Greennesto-O2
2 & 3 BHK apartments by Greennesto Builders and Developers · Haralur, Harlur Road, Bengaluru
Haralur, Harlur Road, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- RERA not updated: completion promised Dec 2025; no extension or completion filed
- residential
by Greennesto Builders and Developers
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Greennesto-O2 at a glance
- Possession (RERA)Dec 2025 Date passedKarnataka RERA
- Construction100% builtPromoter’s RERA update · as on 31 Dec 2025
- Homes booked88 of 88 (100%)RERA update · as on 31 Dec 2025
- RERA complaints (project)2 complaintsKarnataka RERA · as on 12 Oct 2026
- Approvals filed1 of 9 on RERAKarnataka RERA uploads · 12 Oct 2026
- Nearest metroIbbaluru · 1.86 km (under construction)Open now: Kudlu Gate, 3.05 km · straight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 135 min at peak33.26 km straight line · estimate
- Nearest lakeKasavanahalli Lake · 321 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Greennesto-O2 is a residential project by Greennesto Builders and Developers in Haralur, Bengaluru with 88 homes, registered with Karnataka RERA. The completion date on RERA is 31 Dec 2025.
Facts collected on 12 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Greennesto-O2 buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Greennesto Builders and Developers for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Greennesto-O2 buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 2 BHK, 3 BHK
- Carpet area
- 710 – 988 sq ft
- Towers
- 1
- Floors
- 4
- Total homes
- 88
- Land
- 1 acres
- Possession (RERA)
- Dec 2025
- Built (RERA update)
- 100%
Greennesto-O2 RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/446/PR/211005/004334
- Registered on
- 5 Oct 2021
- Promised completion
- 31 Dec 2025
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- 88 of 88 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| Tower 1 | 4 | 2 | 88 |
A dash (—) means the filing did not state that value.
Summary in plain English
Greennesto-O2 is a residential project by Greennesto Builders and Developers in Haralur, Bengaluru East. The project has 88 homes across 1 tower of 4 floors, with 3 BHK and 2 BHK apartments. The completion date on RERA is 31 December 2025.
Written by AI from the RERA record above on 12 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 53.7% of land
- Water and power
- Not found in public records yet: water and power
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- HDFC, HSRR Layout
- Project cost declared to RERA
- ₹40 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
Greennesto-O2 location and address
- Address
- Converted Sy No.3/2 and 3/1B, Haralur Village, Varthur Hobli Bangalore East Taluk
- Village (RERA)
- Haralur
- Locality
- Harlur RoadAlso known as Haralur Road, Harlur
- PIN code
- 560066
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.90433, 77.66315
Distances to landmarks
Not found in public records yet: landmarksAbout Harlur Road
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 2.91 km | approx. 12 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 6.08 km | approx. 25 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 12.3 km | approx. 50 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 13.05 km | approx. 53 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 16.66 km | approx. 67 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 33.26 km | approx. 135 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 33Schools and colleges22 schools, 5 colleges, 6 kindergartens
- 44Hospitals and clinics23 hospitals, 21 clinics
Nearest schools and colleges
- Orchids the International School · 0.58 km
- Kidzee Play School · 0.85 km
- Vibgyor School · 0.87 km
Nearest hospitals and clinics
- Sri Lakshmi Clinic · 0.42 km
- Klinik Guhen - Dental Clinic · 0.53 km
- The Local Dentist · 0.57 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Ibbaluru (ಇಬ್ಬಲೂರು)Blue Line metro, under construction1.86 km
- Agara Lake (ಅಗರ)Blue Line metro, under construction2.78 km
- Kudlu Gate (ಕುಡ್ಲು ಗೇಟ್)Open now — nearest operating metro station3.05 km
- Carmelaram (ಕರ್ಮೇಲರಮ್)Nearest railway station4.64 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Kasavanahalli Lake, 321 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Kasavanahalli Lake on OpenStreetMap (opens in a new tab) (ಕಸವನಹಳ್ಳಿ ಲೇಕ್ಕೆ)321 m
- Haralur Lake on OpenStreetMap (opens in a new tab) (ಹರಳೂರು ಕೆರೆ)515 m
- Ambalipura Upper Lake on OpenStreetMap (opens in a new tab) (ಅಂಬಲಿಪುರ ಕೆರೆ)855 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Greennesto-O2 home types and carpet areas
Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.
Get brochure, floor plans & price| Home type | Carpet area | Homes |
|---|---|---|
| 2 BHK | 710 – 806 sq ft | 68 |
| 3 BHK | 937 – 988 sq ft | 20 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Greennesto-O2 possession date and construction status
Promoter’s quarterly update to RERA for Q3 2025-26, submitted 2026-02-05.
Units sold and unsold, from RERA (Q3 2025-26)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 2 BHK | 68 | 68 | 0 |
| 3 BHK | 20 | 20 | 0 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 17 Feb 2020Project start date given to RERA
- 5 Oct 2021Registered with Karnataka RERA
- 31 Dec 2025Completion date given at registration
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Building plan | BBMP - Bruhat Bengaluru Mahanagara Palike | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Commencement certificate · Permission to start buildingNot on RERA yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBNot on RERA yet
- Water and sewerage · BWSSBNot on RERA yet
- Electricity · BESCOMNot on RERA yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 12 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Greennesto-O2 RERA complaints and orders
2 complaints as on Source (rera.karnataka.gov.in) (opens in a new tab)
| Complaint ref | Filed | Subject | Status | Source |
|---|---|---|---|---|
| 00059/2023 | 11 Jan 2023 | Refund | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220623/0009666 | 23 Jun 2022 | Refund of Expression of Interest amount | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Greennesto Builders and Developers
- Promoter type
- Partnership Firm
- Projects on this site
- 2
- RERA complaints against promoter
- 3
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (12 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Greennesto Builders and Developers’s RERA recordGreennesto Builders and Developers delivery record
- 2Projects in Bengaluru on RERA2 approved registrations under Greennesto Builders and Developers in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 288Homes registeredAs stated in each registrations.
- 3RERA complaints0 open, 3 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 10.4Complaints per 1,000 homes3 complaints ÷ 288 homes in its 2 registrations on Karnataka RERA in Bengaluru.
What the complaints are about
3 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Feb 2020
- 5 Feb 2026Quarterly update filed for Q3 2025-26: 100% built, 88 of 88 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 11 Jan 2023Complaint 00059/2023 filed with RERA: “Refund” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 23 Jun 2022Complaint CMP/220623/0009666 filed with RERA: “Refund of Expression of Interest amount” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 5 Oct 2021Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/211005/004334); completion date 31 Dec 2025 Source (rera.karnataka.gov.in) (opens in a new tab)
- 17 Feb 2020Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Greennesto-O2 FAQs
What is the completion date for Greennesto-O2?
The completion date on RERA is 31 December 2025.
How many homes are in Greennesto-O2?
The project has 88 homes.
What home types are available in Greennesto-O2?
The project offers 3 BHK homes (20 units, carpet area 937 to 988 sq ft) and 2 BHK homes (68 units, carpet area 710 to 806 sq ft).
What is the RERA registration number for Greennesto-O2?
The RERA registration number is PRM/KA/RERA/1251/446/PR/211005/004334.
When was Greennesto-O2 registered with RERA?
The project was registered on 5 October 2021.
What is the construction progress of Greennesto-O2?
As of Q3 2025-26 (quarter ended 31 December 2025), construction is 100% complete and 88 homes are booked.
How many RERA complaints have been filed against Greennesto-O2?
There are 2 RERA complaints on this project.
Where is Greennesto-O2 located?
The project is in Haralur, Bengaluru East taluk, Bengaluru Urban district, PIN code 560066.
What is the builder's track record in Bengaluru?
Greennesto Builders and Developers has 2 projects on the Karnataka RERA record and 3 RERA complaints against the builder across all projects.
What bank holds the escrow for Greennesto-O2?
HDFC is the escrow bank for this project.
Written by AI from the RERA record above on 12 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Greennesto-O2
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Greennesto Builders and Developers? Review the builder.
Reviews of Greennesto Builders and Developers by verified buyers
No verified reviews of Greennesto Builders and Developers yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| WindmereB & M Windmere | 0.4 km | 24 | Jun 2027 | 88% | 0 | Not collected |
| Saiven Six SensesSaiven Developers And Constructions Pvt Ltd | 0.8 km | 169 | Apr 2030 | 17% | 0 | Not collected |
| BreezeElite Projects | 0.9 km | 19 | Nov 2025 | — | 0 | Not collected |
| NeuhausAre Realty | 0.9 km | 20 | Dec 2026 | 100% | 0 | Not collected |
| Bren Imperia GrandeBren Corporation | 0.9 km | 327 | Oct 2027 | 31% | 0 | Not collected |
| Samanvitha Siena TerraSamanvitha Projects | 1 km | 16 | Apr 2029 | 56% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 12 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/446/PR/211005/004334.
- RERA record last checked: 12 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 5 Feb 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Harlur Road
Kasavanahalli, Harlur RoadUnder constructionRERA registeredBuyers’ group openWindmere
by B & M Windmere
Price: Price on requestGet brochure & price →
- 3 BHK, 4 BHK
- 1,259 – 2,619 sq ft
- Jun 2027
24 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Windmere
Kudlu, Harlur RoadUnder constructionRERA registeredBuyers’ group openVerdant Tropical Heights
by Verdant Builders And
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 779 – 1,049 sq ft
- Jun 2029
88 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Verdant Tropical Heights
Kudlu, Harlur RoadUnder constructionRERA registeredBuyers’ group openRaj Etternia E Block (Building 4)
by SNN Properties
Price: Price on requestGet brochure & price →
- 1 BHK, 2 BHK, 2.5 BHK, 3 BHK, +1 more
- 381 – 1,656 sq ft
- Apr 2026
RERA not updated since promised Apr 2026 · 150 homes
Be one of the first 10 buyers in this groupFounding members — it’s free