  • Completion filed with RERA
  • RERA registered
  • residential

Ready homes still available: 15 of 248 homes were unsold when the builder filed completion with RERA (1 Jul 2026). Some may have sold since — join the group and we’ll ask the builder what is left and for a group price.

by Jeevan Developers

Price: Price on request

Get brochure, floor plans & price

Brochure, floor plans and price list for Jeevans Octave

Builders share their brochure, floor plans and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Project summary

Jeevans Octave is a residential project by Jeevan Developers in Seegehalli, Bengaluru with 274 homes, registered with Karnataka RERA. The completion date on RERA is 30 Jun 2026.

Facts collected on 4 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.

Jeevans Octave buyers’ group: join to ask for a group price

No one has joined yet. Be one of the first 10 buyers in this group — the founding members.

Join free. When enough buyers have joined, our agent partner asks Jeevan Developers for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.

  1. Gathering buyers
  2. Talking to the builder
  3. Group offer
  4. Group site visit
  5. Booking

0 buyers have joined · 0 committed

Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.

Join the Jeevans Octave buyers’ groupHow group buying works

See it for yourself

Visit the site with our team, or get a call to clear your questions. Free, no obligation.

Key facts: home types, towers, land and possession

Updated on 4 Oct 2026
Home types
2 BHK, 2.5 BHK, 3 BHK
Carpet area
744 – 1,067 sq ft
Towers
1
Floors
9
Total homes
274
Land
3.09 acres
Possession (extended)
Jun 2026
Built (RERA update)
100%

Jeevans Octave RERA number and registration details

RERA number
PRM/KA/RERA/1251/446/PR/120922/005233
Registered on
12 Sep 2022
Promised completion
30 Jun 2025
Extended to
30 Jun 2026
RERA status
Completed
Homes booked
233 of 274 as on
Price
Not found in public records yet: price
Project type
Residential

Towers and blocks (RERA filing)

TowerFloorsBasementsHomes
JEEVANS OCTAVE91336

A dash (—) means the filing did not state that value.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Summary in plain English

Jeevans Octave is a residential project by Jeevan Developers in Seegehalli, Bengaluru East, with 274 homes across 1 tower and 9 floors. The project includes 3 BHK, 2.5 BHK and 2 BHK homes. The completion date on RERA is 30 June 2026.

Written by AI from the RERA record above on 5 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.

Open space, home loans, escrow and other details

Open space
32.8% of land
Water and power
Water source filed with RERA: BoreWell,BWSSB
Home loans: approved banks
Not found in public records yet: bank approvals
Payment plans
Not found in public records yet: payment plans
Maintenance
Not found in public records yet: maintenance
Car parking
Not found in public records yet: car parking charge
Escrow bank (RERA)
HDFC, KADUGODI
Building plan (RERA)
BDA - Bangalore Development Authority · No. 1/4/3/22-23 · dated 25 Apr 2022
Project cost declared to RERA
₹124 Cr

Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Amenities

  • Electricity
  • CCTV Surveillance
  • Swimming Pool
  • Power Backup
  • Water and Sanitation

Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Jeevans Octave location and address

Address
No 95/3, Chaithanya Ananya Road, , Seegehalli Village, , Bengaluru East , Bengaluru Urban, Karnataka - 560067
Village (RERA)
Seegehalli
Locality
Kadugodi–Hope FarmAlso known as Kadugodi, Hope Farm
PIN code
560067
City
Bengaluru
State
Karnataka
Coordinates
13.00728, 77.76150

Distances to landmarks

Not found in public records yet: landmarks

About Kadugodi–Hope Farm

Not found in public records yet: locality facts

Commute times to tech parks and the airport

As on 5 Oct 2026
ToStraight linePeak-hour drive (estimate)
ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab)3.37 kmapprox. 14 min
Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab)12.73 kmapprox. 52 min
Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab)16 kmapprox. 65 min
Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab)20.41 kmapprox. 83 min
KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab)21.05 kmapprox. 85 min
Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab)22.38 kmapprox. 91 min
How we calculate

Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.

Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.

Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this

Schools and hospitals nearby

As on 5 Oct 2026

Within 2 km

  • 17Schools and colleges15 schools, 2 colleges, 0 kindergartens
  • 6Hospitals and clinics5 hospitals, 1 clinics

Nearest schools and colleges

  • Valistus International School · 0.17 km
  • Chryalis High · 0.65 km
  • Sri Sathya Sai Institute of Higher Learning · 0.69 km

Nearest hospitals and clinics

  • Miracle Hospital · 0.34 km
  • Nationwide Kadugodi Clinic · 0.47 km
  • Telerad RXDX Kadugodi · 0.7 km

Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Nearest metro station and railway

As on 5 Oct 2026
  • Whitefield (Kadugodi) (ವೈಟ್‌ಫೀಲ್ಡ್ (ಕಾಡುಗೋಡಿ))Open now — nearest operating metro station1.34 km
  • Whitefield (ವೈಟ್‌ಫೀಲ್ಡ್)Nearest railway station1.21 km

Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Lake and lake-buffer check

As on 5 Oct 2026

The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 701 m from the project’s RERA map point.

The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.

The buffer rule

Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.

Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this

Satellite time-lapse of the site

Satellite photos load when you scroll to them.

Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.

Sources:Source (livingatlas.arcgis.com) (opens in a new tab)

Jeevans Octave home types and carpet areas

Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.

Get brochure, floor plans & price

Brochure, floor plans and price list for Jeevans Octave

Builders share their brochure, floor plans and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Home typeCarpet areaHomes
2 BHK744 – 751 sq ft148
2.5 BHK899 – 973 sq ft98
3 BHK976 – 1,067 sq ft126

Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).

We have not collected floor-plan drawings; the builder’s sales team can share them.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Jeevans Octave possession date and construction status

  • Whole project (promoter’s RERA update)100%

    as on · 233 of 274 homes booked

Promoter’s quarterly update to RERA for Q1 2026-27, submitted 2026-06-24.

Units sold and unsold, from RERA (Q1 2026-27)

TypeHomesBookedAvailable
2.5 BHK987820
2 BHK18011763
3 BHK583820

As reported by the promoter in the quarterly update to RERA, not verified by us.

Timeline

  1. 1 Jun 2022Project start date given to RERA
  2. 12 Sep 2022Registered with Karnataka RERA
  3. 30 Jun 2025Completion date given at registration
  4. 30 Jun 2026Section 6 Extension: completion date moved to this date
  5. 1 Jul 2026Promoter applied to RERA for completion

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Approvals and documents checklist

14 rows: approvals. Scroll inside the table to see them all.

ApprovalAuthoritySource
Building planBDA - Bangalore Development Authority · No. 1/4/3/22-23 · dated 2022-04-25Source (rera.karnataka.gov.in) (opens in a new tab)
Land conversion (5 orders)Tasildar, Bangalore East · No. ALN(EBK)SR03/19-20 and 4 more · dated 2020-02-01Source (rera.karnataka.gov.in) (opens in a new tab)
Commencement Certificatescan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Electricity Permission Letterscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Water Permission Letterscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Building/Plotting Planscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Section Of Building/Infrastructure Plan of Plottingscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Conversion Certificate under section 95 of the KLR Act 1964scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
ESCOM/Electricityscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KWSSB/Waterscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Fire Force Departmentscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Airport Authority of Indiascan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KSPCBscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
SEIAAscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)

Documents uploaded to RERA

As on 4 Oct 2026
  • Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BDA - Bangalore Development Authority · No. 1/4/3/22-23 · dated 25 Apr 2022
  • Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet

From the documents the promoter uploaded to Karnataka RERA, collected 4 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Jeevans Octave RERA complaints and orders

3 complaints as on Source (rera.karnataka.gov.in) (opens in a new tab)

Complaint refFiledSubjectStatusSource
01350/20235 Sep 2023Refund and compensation for the Plot no 21DisposedSource (rera.karnataka.gov.in) (opens in a new tab)
01351/20235 Sep 2023Refund of the investment with compensationDisposedSource (rera.karnataka.gov.in) (opens in a new tab)
00091/202318 Jan 2023Revocation of the RERA Registration Granted to the ProjectDisposedSource (rera.karnataka.gov.in) (opens in a new tab)

Court and consumer cases

Not found in public records yet: court cases

We list case numbers, courts and outcomes only — never names of private individuals.

About Jeevan Developers

Promoter type
Partnership Firm
Projects on this site
2
RERA complaints against promoter
3
Company number (CIN)
Not found in public records yet: CIN

From Karnataka RERA, as collected so far (4 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.

Jeevan Developers’s RERA record

Jeevan Developers delivery record

As on 20 Oct 2026
  • 2Projects in Bengaluru on RERA2 approved registrations under Jeevan Developers in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
  • 426Homes registeredAs stated in each registrations.
  • 3RERA complaints0 open, 3 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
  • 7Complaints per 1,000 homes3 complaints ÷ 426 homes in its 2 registrations on Karnataka RERA in Bengaluru.
  • 1Completion filed on RERARegistrations where the promoter applied to RERA for completion; 1 with an occupancy certificate on RERA.
  • 0 of 1Filed by the date given at registrationMedian gap 12 months (on-time ones count as 0). The completion application can come after handover, so this is an upper bound on lateness.

What the complaints are about

  • Refund of booking or other money2
  • Registration, sale deed or agreement1

3 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)

Completion filed on RERA

ProjectDate at registrationCompletion filedGap
Jeevans OctaveOC on RERA30 Jun 2025extended to 30 Jun 20261 Jul 202612 months after

Measured against the completion date given at registration; many projects had RERA extensions (including the COVID-period extension), shown under the date.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

What’s changed since Apr 2022

As on 4 Oct 2026
  1. 1 Jul 2026Promoter applied to RERA for completion (occupancy certificate on RERA) Source (rera.karnataka.gov.in) (opens in a new tab)
  2. 30 Jun 2026Completion date extended to 30 Jun 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
  3. 24 Jun 2026Quarterly update filed for Q1 2026-27: 100% built, 233 of 336 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  4. 15 Apr 2026Quarterly update filed for Q4 2025-26: 100% built, 233 of 336 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  5. 21 Jan 2026Quarterly update filed for Q3 2025-26: 100% built, 224 of 336 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  6. 5 Sep 2023Complaint 01350/2023 filed with RERA: “Refund and compensation for the Plot no 21” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  7. 5 Sep 2023Complaint 01351/2023 filed with RERA: “Refund of the investment with compensation” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  8. 18 Jan 2023Complaint 00091/2023 filed with RERA: “Revocation of the RERA Registration Granted to the Project” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  9. 12 Sep 2022Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/120922/005233); completion date 30 Jun 2025 Source (rera.karnataka.gov.in) (opens in a new tab)
  10. 1 Jun 2022Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
  11. 25 Apr 2022Building plan approved by BDA - Bangalore Development Authority (No. 1/4/3/22-23) Source (rera.karnataka.gov.in) (opens in a new tab)

Newest first. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.

Home loan EMI calculator

No listed price found — enter one to try.

Example only — use your bank’s quote.

Monthly EMI
—
Down payment
—
Loan amount
—
Total interest
—

A calculation only, from the numbers you enter — not a loan offer.

All-in cost: GST, registration and other charges

The calculator loads when you scroll to it.

Assumptions
  • Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
  • GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
  • Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
  • Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
  • Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.

How we calculate this

Jeevans Octave FAQs

What is the RERA registration number for Jeevans Octave?

The RERA registration number is PRM/KA/RERA/1251/446/PR/120922/005233, registered on 12 September 2022.

What home types are available in Jeevans Octave?

The project has 3 BHK homes with carpet area from 976 to 1,067 sq ft (126 homes), 2 BHK homes with carpet area from 744 to 751 sq ft (148 homes), and 2.5 BHK homes with carpet area from 899 to 973 sq ft (98 homes).

How many homes are in Jeevans Octave?

Jeevans Octave has 274 homes in total.

When is Jeevans Octave expected to be completed?

The completion date on RERA is 30 June 2026. The project had one extension under Section 6.

What is the construction status of Jeevans Octave?

As of Q1 2026-27 (quarter ended 30 June 2026), construction is 100% complete and an occupancy certificate has been uploaded.

How many homes in Jeevans Octave have been booked?

In the latest quarterly update (Q1 2026-27), 233 homes have been booked out of 274.

Where is Jeevans Octave located?

Jeevans Octave is in Seegehalli, Bengaluru East taluk, Bengaluru Urban district, PIN code 560067.

How many RERA complaints are there on Jeevans Octave?

There are 3 RERA complaints on this project.

Who is the builder of Jeevans Octave and what is their track record?

The builder is Jeevan Developers, a Partnership Firm. Jeevan Developers has 3 complaints recorded against them across all projects and 3 projects in the Karnataka RERA records.

Which bank holds the escrow account for Jeevans Octave?

HDFC is the escrow bank for Jeevans Octave.

Written by AI from the RERA record above on 5 Oct 2026. Answers use only that record; check them against the source before you decide.

Questions about Jeevans Octave

No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.

Bought a home from Jeevan Developers? Review the builder.

Reviews of Jeevan Developers by verified buyers

No verified reviews of Jeevan Developers yet. If you bought a home from them, your review helps other buyers.

How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.

Similar projects within 5 km

ProjectDistanceHomesPossession (RERA)BuiltComplaintsPrice
SSVD SerenitySri Sai Venkateshwara Developers0.3 km56Jun 202912%0Not collected
Nirmaanika ARIANirmaanika Projects0.4 km68Dec 202750%0Not collected
SBR FlorensoSBR Infra0.4 km104Dec 202760%0Not collected
Ashraya MeadowsAshraya Constructions0.6 km36Dec 202985%0Not collected
Sterling Villa GrandeSterling Urban Developments Private Limited0.6 km173Jun 2026—1Not collected
Green Edge CaseroGreen Edge Projects0.6 km117Dec 2026—0Not collected

Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sources and last checked dates

  1. Karnataka RERA — project register (search by the registration number) (opens in a new tab)

Collected on 4 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.

How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/446/PR/120922/005233.

  • RERA record last checked: 4 Oct 2026
  • Last change in the record (registration, quarterly filing or complaint): 24 Jun 2026

How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error

More new projects in Kadugodi–Hope Farm