Raj Etternia E Block (Building 4)
1, 2, 3 & 4 BHK apartments by SNN Properties LLP · Kudlu, Harlur Road, Bengaluru
Kudlu, Harlur Road, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- RERA not updated: completion promised Apr 2026; no extension or completion filed
- residential
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Raj Etternia E Block (Building 4) at a glance
- Possession (RERA)Apr 2026 Date passedKarnataka RERA
- Construction79% built · on pace for Apr 2027 12 mo after RERA dateRERA filing to 31 Mar 2026; estimate from average pace
- Homes booked144 of 150 (96%)RERA update · as on 31 Mar 2026
- RERA complaints (project)None listedKarnataka RERA · as on 12 Oct 2026
- Approvals filed8 of 9 on RERAKarnataka RERA uploads · 12 Oct 2026
- Nearest metroSingasandra · 2.58 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 141 min at peak34.75 km straight line · estimate
- Nearest lakeHosakere · 301 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Raj Etternia E Block (Building 4) is a residential project by SNN Properties LLP in Kudlu, Bengaluru with 150 homes, registered with Karnataka RERA. The completion date on RERA is 30 Apr 2026.
Facts collected on 12 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Raj Etternia E Block (Building 4) buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks SNN Properties LLP for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Raj Etternia E Block (Building 4) buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 1 BHK, 2 BHK, 2.5 BHK, 3 BHK, +1 more
- Carpet area
- 381 – 1,656 sq ft
- Towers
- 1
- Floors
- 18
- Total homes
- 150
- Land
- 1.84 acres
- Possession (RERA)
- Apr 2026
- Built (RERA update)
- 79%
Raj Etternia E Block (Building 4) RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/308/PR/290422/004855
- Registered on
- 29 Apr 2022
- Promised completion
- 30 Apr 2026
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- 144 of 150 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| BUILDING 4 | 18 | 1 | 145 |
A dash (—) means the filing did not state that value.
Summary in plain English
Raj Etternia E Block (Building 4) is a residential project by SNN Properties LLP in Kudlu, Anekal. The project has 150 homes across one 18-storey tower with completion set for 30 April 2026.
Written by AI from the RERA record above on 12 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 83.3% of land
- Water and power
- Water source filed with RERA: BoreWell,BWSSB
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- STATE BANK OF INDIA, SME Jayanagar
- Building plan (RERA)
- BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Addl.Dir/JD SOUTH/0083/14-15 · dated 12 Nov 2019
- Project cost declared to RERA
- ₹115 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- CCTV Surveillance
- Club House
- Community Hall
- Outdoor Sports facility
- Indoor Sports facility
- Swimming Pool
- Gym
- Parks
- Power Backup
- Gas
- Water and Sanitation
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Raj Etternia E Block (Building 4) location and address
- Address
- SY NO 146/1,147/1,147/2,145/1,144, KUDLU VILLAGE , SARJAPURA HOBLI, HARLURU ROAD,ANEKAL TALUK , Anekal , Bengaluru Urban, Karnataka - 560068
- Village (RERA)
- Kudlu
- Locality
- Harlur RoadAlso known as Haralur Road, Harlur
- PIN code
- 560068
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.89040, 77.66653
Distances to landmarks
Not found in public records yet: landmarksAbout Harlur Road
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 4.03 km | approx. 16 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 4.53 km | approx. 18 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 13.29 km | approx. 54 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 14.34 km | approx. 58 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 18.25 km | approx. 74 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 34.75 km | approx. 141 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 20Schools and colleges17 schools, 2 colleges, 1 kindergartens
- 13Hospitals and clinics6 hospitals, 7 clinics
Nearest schools and colleges
- The Cambridge International School · 0.11 km
- Sadhguru Sainath International School and College · 0.45 km
- Koala Preschool · 0.75 km
Nearest hospitals and clinics
- Geronics · 0.72 km
- Harmony Wellness Concepts Center · 0.75 km
- Liss Medical and Dental Clinic · 1.34 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Singasandra (ಸಿಂಗಸಂದ್ರ)Open now — nearest operating metro station2.58 km
- Carmelaram (ಕರ್ಮೇಲರಮ್)Nearest railway station4.66 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Hosakere, 301 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Hosakere on OpenStreetMap (opens in a new tab) (ಹೊಸಕೆರೆ)301 m
- Haralur Lake on OpenStreetMap (opens in a new tab) (ಹರಳೂರು ಕೆರೆ)598 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 765 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Raj Etternia E Block (Building 4) floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Floor plans12 files

GROUND FLOOR PLAN c.pdfFull PDF on RERA 
Previous Plan 12TH FLOOR PLANFull PDF on RERA 
Previous Plan 13TH FLOOR PLANFull PDF on RERA 
Previous Plan 1ST FLOOR PLANFull PDF on RERA 
Previous Plan 2ND FLOOR PLANFull PDF on RERA 
Previous Plan 3RD FLOOR PLANFull PDF on RERA 
Previous Plan 4TH FLOOR PLANFull PDF on RERA 
Previous Plan 5TH FLOOR PLANFull PDF on RERA 
Previous Plan 6TH FLOOR PLANFull PDF on RERA 
Previous Plan 7TH FLOOR PLANFull PDF on RERA 
Previous Plan 8TH FLOOR PLANFull PDF on RERA 
Previous Plan 9TH TO 11TH FLOOR PLANFull PDF on RERA
Elevations2 files

ELEVATION Plan c.pdfFull PDF on RERA 
Previous Plan ELEVATION A-AFull PDF on RERA
Approved layout plan2 files

Demarcation plan-Model.pdfFull PDF on RERA 
STP Demarcation Plan with drawings and description.pdfFull PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 1 BHK | 381 sq ft | 8 |
| 2 BHK | 718 – 720 sq ft | 68 |
| 2.5 BHK | 852 sq ft | 17 |
| 3 BHK | 948 – 951 sq ft | 57 |
| 4 BHK | 1,656 sq ft | 19 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Raj Etternia E Block (Building 4) possession date and construction status
Promoter’s quarterly update to RERA for Q4 2025-26, submitted 2026-04-15.
Units sold and unsold, from RERA (Q4 2025-26)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 1 BHK | 14 | 14 | 0 |
| 2 BHK | 34 | 33 | 1 |
| 2.5 BHK | 21 | 21 | 0 |
| 3 BHK | 57 | 57 | 0 |
| 4 BHK | 19 | 19 | 0 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 29 Apr 2022Registered with Karnataka RERA
- 1 May 2022Project start date given to RERA
- 30 Apr 2026Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Apr 2027 — about 12 months after the completion date on RERA (30 Apr 2026).
At the pace between the 2 quarterly filings we have (72% → 79% in 3 months), it would be around Dec 2026 — about 8 months after the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q4 2025-26to 31 Mar 2026 | 15 Apr 2026 | 79% | 144 of 145 |
| Q3 2025-26to 31 Dec 2025 | 14 Jan 2026 | 72% | 144 of 145 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 79% ÷ 47 months (1 May 2022 to 31 Mar 2026) = 1.7% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 31 Mar 2026 + 21 ÷ 1.7 = 12.5 months → Apr 2027. This is an estimate, not a date from the builder or RERA.
Pace between filings = (79% − 72%) ÷ 3 months = 2.4% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q4 2025-26, submitted 2026-04-15.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
16 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Building plan | BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Addl.Dir/JD SOUTH/0083/14-15 · dated 2019-11-12 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (2 orders) | DC Office BANGALORE · No. ALN(A)(S)SR 92,93,94,95,96,97,99,100,105,106,107,108,109,110,112,113/2007-08 and 1 more · dated 2012-09-13 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Change of Land Use | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| District Magistrate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Addl.Dir/JD SOUTH/0083/14-15 · dated 12 Nov 2019
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 12 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Raj Etternia E Block (Building 4) RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About SNN Properties LLP
- Promoter type
- Partnership Firm
- Projects on this site
- 2
- RERA complaints against promoter
- 1
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (12 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
SNN Properties LLP’s RERA recordSNN Properties LLP delivery record
- 2Projects in Bengaluru on RERA2 approved registrations under SNN Properties LLP in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 1,200Homes registeredAs stated in each registrations.
- 1RERA complaints0 open, 1 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0.8Complaints per 1,000 homes1 complaints ÷ 1,200 homes in its 2 registrations on Karnataka RERA in Bengaluru.
What the complaints are about
1 complaint subject as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Nov 2019
- 15 Apr 2026Quarterly update filed for Q4 2025-26: 79% built, 144 of 145 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Jan 2026Quarterly update filed for Q3 2025-26: 72% built, 144 of 145 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 May 2022Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 29 Apr 2022Registered with Karnataka RERA (PRM/KA/RERA/1251/308/PR/290422/004855); completion date 30 Apr 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
- 12 Nov 2019Building plan approved by BBMP - Bruhat Bengaluru Mahanagara Palike (No. BBMP/Addl.Dir/JD SOUTH/0083/14-15) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Raj Etternia E Block (Building 4) FAQs
What is the RERA registration number for Raj Etternia E Block (Building 4)?
The RERA registration number is PRM/KA/RERA/1251/308/PR/290422/004855, registered on 29 April 2022.
When will Raj Etternia E Block (Building 4) be completed?
The completion date on RERA is 30 April 2026.
What home types are available in Raj Etternia E Block (Building 4)?
The project offers 1 BHK (381 carpet sq ft), 2 BHK (718-720 carpet sq ft), 2.5 BHK (852 carpet sq ft), 3 BHK (948-951 carpet sq ft), and 4 BHK (1,656 carpet sq ft) homes.
How many homes are in each type at Raj Etternia E Block (Building 4)?
There are 8 homes of 1 BHK, 68 homes of 2 BHK, 17 homes of 2.5 BHK, 57 homes of 3 BHK, and 19 homes of 4 BHK.
What is the construction progress for Raj Etternia E Block (Building 4)?
As of Q4 2025-26, the construction is 79% complete.
How many homes are booked in Raj Etternia E Block (Building 4)?
As of Q4 2025-26, 144 homes have been booked out of 150 total homes.
Where is Raj Etternia E Block (Building 4) located?
The project is in Kudlu, Anekal taluk, Bengaluru Urban district, with PIN code 560068.
Are there any RERA complaints against Raj Etternia E Block (Building 4)?
There are no RERA complaints on this project.
How many total projects does SNN Properties LLP have on the RERA record?
SNN Properties LLP has 3 projects in the Bengaluru RERA records.
How many RERA complaints are against SNN Properties LLP across all projects?
There is 1 RERA complaint against SNN Properties LLP across all their projects.
Written by AI from the RERA record above on 12 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Raj Etternia E Block (Building 4)
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from SNN Properties LLP? Review the builder.
Reviews of SNN Properties LLP by verified buyers
No verified reviews of SNN Properties LLP yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| HavenLodha Developers Limited | 0.7 km | 452 | Jun 2030 | — | 0 | from ₹2.99 Crabout ₹23,200/sq ft carpet |
| Verdant Tropical HeightsVerdant Builders And Developers | 0.8 km | 88 | Jun 2029 | 25% | 0 | Not collected |
| Olive & OakAshrith Vciti Projects | 1 km | 108 | Feb 2028 | — | 0 | Not collected |
| BreezeElite Projects | 1 km | 19 | Nov 2025 | — | 0 | Not collected |
| Sree Nidhi BrindhavanSree Nidhi Developers | 1.1 km | 64 | Dec 2028 | 20% | 0 | Not collected |
| Assetz Mizumi ReserveApg Community Development Private Limited | 1.3 km | 704 | Mar 2031 | — | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 12 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/308/PR/290422/004855.
- RERA record last checked: 12 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 15 Apr 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Harlur Road
Choodasandra, Harlur RoadUnder constructionRERA registeredBuyers’ group openHaven
by Lodha
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK, 4 BHK
- 732 – 3,122 sq ft
- Jun 2030
2 phases on RERA · 452 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Haven
Kudlu, Harlur RoadUnder constructionRERA registeredBuyers’ group openVerdant Tropical Heights
by Verdant Builders And
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 779 – 1,049 sq ft
- Jun 2029
88 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Verdant Tropical Heights
Kudlu, Harlur RoadUnder constructionRERA registeredBuyers’ group openOlive & Oak
by Ashrith Vciti
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK, 4 BHK
- 592 – 1,179 sq ft
- Feb 2028
108 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Olive & Oak