Mahaveer Crest
1, 2 & 3 BHK apartments by Reddy Structures Private Limited · Hirandahalli, Old Madras Road, Bengaluru
Hirandahalli, Old Madras Road, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
by Reddy Structures Private Limited
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Mahaveer Crest at a glance
- Possession (RERA)Sep 2031Karnataka RERA
- RERA complaints (project)None listedKarnataka RERA · as on 18 Oct 2026
- Approvals filed6 of 9 on RERAKarnataka RERA uploads · 18 Oct 2026
- Nearest metroGarudacharpalya · 5.1 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 75 min at peak18.42 km straight line · estimate
- Nearest lakeYellamallappa Chetty Lake · 398 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Mahaveer Crest is a residential project by Reddy Structures Private Limited in Hirandahalli, Bengaluru with 520 homes, registered with Karnataka RERA. The completion date on RERA is 30 Sep 2031.
Facts collected on 18 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Mahaveer Crest buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Reddy Structures Private Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Mahaveer Crest buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 1 BHK, 2 BHK, 3 BHK
- Carpet area
- 454 – 1,202 sq ft
- Towers
- 12
- Floors
- 4
- Total homes
- 520
- Land
- 8.5 acres
- Possession (RERA)
- Sep 2031
- Built (RERA update)
- Not found in public records yet: construction progress
Mahaveer Crest RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/446/PR/170726/008823
- Registered on
- 17 Jul 2026
- Promised completion
- 30 Sep 2031
- Extended to
- No extension recorded
- RERA status
- Under construction
- Homes booked
- Not found in public records yet: homes booked
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
12 rows: towers. Scroll inside the table to see them all.
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| WING 1 (Block A) | 4 | 1 | 40 |
| WING 2 (Block A) | 4 | 1 | 45 |
| WING 3 (Block A) | 4 | 1 | 35 |
| WING 4 (Block A) | 4 | 1 | 40 |
| WING 5 (Block A) | 4 | 1 | 45 |
| WING 6 (Block A) | 4 | 1 | 35 |
| WING 7 (Block A) | 4 | 1 | 45 |
| WING 8 (Block A) | 4 | 1 | 40 |
| WING 9 (Block A) | 4 | 1 | 25 |
| WING 10 (Block B) | 4 | 1 | 80 |
| WING 11 (Block B) | 4 | 1 | 50 |
| WING 12 (Block B) | 4 | 1 | 40 |
A dash (—) means the filing did not state that value.
Summary in plain English
Mahaveer Crest is a residential project by Reddy Structures Private Limited in Hirandahalli, Bengaluru East. The project has 520 homes across 12 towers with a maximum of 4 floors. Completion is scheduled for 30 September 2031.
Written by AI from the RERA record above on 18 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 68.1% of land
- Water and power
- Water source filed with RERA: BoreWell,Local Authority
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- HDFC, Kasturba Gandhi Marg(9)
- Building plan (RERA)
- BDA - Bangalore Development Authority · No. 28/2025-26 · dated 7 Nov 2025
- Project cost declared to RERA
- ₹294 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- Club House
- Outdoor Sports facility
- Indoor Sports facility
- Swimming Pool
- Gym
- Parks
- Power Backup
- Water and Sanitation
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Mahaveer Crest location and address
- Address
- Sy no 99/1, 99/2, 100/1 and 100/2 of Hirandahalli Village , Bidarahalli Hobli , Bengaluru East , Bengaluru Urban, Karnataka - 560049
- Village (RERA)
- Hirandahalli
- Locality
- Old Madras RoadAlso known as OMR, Old Madras Road
- PIN code
- 560049
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.03589, 77.72158
Distances to landmarks
Not found in public records yet: landmarksAbout Old Madras Road
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 5.64 km | approx. 23 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 11.1 km | approx. 45 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 13.22 km | approx. 54 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 17.68 km | approx. 72 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 18.42 km | approx. 75 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 21.6 km | approx. 87 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 14Schools and colleges10 schools, 4 colleges, 0 kindergartens
- 4Hospitals and clinics4 hospitals, 0 clinics
Nearest schools and colleges
- Divine Grace Institute of Health Sciences · 0.79 km
- St. Gaspar Vidyalaya · 0.83 km
- Princeton Public School · 1.18 km
Nearest hospitals and clinics
- S.N. Hospital · 1.42 km
- Geetha Hospital · 1.47 km
- Sathya Sai Lake Side Ortho Hospital · 1.85 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Garudacharpalya (ಗರುಡಾಚಾರ್ ಪಾಳ್ಯ)Open now — nearest operating metro station5.1 km
- Hoodi Nearest railway station4.45 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Yellamallappa Chetty Lake, 398 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Yellamallappa Chetty Lake on OpenStreetMap (opens in a new tab) (ಯೆಲ್ಲಮಲ್ಲಪ್ಪ ಚೆಟ್ಟಿ ಕೆರೆ)398 m
- Bhattarahalli Lake on OpenStreetMap (opens in a new tab) 1,731 m
- Seegehalli Lake on OpenStreetMap (opens in a new tab) (ಸೀಗೆಹಳ್ಳಿ ಕೆರೆ)1,886 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Mahaveer Crest home types and carpet areas
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Approved building plan

Approved Building PlanFull PDF on RERA
Approved layout plan2 files

CDP Map Demarcation.jpegFull PDF on RERA 
Hirandahalli Village Map Demarcation.pdfFull PDF on RERA
Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.
Get brochure, floor plans & price| Home type | Carpet area | Homes |
|---|---|---|
| 1 BHK | 454 – 500 sq ft | 20 |
| 2 BHK | 464 – 934 sq ft | 140 |
| 3 BHK | 649 – 1,202 sq ft | 360 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Mahaveer Crest possession date and construction status
Timeline
- 2 Apr 2026Project start date given to RERA
- 17 Jul 2026Registered with Karnataka RERA
- 30 Sep 2031Completion date given at registration
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Building plan | BDA - Bangalore Development Authority · No. 28/2025-26 · dated 2025-11-07 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (3 orders) | DC Office, Bangalore · No. 70/2008-09 and 2 more · dated 2015-03-18 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BDA - Bangalore Development Authority · No. 28/2025-26 · dated 7 Nov 2025
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 18 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Mahaveer Crest RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Reddy Structures Private Limited
- Promoter type
- Company
- Projects on this site
- 4
- RERA complaints against promoter
- 102
- Company number (CIN)
- U07010KA2002PTC031181
From Karnataka RERA, as collected so far (18 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Reddy Structures Private Limited’s RERA recordReddy Structures Private Limited delivery record
- 4Projects in Bengaluru on RERA4 approved registrations under Reddy Structures Private Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 960Homes registeredAs stated in each registrations.
- 102RERA complaints0 open, 102 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 106.3Complaints per 1,000 homes102 complaints ÷ 960 homes in its 4 registrations on Karnataka RERA in Bengaluru.
What the complaints are about
102 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Nov 2025
- 17 Jul 2026Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/170726/008823); completion date 30 Sep 2031 Source (rera.karnataka.gov.in) (opens in a new tab)
- 2 Apr 2026Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 7 Nov 2025Building plan approved by BDA - Bangalore Development Authority (No. 28/2025-26) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Mahaveer Crest FAQs
What is the RERA registration number for Mahaveer Crest?
The RERA registration number is PRM/KA/RERA/1251/446/PR/170726/008823, registered on 17 July 2026.
What home types are available in Mahaveer Crest?
The project has 3 BHK (360 homes), 2 BHK (140 homes), and 1 BHK (20 homes) options.
What is the carpet area range for 3 BHK homes in Mahaveer Crest?
The carpet area for 3 BHK homes ranges from 649 sq ft to 1,202 sq ft.
What is the carpet area range for 2 BHK homes in Mahaveer Crest?
The carpet area for 2 BHK homes ranges from 464 sq ft to 934 sq ft.
What is the carpet area range for 1 BHK homes in Mahaveer Crest?
The carpet area for 1 BHK homes ranges from 454 sq ft to 500 sq ft.
When is Mahaveer Crest scheduled for completion?
The completion date is 30 September 2031.
Where is Mahaveer Crest located?
Mahaveer Crest is in Hirandahalli, Bengaluru East, PIN code 560049.
Are there any RERA complaints on Mahaveer Crest?
There are no RERA complaints registered on this project.
Who is the builder of Mahaveer Crest and what is their RERA record?
The builder is Reddy Structures Private Limited, a company with 102 complaints against it across all projects and 11 projects on record in Bengaluru.
What is the escrow bank for Mahaveer Crest?
The escrow bank is HDFC.
Written by AI from the RERA record above on 18 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Mahaveer Crest
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Reddy Structures Private Limited? Review the builder.
Reviews of Reddy Structures Private Limited by verified buyers
No verified reviews of Reddy Structures Private Limited yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Radheshyam Karnasree BrindavanRadheshyam Builders | 0.5 km | 232 | Dec 2028 | 14% | 0 | Not collected |
| Aakruthi NestKriti Builders And Developers | 0.7 km | 72 | Dec 2028 | 35% | 0 | Not collected |
| Sai AmoghaSri Dwaraka Builders & Developers | 0.9 km | 128 | Mar 2027 | 98% | 1 | Not collected |
| Concorde EleveConcorde Housing Corporation Pvt Ltd | 1.4 km | 142 | Dec 2030 | 16% | 0 | Not collected |
| Brigade LakecrestBrigade Enterprises Ltd | 1.5 km | 604 | Mar 2030 | 20% | 0 | from ₹1.6 Crabout ₹16,800/sq ft carpet |
| LVS GreenwoodsLVS Builders LLP | 1.6 km | 138 | Jun 2027 | 34% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 18 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/446/PR/170726/008823.
- RERA record last checked: 18 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 17 Jul 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Old Madras Road
Medahalli, Old Madras RoadUnder constructionRERA registeredBuyers’ group openAakruthi Nest
by Kriti Builders And
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 553 – 922 sq ft
- Dec 2028
72 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Aakruthi Nest
Bhattarahalli, Old Madras RoadArtist’s impressionUnder constructionRERA registeredBuyers’ group openBrigade Lakecrest
by Brigade Enterprises
Price: Price on requestGet brochure & price →
- Studio, 1 BHK, 2 BHK, 3 BHK
- 329 – 1,421 sq ft
- Mar 2030
604 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Brigade Lakecrest
Medahalli, Old Madras RoadUnder constructionRERA registeredBuyers’ group openOhana
by A One Shelters
Price: Price on requestGet brochure & price →
- 3 BHK, 4 BHK
- 1,101 – 36,597 sq ft
- Jun 2030 (extended)
2 phases on RERA · 336 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Ohana