Isle Of Trees
3 & 4 BHK apartments by Happiness Harmony Property Developers Private Limited · Rachenahalli, Thanisandra, Bengaluru
Rachenahalli, Thanisandra, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
by Happiness Harmony Property Developers Private Limited
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Isle Of Trees at a glance
- Possession (RERA)May 2028Karnataka RERA
- Construction72% built · on pace for Aug 2027RERA filing to 30 Sep 2026; estimate from average pace
- Homes booked154 of 154 (100%)RERA update · as on 30 Sep 2026
- RERA complaints (project)1 complaintKarnataka RERA · as on 21 Oct 2026
- Approvals filed8 of 9 on RERAKarnataka RERA uploads · 21 Oct 2026
- Nearest metroNagawara · 2.27 km (under construction)Open now: Baiyappanahalli, 8.53 km · straight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 72 min at peak17.9 km straight line · estimate
- Nearest lakeRachenahalli Lake · 419 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Isle Of Trees is a residential project by Happiness Harmony Property Developers Private Limited in Rachenahalli, Bengaluru with 154 homes, registered with Karnataka RERA. The completion date on RERA is 29 May 2028.
Facts collected on 21 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Isle Of Trees buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Happiness Harmony Property Developers Private Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Isle Of Trees buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 3 BHK, 4 BHK
- Carpet area
- 895 – 1,409 sq ft
- Towers
- 2
- Floors
- 14
- Total homes
- 154
- Land
- 2.72 acres
- Possession (RERA)
- May 2028
- Built (RERA update)
- 72%
Isle Of Trees RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/446/PR/150724/006941
- Registered on
- 15 Jul 2024
- Promised completion
- 29 May 2028
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- 154 of 154 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| TOWER (AB) | 14 | 2 | 104 |
| TOWER (C) | 14 | 2 | 50 |
A dash (—) means the filing did not state that value.
Summary in plain English
Isle Of Trees is a 154-home residential project by Happiness Harmony Property Developers Private Limited in Rachenahalli, Bengaluru East. The project has 2 towers with 3 BHK and 4 BHK homes across 10,994 sq m of land. RERA shows a completion date of 29 May 2028.
Written by AI from the RERA record above on 21 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 81% of land
- Water and power
- Water source filed with RERA: BWSSB
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- HDFC, Richmond Road
- Building plan (RERA)
- BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Addl.Dir/JDNORTH/0107/23-24 · dated 14 Jun 2024
- Project cost declared to RERA
- ₹238 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- CCTV Surveillance
- Club House
- Multi purpose Hall
- Outdoor Amenities
- Other Amenities
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Isle Of Trees location and address
- Address
- Survey No 85/2 85/3B and 85/4 Katha No 38/85/2/85/3B/85/4 of Rachenahalli Village, Ward - 006 , K.R. Puram Hobli , Bengaluru East , Bengaluru Urban, Karnataka - 560077
- Village (RERA)
- Rachenahalli
- Locality
- ThanisandraAlso known as Thanisandra Main Road
- PIN code
- 560077
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.06140, 77.62166
Distances to landmarks
Not found in public records yet: landmarksAbout Thanisandra
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 1.49 km | approx. 6 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 10.84 km | approx. 44 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 15.02 km | approx. 61 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 16.62 km | approx. 67 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 17.9 km | approx. 72 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 24.01 km | approx. 97 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 23Schools and colleges17 schools, 4 colleges, 2 kindergartens
- 9Hospitals and clinics6 hospitals, 3 clinics
Nearest schools and colleges
- Ashoka Trust for Research in Ecology and Environment · 0.35 km
- Srujan Play Home · 0.39 km
- GHPS · 0.64 km
Nearest hospitals and clinics
- Sangameshwara Clinic · 1.26 km
- Shree Manyata Hospitals · 1.33 km
- Navya Hospital · 1.43 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Nagawara (ನಾಗವಾರ)Pink Line metro, under construction2.27 km
- Veerannapalya (ವೀರಣ್ಣಪಾಳ್ಯ)Blue Line metro, under construction2.3 km
- Kempapura (ಕೆಂಪಾಪುರ)Blue Line metro, under construction2.66 km
- Baiyappanahalli (ಬೈಯ್ಯಪ್ಪನಹಳ್ಳಿ ಮೆಟ್ರೋ ನಿಲ್ದಾಣ)Open now — nearest operating metro station8.53 km
- Hebbal (ಹೆಬ್ಬಾಳು)Nearest railway station4.37 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Rachenahalli Lake, 419 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Rachenahalli Lake on OpenStreetMap (opens in a new tab) (ರಾಚೇನಹಳ್ಳಿ ಕೆರೆ)419 m
- Sampigehalli Lake on OpenStreetMap (opens in a new tab) (ಸಂಪಿಗೆಹಳ್ಳಿ ಕೆರೆ)1,649 m
- Nagawara Lake on OpenStreetMap (opens in a new tab) (ನಾಗವಾರ ಕೆರೆ)1,988 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Isle Of Trees home types and carpet areas
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Approved building plan10 pages

Approved Building/Plotting PlanFull PDF on RERA
Approved layout plan3 files

CDP Map Demarcation.pngFull PDF on RERA 
Project Location and Demarcation.pdfFull PDF on RERA 
Village Map Demarcation.pdfFull PDF on RERA
Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.
Get brochure, floor plans & price| Home type | Carpet area | Homes |
|---|---|---|
| 3 BHK grande | 1,071 – 1,083 sq ft | 70 |
| 3 BHK premium | 895 sq ft | 34 |
| 4 BHK luxe | 1,403 – 1,409 sq ft | 50 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Isle Of Trees possession date and construction status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-14.
By tower (Q2 2026-27)
Units sold and unsold, from RERA (Q2 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 3 BHK GRANDE | 70 | 70 | 0 |
| 3 BHK PREMIUM | 34 | 34 | 0 |
| 4 BHK LUXE | 50 | 50 | 0 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 1 Jul 2024Project start date given to RERA
- 15 Jul 2024Registered with Karnataka RERA
- 29 May 2028Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Aug 2027 — about 9 months before the completion date on RERA (29 May 2028).
At the pace between the 4 quarterly filings we have (49% → 72% in 9 months), it would be around Aug 2027 — about 9 months before the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 14 Oct 2026 | 72% | 154 of 154 |
| Q1 2026-27to 30 Jun 2026 | 14 Jul 2026 | 71% | 154 of 154 |
| Q4 2025-26to 31 Mar 2026 | 5 May 2026 | 67% | 154 of 154 |
| Q3 2025-26to 31 Dec 2025 | 26 Jan 2026 | 49% | 154 of 154 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 72% ÷ 27 months (1 Jul 2024 to 30 Sep 2026) = 2.7% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 28 ÷ 2.7 = 10.5 months → Aug 2027. This is an estimate, not a date from the builder or RERA.
Pace between filings = (72% − 49%) ÷ 9 months = 2.6% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-14.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
13 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Building plan | BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Addl.Dir/JDNORTH/0107/23-24 · dated 2024-06-14 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion | District Commissioner office, Bangalore · No. ALN(E)SR: (K.HU):34/06-07 · dated 2009-01-24 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Addl.Dir/JDNORTH/0107/23-24 · dated 14 Jun 2024
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 21 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Isle Of Trees RERA complaints
1 complaint as on Source (rera.karnataka.gov.in) (opens in a new tab)
| Complaint ref | Filed | Subject | Status | Source |
|---|---|---|---|---|
| 00917/2026 | 29 Jul 2026 | Payments extracted unfairly & pre-maturely based on a deceptive Construction linked plan (CLP) that does not align to the approved project plan | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Happiness Harmony Property Developers Private Limited
- Promoter type
- Company
- Projects on this site
- 1
- RERA complaints against promoter
- 1
- Company number (CIN)
- U70200TN2018PTC121367
From Karnataka RERA, as collected so far (21 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Happiness Harmony Property Developers Private Limited’s RERA recordHappiness Harmony Property Developers Private Limited delivery record
- 1Projects in Bengaluru on RERA1 approved registration under Happiness Harmony Property Developers Private Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 154Homes registeredAs stated in each registrations.
- 1RERA complaints1 open, 0 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 6.5Complaints per 1,000 homes1 complaints ÷ 154 homes in its 1 registration on Karnataka RERA in Bengaluru.
What the complaints are about
1 complaint subject as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Jun 2024
- 14 Oct 2026Quarterly update filed for Q2 2026-27: 72% built, 154 of 154 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 29 Jul 2026Complaint 00917/2026 filed with RERA: “Payments extracted unfairly & pre-maturely based on a deceptive Construction linked plan (CLP) that does not align to the approved project plan” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Jul 2026Quarterly update filed for Q1 2026-27: 71% built, 154 of 154 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 5 May 2026Quarterly update filed for Q4 2025-26: 67% built, 154 of 154 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 26 Jan 2026Quarterly update filed for Q3 2025-26: 49% built, 154 of 154 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2024Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/150724/006941); completion date 29 May 2028 Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Jul 2024Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Jun 2024Building plan approved by BBMP - Bruhat Bengaluru Mahanagara Palike (No. BBMP/Addl.Dir/JDNORTH/0107/23-24) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Isle Of Trees FAQs
What is Isle Of Trees?
Isle Of Trees is a residential project with 154 homes in 2 towers, developed by Happiness Harmony Property Developers Private Limited in Rachenahalli, Bengaluru East.
When will Isle Of Trees be completed?
The RERA completion date is 29 May 2028.
What home types are available in Isle Of Trees?
The project has 3 BHK GRANDE (70 homes, 1,071 to 1,083 carpet sq ft), 4 BHK LUXE (50 homes, 1,403 to 1,409 carpet sq ft), and 3 BHK (34 homes, 895 carpet sq ft).
What is the RERA registration number for Isle Of Trees?
The RERA registration number is PRM/KA/RERA/1251/446/PR/150724/006941, registered on 15 July 2024.
How many homes are booked in Isle Of Trees?
As of Q2 2026-27 (30 September 2026), all 154 homes are in the booking table.
What is the construction progress on Isle Of Trees?
As of Q2 2026-27, construction is 72% complete.
What is the location and PIN code of Isle Of Trees?
Isle Of Trees is in Rachenahalli, Bengaluru East taluk, with PIN code 560077.
Are there any RERA complaints on Isle Of Trees?
There is 1 RERA complaint on the project as per the official register.
What is the escrow bank for Isle Of Trees?
The escrow bank is HDFC.
What other projects does the builder have?
Happiness Harmony Property Developers Private Limited has 1 other project in the Bengaluru records.
Written by AI from the RERA record above on 21 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Isle Of Trees
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Happiness Harmony Property Developers Private Limited? Review the builder.
Reviews of Happiness Harmony Property Developers Private Limited by verified buyers
No verified reviews of Happiness Harmony Property Developers Private Limited yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| High Life TowersMeenakshi Infrra Projects | 0.3 km | 198 | Aug 2027 | 49% | 0 | Not collected |
| SB Urban ParkSB Urbanscapes | 0.4 km | 160 | Nov 2026 | 23% | 1 | Not collected |
| NimahNimah Urbanscapes LLP | 0.6 km | 21 | Apr 2026extended | 75% | 0 | Not collected |
| Sumadhura SoleaSumadhura Infracon Private Limited | 0.6 km | 233 | Jun 2029 | 27% | 0 | from ₹2.2 Cr |
| SNN Estates FelicitySNN Builders Private Limited | 0.6 km | 580 | Dec 2028 | 58% | 1 | Not collected |
| Sumukha Nature's SymphonySumukha Ventures | 0.7 km | 30 | Feb 2030 | — | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 21 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/446/PR/150724/006941.
- RERA record last checked: 21 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 21 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Thanisandra
Rachenahalli, ThanisandraUnder constructionRERA registeredBuyers’ group openHigh Life Towers
by Meenakshi Infrra
Price: Price on requestGet brochure & price →
- 2 BHK, 2.5 BHK, 3 BHK, 4 BHK
- 674 – 1,887 sq ft
- Aug 2027
198 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for High Life Towers
Rachenahalli, ThanisandraUnder constructionRERA registeredBuyers’ group openSB Urban Park
by SB Urbanscapes
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 953 – 1,334 sq ft
- Nov 2026
160 homes · 1 RERA complaint
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for SB Urban Park
Rachenahalli, ThanisandraUnder constructionRERA registeredBuyers’ group openNimah
by Nimah Urbanscapes
Price: Price on requestGet brochure & price →
- 3 BHK
- 2,562 – 8,171 sq ft
- Apr 2026 (extended)
RERA not updated since promised Apr 2026 · 21 homes