Heavie Eden
1 & 2 BHK apartments by Sentient Developers Private Limited · Kasavanahalli, Bellandur, Bengaluru
Kasavanahalli, Bellandur, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
by Sentient Developers Private Limited
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Heavie Eden at a glance
- Possession (RERA)Dec 2026 ExtendedWas Dec 2024 · Karnataka RERA
- Construction94% built · on pace for Oct 2026RERA filing to 30 Jun 2026; estimate from average pace
- Homes booked13 of 28 (46%)RERA update · as on 30 Jun 2026
- RERA complaints (project)None listedKarnataka RERA · as on 12 Oct 2026
- Approvals filed3 of 9 on RERAKarnataka RERA uploads · 12 Oct 2026
- Nearest metroPrestige Bellandur · 1.95 km (under construction)Open now: Kudlu Gate, 5.06 km · straight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 131 min at peak32.4 km straight line · estimate
- Nearest lakeSaul Kere · 640 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Heavie Eden is a residential project by Sentient Developers Private Limited in Kasavanahalli, Bengaluru with 28 homes, registered with Karnataka RERA. The completion date on RERA is 31 Dec 2026.
Facts collected on 12 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Heavie Eden buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Sentient Developers Private Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Heavie Eden buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 1 BHK, 2 BHK
- Carpet area
- 555 – 1,271 sq ft
- Towers
- 1
- Floors
- 3
- Total homes
- 28
- Land
- 0.27 acres
- Possession (extended)
- Dec 2026
- Built (RERA update)
- 94%
Heavie Eden RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/446/PR/210222/004725
- Registered on
- 21 Feb 2022
- Promised completion
- 31 Dec 2024
- Extended to
- 31 Dec 2026
- RERA status
- New launch
- Homes booked
- 13 of 28 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| 1 | 3 | 1 | 28 |
A dash (—) means the filing did not state that value.
Summary in plain English
Heavie Eden is a residential project by Sentient Developers Private Limited in Kasavanahalli, Bengaluru East. It has 28 homes in 1 tower with 3 floors. The project completion date is now 31 December 2026.
Written by AI from the RERA record above on 5 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 33.2% of land
- Water and power
- Water source filed with RERA: BoreWell
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- STATE BANK OF INDIA, SPECIALISED P B B BENGALURU
- Building plan (RERA)
- BBMP - Bruhat Bengaluru Mahanagara Palike · No. PRJ/5677/21-22 · dated 23 Nov 2021
- Project cost declared to RERA
- ₹15.65 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- CCTV Surveillance
- Swimming Pool
- Gym
- Power Backup
- Piped Gas
- Water and Sanitation
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Heavie Eden location and address
- Address
- Sy no. 6/7,Kasavanahalli Village , Varthur Hobli , Bengaluru East , Bengaluru Urban, Karnataka - 560035
- Village (RERA)
- Kasavanahalli
- Locality
- Bellandur
- PIN code
- 560035
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.91025, 77.68097
Distances to landmarks
Not found in public records yet: landmarksAbout Bellandur
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 1.5 km | approx. 6 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 6.96 km | approx. 28 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 10.58 km | approx. 43 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 14.24 km | approx. 58 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 16.7 km | approx. 68 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 32.4 km | approx. 131 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 26Schools and colleges21 schools, 2 colleges, 3 kindergartens
- 40Hospitals and clinics21 hospitals, 19 clinics
Nearest schools and colleges
- Government School · 0.51 km
- St. Peter's School · 0.55 km
- Vidyarambh Play School · 0.59 km
Nearest hospitals and clinics
- Naadi Ayurveda Center · 0.23 km
- The Family Doctor & The Family Pharma · 0.24 km
- Dr Mohan Nursing Home · 0.25 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Prestige Bellandur (ಬೆಳ್ಳಂದೂರ್)Blue Line metro, under construction1.95 km
- Ibbaluru (ಇಬ್ಬಲೂರು)Blue Line metro, under construction2.27 km
- Embassy Tech Village Kadubeesanahalli (ಕಾಡುಬೀಸನಹಳ್ಳಿ)Blue Line metro, under construction2.54 km
- Kudlu Gate (ಕುಡ್ಲು ಗೇಟ್)Open now — nearest operating metro station5.06 km
- Carmelaram (ಕರ್ಮೇಲರಮ್)Nearest railway station2.71 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Saul Kere, 640 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Saul Kere on OpenStreetMap (opens in a new tab) (ಸಾಲ್ ಕೆರೆ)640 m
- Kaikondrahalli Lake on OpenStreetMap (opens in a new tab) (ಕೈಕೊಂಡ್ರಹಳ್ಳಿ ಕೆರೆ)698 m
- Doddakannelli Lake on OpenStreetMap (opens in a new tab) (ದೊಡ್ಡಕನ್ನಹಳ್ಳಿ ಕೆರೆ)1,159 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Heavie Eden floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Brochure9 pages

BrochureFull PDF on RERA 






| Home type | Carpet area | Homes |
|---|---|---|
| 1 BHK | 555 sq ft | 1 |
| 1 BHK residential flats | 560 sq ft | 1 |
| 2 BHK | 728 – 1,271 sq ft | 27 |
| 2 BHK residential flats | 1,020 sq ft | 27 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Heavie Eden possession date and construction status
Promoter’s quarterly update to RERA for Q1 2026-27, submitted 2026-07-15.
Units sold and unsold, from RERA (Q1 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 1 BHK | 1 | 0 | 1 |
| 2 BHK | 27 | 13 | 14 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 1 Jan 2022Project start date given to RERA
- 21 Feb 2022Registered with Karnataka RERA
- 31 Dec 2024Completion date given at registration
- 31 Dec 2025Section 6 Extension: completion date moved to this date
- 31 Dec 2026Further Extension: completion date moved to this date
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Oct 2026 — about 3 months before the completion date on RERA (31 Dec 2026).
At the pace between the 3 quarterly filings we have (79% → 94% in 6 months), it would be around Sep 2026 — about 4 months before the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q1 2026-27to 30 Jun 2026 | 15 Jul 2026 | 94% | 13 of 28 |
| Q4 2025-26to 31 Mar 2026 | 18 May 2026 | 88% | 12 of 28 |
| Q3 2025-26to 31 Dec 2025 | 21 Feb 2026 | 79% | 10 of 28 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 94% ÷ 53.9 months (1 Jan 2022 to 30 Jun 2026) = 1.7% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Jun 2026 + 6 ÷ 1.7 = 3.4 months → Oct 2026. This is an estimate, not a date from the builder or RERA.
Pace between filings = (94% − 79%) ÷ 5.9 months = 2.5% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q1 2026-27, submitted 2026-07-15.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Building plan | BBMP - Bruhat Bengaluru Mahanagara Palike · No. PRJ/5677/21-22 · dated 2021-11-23 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion | District Magistrate · No. ALN(N)A:136:94-95 · dated 1994-11-26 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BBMP - Bruhat Bengaluru Mahanagara Palike · No. PRJ/5677/21-22 · dated 23 Nov 2021
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBNot on RERA yet
- Water and sewerage · BWSSBNot on RERA yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 12 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Heavie Eden RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Sentient Developers Private Limited
- Promoter type
- Company
- Projects on this site
- 1
- RERA complaints against promoter
- 0
- Company number (CIN)
- U45309KA2020PTC137488
From Karnataka RERA, as collected so far (12 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Sentient Developers Private Limited’s RERA recordSentient Developers Private Limited delivery record
- 1Projects in Bengaluru on RERA1 approved registration under Sentient Developers Private Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 28Homes registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 homes0 complaints ÷ 28 homes in its 1 registration on Karnataka RERA in Bengaluru.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Nov 2021
- 31 Dec 2026Completion date extended to 31 Dec 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Quarterly update filed for Q1 2026-27: 94% built, 13 of 28 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 18 May 2026Quarterly update filed for Q4 2025-26: 88% built, 12 of 28 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 21 Feb 2026Quarterly update filed for Q3 2025-26: 79% built, 10 of 28 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 21 Feb 2022Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/210222/004725); completion date 31 Dec 2024 Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Jan 2022Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 23 Nov 2021Building plan approved by BBMP - Bruhat Bengaluru Mahanagara Palike (No. PRJ/5677/21-22) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Heavie Eden FAQs
When will Heavie Eden be completed?
The current completion date on RERA is 31 December 2026. The original date was 31 December 2024, extended twice under Section 6 Extension and Further Extension.
How many homes are in Heavie Eden?
Heavie Eden has 28 homes total: 27 two-bedroom flats and 1 one-bedroom flat.
What are the home sizes in Heavie Eden?
The 2 BHK flats have a carpet area of 1,020 sq ft, and the 1 BHK flat has a carpet area of 560 sq ft.
What is the RERA registration number for Heavie Eden?
The RERA registration number is PRM/KA/RERA/1251/446/PR/210222/004725, registered on 21 February 2022.
How many homes are booked in Heavie Eden?
As of Q1 2026-27 (quarter ended 30 June 2026), 13 homes are booked out of 28.
What is the current construction status of Heavie Eden?
As of Q1 2026-27, the project is 94% complete.
Where is Heavie Eden located?
Heavie Eden is in Kasavanahalli, Bengaluru East taluk, Bengaluru Urban district, PIN code 560035.
Are there any RERA complaints on Heavie Eden?
There are no RERA complaints on this project registration.
How many projects does Sentient Developers have on RERA record?
Sentient Developers Private Limited has 1 project on record in our Bengaluru database.
What is the escrow bank for Heavie Eden?
The escrow bank is State Bank of India.
Written by AI from the RERA record above on 5 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Heavie Eden
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Sentient Developers Private Limited? Review the builder.
Reviews of Sentient Developers Private Limited by verified buyers
No verified reviews of Sentient Developers Private Limited yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Salarpuria-Sattva SignetSattva Resi Private Limited | 0.1 km | 329 | Aug 2024 | — | 0 | Not collected |
| Bhavya TrioraBhavya Constructions | 0.5 km | 206 | Jun 2031 | 1% | 0 | Not collected |
| HM ScottsvilleHM Infratech Private Limited | 0.5 km | 154 | Jun 2027extended | 82% | 0 | Not collected |
| Parth AtmosphereParth Estates | 0.5 km | 216 | Dec 2028 | 47% | 0 | Not collected |
| Roach CicadaRBD Shelters LLP | 0.9 km | 124 | Aug 2030 | 21% | 0 | Not collected |
| Sri Balaji VaibhavSri Balaji Builders | 0.9 km | 136 | Jun 2026 | — | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 12 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/446/PR/210222/004725.
- RERA record last checked: 12 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 15 Jul 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Bellandur
Kasavanahalli, Sarjapur RoadArtist’s impressionUnder constructionRERA registeredBuyers’ group openSalarpuria-Sattva Signet
by Sattva Resi
Price: Price on requestGet brochure & price →
- 1 BHK, 2 BHK, 3 BHK
- 497 – 1,153 sq ft
- Aug 2024
RERA not updated since promised Aug 2024 · 329 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Salarpuria-Sattva Signet
Kasavanahalli, Sarjapur RoadUnder constructionRERA registeredBuyers’ group openBhavya Triora
by Bhavya Constructions
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 695 – 1,019 sq ft
- Jun 2031
206 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Bhavya Triora
Kaikondrahalli, BellandurUnder constructionRERA registeredBuyers’ group openSri Balaji Vaibhav
by Sri Balaji Builders
Price: Price on requestGet brochure & price →
- 1 BHK, 2 BHK, 3 BHK
- 390 – 1,007 sq ft
- Jun 2026
RERA not updated since promised Jun 2026 · 136 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Sri Balaji Vaibhav