Act (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA (Main registration)
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BDA - Bangalore Development Authority · No. BDA/TPM/DLP-16/22-23/1358/23-24 · dated 29 Sep 2023
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 21 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). Each phase is registered separately; this list is for the phase named above. The project page on RERA lists each upload.
Godrej Woodscapes RERA complaints and orders
7 complaints as on Source (rera.karnataka.gov.in) (opens in a new tab)
| Complaint ref | Filed | Subject | Status | Source |
|---|---|---|---|---|
| 01158/2025 | 11 Sep 2025 | Complaint against unauthorized change of Retail 3 (G+3) block into Residential Towers R & S (G+38) in Godrej Woodscapes project | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 01040/2025 | 25 Aug 2025 | Significant changes to Approved Plan without prior consent of existing flat purchasers | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00593/2025 | 4 Apr 2025 | Cancellation of allotment and embezzlement of funds | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 01190/2024 | 19 Nov 2024 | Unfair Clauses in Godrej Woodscape Agreement Draft | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00801/2024 | 27 Aug 2024 | Refund of booking amount | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00726/2024 | 16 Aug 2024 | the value of area promised 170.1sq.mt at the discussion time, but given only 115.29sq.mt for the unit selected | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00058/2024 | 17 Jan 2024 | Violation of section-3, section-7, section-9 and section-10 by godrej properties ltd. and claim of service fees and compensation under section-69 of rera act 2016. | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Godrej Properties Limited
- Promoter type
- Company
- Projects on this site
- 20
- RERA complaints against promoter
- 65
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (21 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Godrej Properties Limited’s RERA recordGodrej Properties Limited delivery record
- 20Projects in Bengaluru on RERA26 approved registrations under Godrej Properties Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 21,984Homes and plots registeredAs stated in each registrations.
- 65RERA complaints33 open, 32 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 3Complaints per 1,000 homes and plots65 complaints ÷ 21,984 homes and plots in its 26 registrations on Karnataka RERA in Bengaluru.
What the complaints are about
65 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Sep 2023
- 23 Oct 2026Builder’s price list seen: 4 BHK from ₹4.1 Cr Source (godrejproperties.com) (opens in a new tab)
- 15 Oct 2026Main registration: Quarterly update filed for Q2 2026-27: 32% built, 2,165 of 2,168 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Oct 2026Phase 2: Quarterly update filed for Q2 2026-27: 30% built, 220 of 232 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 10 Jul 2026Main registration: Quarterly update filed for Q1 2026-27: 26% built, 2,161 of 2,168 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 10 Jul 2026Phase 2: Quarterly update filed for Q1 2026-27: 25% built, 220 of 232 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 13 Apr 2026Main registration: Quarterly update filed for Q4 2025-26: 24% built, 2,161 of 2,168 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 13 Apr 2026Phase 2: Quarterly update filed for Q4 2025-26: 23% built, 220 of 232 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Jan 2026Main registration: Quarterly update filed for Q3 2025-26: 18% built, 2,158 of 2,168 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Jan 2026Phase 2: Quarterly update filed for Q3 2025-26: 10% built, 220 of 232 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 11 Sep 2025Complaint 01158/2025 filed with RERA: “Complaint against unauthorized change of Retail 3 (G+3) block into Residential Towers R & S (G+38) in Godrej Woodscapes project” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 25 Aug 2025Complaint 01040/2025 filed with RERA: “Significant changes to Approved Plan without prior consent of existing flat purchasers” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 4 Apr 2025Complaint 00593/2025 filed with RERA: “Cancellation of allotment and embezzlement of funds” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 19 Nov 2024Complaint 01190/2024 filed with RERA: “Unfair Clauses in Godrej Woodscape Agreement Draft” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 27 Aug 2024Complaint 00801/2024 filed with RERA: “Refund of booking amount” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 16 Aug 2024Complaint 00726/2024 filed with RERA: “the value of area promised 170.1sq.mt at the discussion time, but given only 115.29sq.mt for the unit selected” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Jun 2024Phase 2: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 17 May 2024Main registration: Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/170524/006882); completion date 31 Jan 2029 Source (rera.karnataka.gov.in) (opens in a new tab)
- 17 May 2024Phase 2: Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/170524/006888); completion date 1 Jun 2030 Source (rera.karnataka.gov.in) (opens in a new tab)
- 31 Jan 2024Main registration: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 17 Jan 2024Complaint 00058/2024 filed with RERA: “Violation of section-3, section-7, section-9 and section-10 by godrej properties ltd. and claim of service fees and compensation under section-69 of rera act 2016.” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 29 Sep 2023Main registration: Building plan approved by BDA - Bangalore Development Authority (No. BDA/TPM/DLP-16/22-23/1358/23-24) Source (rera.karnataka.gov.in) (opens in a new tab)
- 29 Sep 2023Phase 2: Building plan approved by BDA - Bangalore Development Authority (No. BDA/TPM/DLP-16/22-23/1358/23-24) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- ₹2,84,646
- Down payment
- ₹82,00,000
- Loan amount
- ₹3,28,00,000
- Total interest
- ₹3,55,15,045
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s published “onwards” price for the home type, where it publishes one (it usually says government charges, other charges and taxes are extra). You can change it.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Sources:Source (godrejproperties.com) (opens in a new tab)How we calculate this
Godrej Woodscapes FAQs
What is the completion date for Godrej Woodscapes?
The main registration is scheduled for completion on 31 January 2029, and Phase 2 on 1 June 2030.
How many homes are in Godrej Woodscapes?
The project has 2,168 homes in the main registration and 232 homes in Phase 2, for a total of 2,400 homes.
What home types are available in Godrej Woodscapes?
The main registration offers 1 BHK (491 sq ft), 2 BHK (716–1,191 sq ft), 2.5 BHK (868–1,429 sq ft), 3 BHK (751–1,490 sq ft), 4 BHK (1,042–1,732 sq ft), and 1BT-EWS (103–125 sq ft). Phase 2 offers 1 BHK (109–128 sq ft), 2 BHK (1,106–1,137 sq ft), 3 BHK (1,273–1,983 sq ft), 3.5 BHK (1,625 sq ft), and 4 BHK (1,296–1,983 sq ft).
What is the construction progress of Godrej Woodscapes?
As of Q2 2026-27, the main registration is 32% complete and Phase 2 is 30% complete.
How many homes are booked in Godrej Woodscapes?
As of Q2 2026-27, 2,165 of 2,168 homes in the main registration are booked, and 220 of 232 homes in Phase 2 are booked.
What are the RERA registration numbers for Godrej Woodscapes?
The main registration number is PRM/KA/RERA/1251/446/PR/170524/006882 and Phase 2 is PRM/KA/RERA/1251/446/PR/170524/006888, both registered on 17 May 2024.
Where is Godrej Woodscapes located?
The project is in Konadasapura, Bengaluru East, with PIN code 560049.
How many complaints have been filed against Godrej Woodscapes?
There are 7 RERA complaints on the project: 5 on the main registration and 2 on Phase 2.
What is Godrej Properties Limited's track record on RERA?
Godrej Properties Limited has 65 RERA complaints across all projects and 12 projects in the Bengaluru RERA records.
Which bank holds the escrow funds for Godrej Woodscapes?
Axis Bank holds the escrow funds for both the main registration and Phase 2.
Written by AI from the RERA record above on 21 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Godrej Woodscapes
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Godrej Properties Limited? Review the builder.
Reviews of Godrej Properties Limited by verified buyers
No verified reviews of Godrej Properties Limited yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Ruchira The RiseRuchira Developers LLP | 0.2 km | 342 | Oct 2031 | 4% | 0 | Not collected |
| Mista Sri City- Budigere CrossMista Infra Private Limited | 0.3 km | 250 | Jun 2029 | 20% | 0 | Not collected |
| Brigade BelvedereBrigade Enterprises Ltd | 0.4 km | 773 | Mar 2031 | 13% | 0 | from ₹97 Labout ₹22,100/sq ft carpet |
| Sattva SongbirdSattva Resi Private Limited | 0.4 km | 1,760 | Jun 2031 | — | 0 | Not collected |
| Pushkalam HeritagePushkalam Developers | 0.4 km | 240 | Mar 2028 | 38% | 0 | Not collected |
| Samhita FinesseSamhita Estates LLP | 0.7 km | 24 | Dec 2028 | 44% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 21 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration numbers: PRM/KA/RERA/1251/446/PR/170524/006882, PRM/KA/RERA/1251/446/PR/170524/006888.
- RERA record last checked: 21 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 23 Oct 2026
- Builder price list seen: 23 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Budigere Cross
Kondasanapura, Budigere CrossUnder constructionRERA registeredBuyers’ group openRuchira The Rise
by Ruchira
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK, 3.5 BHK, 4 BHK
- 940 – 4,000 sq ft
- Oct 2031
342 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Ruchira The Rise
Konadasapura, Budigere CrossUnder constructionRERA registeredBuyers’ group openMista Sri City- Budigere Cross
by Mista Infra
Price: Price on requestGet brochure & price →
- 2 BHK, 2.5 BHK, 3 BHK, 3.5 BHK
- 562 – 1,081 sq ft
- Jun 2029
250 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Mista Sri City- Budigere Cross
Cheemasandra, Budigere CrossArtist’s impressionUnder constructionRERA registeredBuyers’ group openBrigade Belvedere
by Brigade Enterprises
Price: Price on requestGet brochure & price →
- 1 BHK, 2 BHK, 3 BHK
- 427 – 1,205 sq ft
- Mar 2031
773 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Brigade Belvedere