Golden Pearl Phase - 2
1, 2 & 3 BHK apartments by Global Developers · Indlabele, Sarjapur–Attibele Road, Bengaluru
Indlabele, Sarjapur–Attibele Road, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
Price: Price on request
Golden Pearl Phase - 2 at a glance
- Possession (RERA)Dec 2026Karnataka RERA
- RERA complaints (project)None listedKarnataka RERA · as on 22 Oct 2026
- Approvals filed4 of 9 on RERAKarnataka RERA uploads · 22 Oct 2026
- Nearest metroDelta Electronics Bommasandra · 10.34 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 189 min at peak46.7 km straight line · estimate
- Nearest lakeBidaraguppe Lake · 909 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Golden Pearl Phase - 2 is a residential project by Global Developers in Indlabele, Bengaluru with 82 homes, registered with Karnataka RERA. The completion date on RERA is 31 Dec 2026.
Facts collected on 22 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Golden Pearl Phase - 2 buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Global Developers for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Golden Pearl Phase - 2 buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 1 BHK, 2 BHK, 3 BHK, Villa
- Carpet area
- 1,153 – 2,213 sq ft
- Towers
- 7
- Floors
- 2
- Total homes
- 82
- Land
- 4.37 acres
- Possession (RERA)
- Dec 2026
- Built (RERA update)
- Not found in public records yet: construction progress
Golden Pearl Phase - 2 RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/308/PR/080223/005695
- Registered on
- 8 Feb 2023
- Promised completion
- 31 Dec 2026
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- Not found in public records yet: homes booked
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| Block-A | 2 | 0 | 7 |
| Block-B | 2 | 0 | 14 |
| Block-C | 2 | 0 | 12 |
| Block-D | 2 | 0 | 4 |
| Block-E | 2 | 0 | 27 |
| Block-F | 2 | 0 | 12 |
| Block-G | 2 | 0 | 6 |
A dash (—) means the filing did not state that value.
Summary in plain English
Golden Pearl Phase - 2 is a residential project by Global Developers in Indlabele, Anekal. The project has 82 homes across 7 towers and is registered with RERA to be completed by 31 December 2026.
Written by AI from the RERA record above on 5 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 66.7% of land
- Water and power
- Water source filed with RERA: BoreWell
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- Axis Bank, Panathur Branch
- Building plan (RERA)
- Local Planing Authority · No. STRRPA/TP/DP/02/2018-19 · dated 12 Apr 2022
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- Gym
- Parks
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Golden Pearl Phase - 2 location and address
- Address
- GOLDEN PEARL PHASE - 2, Sy. Nos. 53/4, 53/5, 53/7 & 195/5, Indlabele Village, , Attibele Hobli, Anekal Taluk, Bangalore Urban District, Bangalore. , Anekal , Bengaluru Urban, Karnataka - 562107
- Village (RERA)
- Indlabele
- Locality
- Sarjapur–Attibele RoadAlso known as Sarjapura Attibele Road, Attibele Sarjapur Road
- PIN code
- 562107
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.78686, 77.77770
Distances to landmarks
Not found in public records yet: landmarksAbout Sarjapur–Attibele Road
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 14.08 km | approx. 57 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 18.46 km | approx. 75 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 22.74 km | approx. 92 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 31.01 km | approx. 126 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 33.71 km | approx. 137 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 46.7 km | approx. 189 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 3Schools and colleges3 schools, 0 colleges, 0 kindergartens
- 7Hospitals and clinics4 hospitals, 3 clinics
Nearest schools and colleges
- Harvest International School · 0.67 km
Nearest hospitals and clinics
- Saraswathi Healthcare · 0.35 km
- Elite Hospital · 0.9 km
- Aastha Hospital · 0.91 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Delta Electronics Bommasandra (ಡೆಲ್ಟಾ ಎಲೆಕ್ಟ್ರಾನಿಕ್ಸ್ ಬೊಮ್ಮಸಂದ್ರ)Open now — nearest operating metro station10.34 km
- Maranayakanahalli Nearest railway station7.73 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Bidaraguppe Lake, 909 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Bidaraguppe Lake on OpenStreetMap (opens in a new tab) 909 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,423 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Golden Pearl Phase - 2 home types and carpet areas
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Approved building plan2 files

Approved Plan with STPFiled 10 Jan 2023 · Full PDF on RERA 
Approved Plan with STPFiled 10 Jan 2023 · Full PDF on RERA
Approved layout plan2 files

Approved Layout PlanFull PDF on RERA 
Existing Layout PlanFull PDF on RERA
Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.
Get brochure, floor plans & price| Home type | Carpet area | Homes |
|---|---|---|
| 1 BHK | 1,380 sq ft | 1 |
| 2 BHK | 1,153 – 1,472 sq ft | 4 |
| 3 BHK | 1,161 – 2,213 sq ft | 77 |
| Row houses | 1,337 sq ft | 82 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Golden Pearl Phase - 2 possession date and construction status
Timeline
- 1 Dec 2022Project start date given to RERA
- 8 Feb 2023Registered with Karnataka RERA
- 31 Dec 2026Completion date given at registration
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Building plan | Local Planing Authority · No. STRRPA/TP/DP/02/2018-19 · dated 2022-04-12 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (4 orders) | Deputy Commissioner · No. 200/2014-15 and 3 more · dated 2015-09-18 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — Local Planing Authority · No. STRRPA/TP/DP/02/2018-19 · dated 12 Apr 2022
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBNot on RERA yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 22 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Golden Pearl Phase - 2 RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Global Developers
- Promoter type
- Partnership Firm
- Projects on this site
- 1
- RERA complaints against promoter
- 3
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (22 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Global Developers’s RERA recordGlobal Developers delivery record
- 1Projects in Bengaluru on RERA1 approved registration under Global Developers in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 82Homes registeredAs stated in each registrations.
- 3RERA complaints2 open, 1 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 36.6Complaints per 1,000 homes3 complaints ÷ 82 homes in its 1 registration on Karnataka RERA in Bengaluru.
What the complaints are about
3 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Apr 2022
- 8 Feb 2023Registered with Karnataka RERA (PRM/KA/RERA/1251/308/PR/080223/005695); completion date 31 Dec 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Dec 2022Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 12 Apr 2022Building plan approved by Local Planing Authority (No. STRRPA/TP/DP/02/2018-19) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Golden Pearl Phase - 2 FAQs
What is the completion date for Golden Pearl Phase - 2?
The completion date on RERA is 31 December 2026.
What types of homes are available in Golden Pearl Phase - 2?
The project has ROW houses (1,337 carpet area sq ft), 3 BHK homes (1,161 to 2,213 carpet area sq ft), 2 BHK homes (1,153 to 1,472 carpet area sq ft), and one 1 BHK home (1,380 carpet area sq ft).
How many homes are in Golden Pearl Phase - 2?
The project has 82 homes in total.
What is the RERA registration number for Golden Pearl Phase - 2?
The RERA registration number is PRM/KA/RERA/1251/308/PR/080223/005695.
Where is Golden Pearl Phase - 2 located?
The project is in Indlabele, Anekal taluk, Bengaluru Urban district, PIN code 562107.
How many towers does Golden Pearl Phase - 2 have?
The project has 7 towers with a maximum of 2 floors.
Are there any RERA complaints against Golden Pearl Phase - 2?
There are no RERA complaints recorded on this project.
When was Golden Pearl Phase - 2 registered with RERA?
The project was registered on 8 February 2023.
Who is the builder of Golden Pearl Phase - 2?
Global Developers, a partnership firm, is the builder.
What is the escrow bank for Golden Pearl Phase - 2?
Axis Bank is the escrow bank for this project.
Written by AI from the RERA record above on 5 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Golden Pearl Phase - 2
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Global Developers? Review the builder.
Reviews of Global Developers by verified buyers
No verified reviews of Global Developers yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| vmaks laurelVMAKS BUILDERS Pvt Ltd | 0.3 km | 416 | Dec 2026extended | 72% | 3 | from ₹75 Labout ₹9,500/sq ft carpet |
| G.R. SamskruthiG R Constructions | 0.8 km | 459 | Nov 2026extended | 75% | 0 | Not collected |
| NVT A Wonderful World Phase INVT Quality Lifestyle Estate LLP | 1.5 km | 123 | Dec 2030 | 47% | 0 | Not collected |
| Mitta OrrinM/S Mitta Builders | 1.6 km | 79 | Dec 2027 | 80% | 0 | Not collected |
| Maruti AkridaMaruti Ventures | 1.8 km | 322 | Jun 2027 | 50% | 0 | Not collected |
| Life By The GreensV4 Infra Projects | 2.4 km | 50 | Mar 2028 | 48% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 22 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/308/PR/080223/005695.
- RERA record last checked: 22 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 8 Feb 2023
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Sarjapur–Attibele Road
Indlabele, Sarjapur–Attibele RoadArtist’s impressionUnder constructionRERA registeredBuyers’ group openvmaks laurel
by VMAKS BUILDERS
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 751 – 1,124 sq ft
- Dec 2026 (extended)
416 homes · 3 RERA complaints
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for vmaks laurel
Indlabele, Sarjapur–Attibele RoadUnder constructionRERA registeredBuyers’ group openG.R. Samskruthi
by G R Constructions
Price: Price on requestGet brochure & price →
- 1 BHK, 2 BHK, 3 BHK
- 417 – 1,052 sq ft
- Nov 2026 (extended)
459 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for G.R. Samskruthi
Jigala, Sarjapur–Attibele RoadUnder constructionRERA registeredBuyers’ group openNVT A Wonderful World Phase I
by NVT Quality Lifestyle Estate
Price: Price on requestGet brochure & price →
- 4 BHK, Villa
- 2,098 – 3,172 sq ft
- Dec 2030
123 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for NVT A Wonderful World Phase I