Skip to content
Log in

Legacy Maximus

Commercial project by Legacy Global Projects Pvt Ltd · Richmond Road, Bengaluru

Richmond Road, BengaluruOpen on Google Maps (opens in a new tab)

  • Under construction
  • RERA registered
  • commercial

by Legacy Global Projects Pvt Ltd

Price: Price on request

Get brochure, floor plans & price

Brochure, floor plans and price list for Legacy Maximus

Builders share their brochure, floor plans and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Project summary

Legacy Maximus is a commercial project by Legacy Global Projects Pvt Ltd in Bengaluru with 12 homes, registered with Karnataka RERA. The completion date on RERA is 31 Dec 2027.

Not in the RERA record we collected yet: locality. This page fills in as the record is collected.

Facts collected on 16 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.

Legacy Maximus buyers’ group: join to ask for a group price

No one has joined yet. Be one of the first 10 buyers in this group — the founding members.

Join free. When enough buyers have joined, our agent partner asks Legacy Global Projects Pvt Ltd for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.

  1. Gathering buyers
  2. Talking to the builder
  3. Group offer
  4. Group site visit
  5. Booking

0 buyers have joined · 0 committed

Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.

Join the Legacy Maximus buyers’ groupHow group buying works

See it for yourself

Visit the site with our team, or get a call to clear your questions. Free, no obligation.

Key facts: home types, towers, land and possession

Updated on 16 Oct 2026
Home types
Not found in public records yet: home types
Carpet area
8,584 – 10,435 sq ft
Towers
1
Floors
14
Total homes
12
Land
0.79 acres
Possession (RERA)
Dec 2027
Built (RERA update)
55%

Legacy Maximus RERA number and registration details

RERA number
PRM/KA/RERA/1251/309/PR/310125/007465
Registered on
31 Jan 2025
Promised completion
31 Dec 2027
Extended to
No extension recorded
RERA status
Under construction
Homes booked
6 of 12 as on
Price
Not found in public records yet: price
Project type
Commercial

Towers and blocks (RERA filing)

TowerFloorsBasementsHomes
LEGACY MAIMUS14313

A dash (—) means the filing did not state that value.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Summary in plain English

Legacy Maximus is a commercial project by Legacy Global Projects Pvt Ltd in Bengaluru North with 12 homes across 1 tower of 14 floors. The project is registered with Karnataka RERA and is scheduled for completion on 31 December 2027.

Written by AI from the RERA record above on 16 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.

Open space, home loans, escrow and other details

Open space
64.4% of land
Water and power
Water source filed with RERA: BoreWell
Home loans: approved banks
Not found in public records yet: bank approvals
Payment plans
Not found in public records yet: payment plans
Maintenance
Not found in public records yet: maintenance
Car parking
Not found in public records yet: car parking charge
Escrow bank (RERA)
KOTAK MAHINDRA BANK, MG Road
Building plan (RERA)
BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/ADDLDIR/JDCENTRAL/0017/19-20 · dated 11 May 2020
Project cost declared to RERA
₹109 Cr

Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Amenities

  • Electricity
  • CCTV Surveillance
  • Power Backup
  • Water and Sanitation

Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Legacy Maximus location and address

Address
Khatha No. 80, PID No. 76-15-80 , Residency Road, Richmond town, Ward No 111 (Old ward No 76) , Bengaluru North , Bengaluru Urban, Karnataka - 560025
Village (RERA)
Not found in public records yet: village
Locality
Richmond RoadAlso known as Richmond Town
PIN code
560025
City
Bengaluru
State
Karnataka
Coordinates
12.97173, 77.60729

Distances to landmarks

Not found in public records yet: landmarks

About Richmond Road

Not found in public records yet: locality facts

Commute times to tech parks and the airport

As on 5 Oct 2026
ToStraight linePeak-hour drive (estimate)
KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab)4.15 kmapprox. 17 min
Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab)8.61 kmapprox. 35 min
Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab)9.63 kmapprox. 39 min
ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab)14.25 kmapprox. 58 min
Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab)14.94 kmapprox. 61 min
Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab)27.55 kmapprox. 112 min
How we calculate

Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.

Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.

Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this

Schools and hospitals nearby

As on 5 Oct 2026

Within 2 km

  • 96Schools and colleges69 schools, 19 colleges, 8 kindergartens
  • 56Hospitals and clinics28 hospitals, 28 clinics

Nearest schools and colleges

  • St. Patrick's High School · 0.16 km
  • St. Patrick's Nursery School · 0.18 km
  • St Josephs College of Commerce · 0.18 km

Nearest hospitals and clinics

  • Tibetan Healing & Wellness Center · 0.08 km
  • Narayana Netralaya · 0.56 km
  • Renew Medical Center · 0.7 km

Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Nearest metro station and railway

As on 5 Oct 2026
  • Mahatma Gandhi Road (ಮಹಾತ್ಮ ಗಾಂಧಿ ರಸ್ತೆ)Open now — nearest operating metro station0.43 km
  • Bangalore Cantonment (ಬೆಂಗಳೂರು (ಕಂಟೊನ್ಮೆಂಟ್))Nearest railway station2.64 km

Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Lake and lake-buffer check

As on 5 Oct 2026

The nearest mapped lake is Halasuru lake, 1,434 m from the project’s RERA map point.

The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.

The buffer rule

Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.

Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this

Satellite time-lapse of the site

Satellite photos load when you scroll to them.

Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.

Sources:Source (livingatlas.arcgis.com) (opens in a new tab)

Legacy Maximus floor plans, brochure and elevations

Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.

Floor plans6 files

Elevations

Approved building plan4 files

Approved layout plan2 files

Home typeCarpet areaHomes
Commercial8,584 – 10,435 sq ft13
Commercial unit10,085 sq ft13

Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).

We have not collected floor-plan drawings; the builder’s sales team can share them.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Legacy Maximus possession date and construction status

  • Whole project (promoter’s RERA update)55%

    as on · 6 of 12 homes booked

Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.

Units sold and unsold, from RERA (Q2 2026-27)

TypeHomesBookedAvailable
COMMERCIAL1367

As reported by the promoter in the quarterly update to RERA, not verified by us.

Timeline

  1. 27 Jan 2022Project start date given to RERA
  2. 31 Jan 2025Registered with Karnataka RERA
  3. 31 Dec 2027Completion date given at registration

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Construction pace from RERA quarterly filings

As on 15 Oct 2026

At the average pace so far, construction would reach 100% around Jul 2030 — about 31 months after the completion date on RERA (31 Dec 2027).

At the pace between the 4 quarterly filings we have (47% → 55% in 9 months), it would be around Dec 2030 — about 35 months after the RERA date.

0%25%50%75%100%202320242025202620272028202920302031RERA date47%48%48%55%
  • Filed on RERA
  • Average pace since start
  • Pace between filings (and 0% assumed at the start date)
  • RERA completion date

Quarterly filings

QuarterFiled onBuiltHomes booked
Q2 2026-27to 30 Sep 202615 Oct 202655%6 of 13
Q1 2026-27to 30 Jun 202615 Jul 202648%6 of 13
Q4 2025-26to 31 Mar 202615 Apr 202648%6 of 13
Q3 2025-26to 31 Dec 20254 Feb 202647%6 of 13
How we calculate

Average pace = % built ÷ months since the start date in the RERA record. Here: 55% ÷ 56.1 months (27 Jan 2022 to 30 Sep 2026) = 1% a month.

Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 45 ÷ 1 = 45.9 months → Jul 2030. This is an estimate, not a date from the builder or RERA.

Pace between filings = (55% − 47%) ÷ 9 months = 0.9% a month.

A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

Approvals and documents checklist

11 rows: approvals. Scroll inside the table to see them all.

ApprovalAuthoritySource
Building planBBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/ADDLDIR/JDCENTRAL/0017/19-20 · dated 2020-05-11Source (rera.karnataka.gov.in) (opens in a new tab)
Commencement Certificatescan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Electricity Permission Letterscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Water Permission Letterscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Building/Plotting Planscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Section Of Building/Infrastructure Plan of Plottingscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
ESCOM/Electricityscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KWSSB/Waterscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Fire Force Departmentscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KSPCBscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
SEIAAscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)

Documents uploaded to RERA

As on 16 Oct 2026
  • Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/ADDLDIR/JDCENTRAL/0017/19-20 · dated 11 May 2020
  • Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Height clearance · Airports Authority of IndiaNot on RERA yet
  • Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion

From the documents the promoter uploaded to Karnataka RERA, collected 16 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Legacy Maximus RERA complaints

No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)

Court and consumer cases

Not found in public records yet: court cases

We list case numbers, courts and outcomes only — never names of private individuals.

About Legacy Global Projects Pvt Ltd

Promoter type
Company
Projects on this site
5
RERA complaints against promoter
18
Company number (CIN)
U74140KA2008PTC044851

From Karnataka RERA, as collected so far (16 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.

Legacy Global Projects Pvt Ltd’s RERA record

Legacy Global Projects Pvt Ltd delivery record

As on 16 Oct 2026

What the complaints are about

  • Delay in possession or delay interest3
  • Registration, sale deed or agreement2
  • Refund of booking or other money1
  • Other12

18 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

What’s changed since May 2020

As on 16 Oct 2026
  1. 15 Oct 2026Quarterly update filed for Q2 2026-27: 55% built, 6 of 13 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  2. 15 Jul 2026Quarterly update filed for Q1 2026-27: 48% built, 6 of 13 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  3. 15 Apr 2026Quarterly update filed for Q4 2025-26: 48% built, 6 of 13 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  4. 4 Feb 2026Quarterly update filed for Q3 2025-26: 47% built, 6 of 13 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  5. 31 Jan 2025Registered with Karnataka RERA (PRM/KA/RERA/1251/309/PR/310125/007465); completion date 31 Dec 2027 Source (rera.karnataka.gov.in) (opens in a new tab)
  6. 27 Jan 2022Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
  7. 11 May 2020Building plan approved by BBMP - Bruhat Bengaluru Mahanagara Palike (No. BBMP/ADDLDIR/JDCENTRAL/0017/19-20) Source (rera.karnataka.gov.in) (opens in a new tab)

Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.

Home loan EMI calculator

No listed price found — enter one to try.

Example only — use your bank’s quote.

Monthly EMI
—
Down payment
—
Loan amount
—
Total interest
—

A calculation only, from the numbers you enter — not a loan offer.

Legacy Maximus FAQs

What is Legacy Maximus?

Legacy Maximus is a commercial project comprising 12 commercial units in Bengaluru North, registered with Karnataka RERA on 31 January 2025.

Where is Legacy Maximus located?

The project is located in Bengaluru North taluk, Bengaluru Urban district, PIN code 560025.

What is the completion date for Legacy Maximus?

According to the RERA record, the project is scheduled for completion on 31 December 2027.

How many commercial units are in Legacy Maximus?

The project has 12 commercial units across 1 tower with a maximum of 14 floors.

What are the carpet areas for units in Legacy Maximus?

Commercial units have carpet areas ranging from 8,584 sq ft to 10,435 sq ft, and commercial units range from 10,085 sq ft to 10,085 sq ft.

What is the construction progress of Legacy Maximus?

As of Q2 2026-27 (quarter ended 30 September 2026), the project is 55 percent complete.

How many units are booked in Legacy Maximus?

As of Q2 2026-27, 6 units are booked and 13 units are in the booking table.

What is the RERA registration number for Legacy Maximus?

The RERA registration number is PRM/KA/RERA/1251/309/PR/310125/007465.

Are there any complaints against Legacy Maximus on RERA?

There are no RERA complaints on this project registration.

What is the builder's track record with RERA?

Legacy Global Projects Pvt Ltd has 11 projects on record with Karnataka RERA and 18 RERA complaints across all its projects.

Written by AI from the RERA record above on 16 Oct 2026. Answers use only that record; check them against the source before you decide.

Questions about Legacy Maximus

No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.

Bought a home from Legacy Global Projects Pvt Ltd? Review the builder.

Reviews of Legacy Global Projects Pvt Ltd by verified buyers

No verified reviews of Legacy Global Projects Pvt Ltd yet. If you bought a home from them, your review helps other buyers.

How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.

Sources and last checked dates

  1. Karnataka RERA — project register (search by the registration number) (opens in a new tab)

Collected on 16 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.

How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/309/PR/310125/007465.

  • RERA record last checked: 16 Oct 2026
  • Last change in the record (registration, quarterly filing or complaint): 16 Oct 2026

How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error

More new projects in Richmond Road

  • Bilekahalli, Bannerghatta Road© Esri, Maxar, Earthstar GeographicsReady to moveRERA registeredBuyers’ group open

    Vaishnavi Senate

    by Vaishnavi Infrastructure

    Price: Price on requestGet brochure & price →

    • Types not found
    • 9,838 – 43,551 sq ft
    • Dec 2026

    11 homes

    Be one of the first 10 buyers in this groupFounding members — it’s free

    Join group for Vaishnavi Senate
  • Purva Zentech: Site photo filed with Karnataka RERADoddakalasandra, Kanakapura RoadUnder constructionRERA registeredBuyers’ group open

    Purva Zentech

    by Purva Ruby Properties

    Price: Price on requestGet brochure & price →

    • Types not found
    • 2,906 – 57,490 sq ft
    • Jun 2027

    18 homes

    Be one of the first 10 buyers in this groupFounding members — it’s free

    Join group for Purva Zentech