Ohana

3 & 4 BHK apartments by A One Shelters Private Limited · Medahalli, Old Madras Road, Bengaluru

Medahalli, Old Madras Road, BengaluruOpen on Google Maps (opens in a new tab)

  • Under construction
  • RERA registered
  • residential

by A One Shelters Private Limited

Price: Price on request

Get brochure, floor plans & price

Brochure, floor plans and price list for Ohana

Builders share their brochure, floor plans and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Project summary

Ohana is a residential project by A One Shelters Private Limited in Medahalli, Bengaluru with 336 homes, registered with Karnataka RERA. The completion date on RERA is 20 Dec 2023. It is registered in 2 phases.

Facts collected on 20 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.

Ohana buyers’ group: join to ask for a group price

No one has joined yet. Be one of the first 10 buyers in this group — the founding members.

Join free. When enough buyers have joined, our agent partner asks A One Shelters Private Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.

  1. Gathering buyers
  2. Talking to the builder
  3. Group offer
  4. Group site visit
  5. Booking

0 buyers have joined · 0 committed

Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.

Join the Ohana buyers’ groupHow group buying works

See it for yourself

Visit the site with our team, or get a call to clear your questions. Free, no obligation.

Key facts: home types, towers, land and possession

Updated on 20 Oct 2026
Home types
3 BHK, 4 BHK
Carpet area
1,101 – 36,597 sq ft
Towers
2
Floors
19
Total homes
336
Land
4.1 acres
Possession (extended)
Dec 2023
Built (RERA update)
Not found in public records yet: construction progress

Ohana RERA number and registration details

RERA number
PRM/KA/RERA/1251/446/PR/171031/000634
Registered on
31 Oct 2017
Promised completion
30 Jun 2030
Extended to
20 Dec 2023
RERA status
New launch
Homes booked
Not found in public records yet: homes booked
Price
Not found in public records yet: price
Project type
Residential

2 RERA registrations (one per phase) are shown together on this page; dates above are the latest across phases.

Phases and RERA numbers

PhaseRERA numberPromised completionHomesStatusSource
Main registrationPRM/KA/RERA/1251/446/PR/171031/00063420 Mar 2023Extended to 20 Dec 2023285CompletedSource (rera.karnataka.gov.in) (opens in a new tab)
Block EPRM/KA/RERA/1251/446/PR/200825/00800930 Jun 203051New launchSource (rera.karnataka.gov.in) (opens in a new tab)

Towers and blocks (RERA filing)

TowerPhaseFloorsBasementsHomes
OHANAMain registration191285
OHANA BlockBlock E19151

A dash (—) means the filing did not state that value.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Summary in plain English

Ohana is a residential project by A One Shelters Private Limited in Medahalli, Bengaluru East, with 336 homes across 2 registrations. The main registration of 285 homes has an occupancy certificate uploaded and applied for completion on 14 February 2025. Block E, a new launch of 51 homes, is scheduled for completion on 30 June 2030.

Written by AI from the RERA record above on 20 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.

Open space, home loans, escrow and other details

Open space
Not found in public records yet: open space
Water and power
Water source filed with RERA: BWSSB,Others
Home loans: approved banks
Not found in public records yet: bank approvals
Payment plans
Not found in public records yet: payment plans
Maintenance
Not found in public records yet: maintenance
Car parking
Not found in public records yet: car parking charge
Escrow bank (RERA) · Main registration
Industrial Development Bank of India, BANASHANKARI
Escrow bank (RERA) · Block E
ICICI Bank, Cunningham Road, Bangalore

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Amenities

  • Electricity
  • CCTV Surveillance
  • Club House
  • Community Hall
  • Outdoor Sports facility
  • Indoor Sports facility
  • Swimming Pool
  • Gym
  • Parks
  • Power Backup
  • Water and Sanitation

Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Ohana location and address

Address
KHATA NO-857 MEDAHALLI VILLAGE SURVEY NO-18/1 BATTARAHALLI VILLAGE , BIDARAHALLI HOBLI BANGALORE
Village (RERA)
Medahalli
Locality
Old Madras RoadAlso known as OMR, Old Madras Road
PIN code
560049
City
Bengaluru
State
Karnataka
Coordinates
13.02271, 77.71478

Distances to landmarks

Not found in public records yet: landmarks

About Old Madras Road

Not found in public records yet: locality facts

Commute times to tech parks and the airport

As on 5 Oct 2026
ToStraight linePeak-hour drive (estimate)
ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab)4.63 kmapprox. 19 min
Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab)10.66 kmapprox. 43 min
Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab)11.59 kmapprox. 47 min
KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab)16.49 kmapprox. 67 min
Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab)19.83 kmapprox. 80 min
Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab)19.98 kmapprox. 81 min
How we calculate

Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.

Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.

Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this

Schools and hospitals nearby

As on 5 Oct 2026

Within 2 km

  • 31Schools and colleges17 schools, 13 colleges, 1 kindergartens
  • 11Hospitals and clinics5 hospitals, 6 clinics

Nearest schools and colleges

  • SJES College · 0.26 km
  • Blossom International School · 0.31 km
  • Princeton Public School · 0.56 km

Nearest hospitals and clinics

  • Sathya Sai Lake Side Ortho Hospital · 0.25 km
  • Seegehalli Government Hospital · 0.74 km
  • Swiss Medic Health Care · 1.37 km

Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Nearest metro station and railway

As on 5 Oct 2026
  • Garudacharpalya (ಗರುಡಾಚಾರ್ ಪಾಳ್ಯ)Open now — nearest operating metro station3.47 km
  • Hoodi Nearest railway station3.02 km

Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Lake and lake-buffer check

As on 5 Oct 2026

The nearest mapped lake is Seegehalli Lake, 266 m from the project’s RERA map point.

The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.

The buffer rule

Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.

Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this

Satellite time-lapse of the site

Satellite photos load when you scroll to them.

Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.

Sources:Source (livingatlas.arcgis.com) (opens in a new tab)

Ohana floor plans, brochure and elevations

Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.

Floor plans3 pages

Approved building plan15 pages

Home typeCarpet areaHomes
3 BHK1,101 – 1,144 sq ft33
4 BHK1,277 sq ft16
4 BHK (penthouse)2,029 sq ft2
Na9,369 – 36,597 sq ft285
Penthouse (duplex)1,957 – 2,098 sq ft2

Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).

We have not collected floor-plan drawings; the builder’s sales team can share them.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Ohana possession date and construction status

  • Block E10%

    as on · 0 of 51 homes booked

Timeline

  1. 20 Sep 2016Main registration: Project start date given to RERA
  2. 31 Oct 2017Main registration: Registered with Karnataka RERA
  3. 20 Mar 2023Main registration: Completion date given at registration
  4. 20 Dec 2023Main registration: Covid Extension: completion date moved to this date
  5. 14 Feb 2025Main registration: Promoter applied to RERA for completion
  6. 1 Jul 2025Block E: Project start date given to RERA
  7. 20 Aug 2025Block E: Registered with Karnataka RERA
  8. 30 Jun 2030Block E: Completion date given at registration

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Construction pace from RERA quarterly filings (Block E)

As on 12 Oct 2026

At the average pace so far, construction would reach 100% around Dec 2037 — about 90 months after the completion date on RERA (30 Jun 2030).

This project has 2 RERA registrations; the chart uses Block E, the one with the most quarterly filings.

0%25%50%75%100%2026202820302032203420362038RERA date8%9%9%10%
  • Filed on RERA
  • Average pace since start
  • RERA completion date

Quarterly filings

QuarterFiled onBuiltHomes booked
Q2 2026-27to 30 Sep 202612 Oct 202610%0 of 51
Q1 2026-27to 30 Jun 202613 Jul 20269%0 of 51
Q4 2025-26to 31 Mar 20264 Apr 20269%0 of 51
Q3 2025-26to 31 Dec 202512 Jan 20268%0 of 51
How we calculate

Average pace = % built ÷ months since the start date in the RERA record. Here: 10% ÷ 15 months (1 Jul 2025 to 30 Sep 2026) = 0.7% a month.

Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 90 ÷ 0.7 = 134.8 months → Dec 2037. This is an estimate, not a date from the builder or RERA.

Pace between filings = (10% − 8%) ÷ 9 months = 0.2% a month.

A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

Approvals and documents checklist

11 rows: approvals. Scroll inside the table to see them all.

ApprovalAuthoritySource
Building plan (Main registration)BBMP - Bruhat Bengaluru Mahanagara PalikeSource (rera.karnataka.gov.in) (opens in a new tab)
Building plan (Block E)BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Addl.Dir/JDNORTH/0085/21-22 · dated 2022-03-28Source (rera.karnataka.gov.in) (opens in a new tab)
Land conversion (2 orders) (Block E)District Commissioner Bangalore · No. ALN(Poo)(B)SR67/2007-08 and 1 more · dated 2008-11-12Source (rera.karnataka.gov.in) (opens in a new tab)
Commencement Certificate (Block E)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Building Plan (Block E)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
ESCOM/Electricity (Block E)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KWSSB/Water (Block E)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KSPCB (Block E)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
SEIAA (Block E)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Fire Force Department (Block E)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Airport Authority of India (Block E)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)

Documents uploaded to RERA (Block E)

As on 20 Oct 2026
  • Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Addl.Dir/JDNORTH/0085/21-22 · dated 28 Mar 2022
  • Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion

From the documents the promoter uploaded to Karnataka RERA, collected 20 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). Each phase is registered separately; this list is for the phase named above. The project page on RERA lists each upload.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Ohana RERA complaints

No complaints listed on Karnataka RERA for these registrations as on Source (rera.karnataka.gov.in) (opens in a new tab)

Court and consumer cases

Not found in public records yet: court cases

We list case numbers, courts and outcomes only — never names of private individuals.

About A One Shelters Private Limited

Promoter type
Company
Projects on this site
1
RERA complaints against promoter
0
Company number (CIN)
U70101KA2007PTC044172

From Karnataka RERA, as collected so far (20 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.

A One Shelters Private Limited’s RERA record

A One Shelters Private Limited delivery record

As on 20 Oct 2026
  • 1Projects in Bengaluru on RERA2 approved registrations under A One Shelters Private Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
  • 336Homes registeredAs stated in each registrations.
  • 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
  • 0Complaints per 1,000 homes0 complaints ÷ 336 homes in its 2 registrations on Karnataka RERA in Bengaluru.
  • 1Completion filed on RERARegistrations where the promoter applied to RERA for completion; 1 with an occupancy certificate on RERA.
  • 0 of 1Filed by the date given at registrationMedian gap 22.9 months (on-time ones count as 0). The completion application can come after handover, so this is an upper bound on lateness.

Completion filed on RERA

ProjectDate at registrationCompletion filedGap
OhanaOC on RERA20 Mar 2023extended to 20 Dec 202314 Feb 202523 months after

Measured against the completion date given at registration; many projects had RERA extensions (including the COVID-period extension), shown under the date.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

What’s changed since Sep 2016

As on 20 Oct 2026
  1. 12 Oct 2026Block E: Quarterly update filed for Q2 2026-27: 10% built, 0 of 51 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  2. 13 Jul 2026Block E: Quarterly update filed for Q1 2026-27: 9% built, 0 of 51 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  3. 4 Apr 2026Block E: Quarterly update filed for Q4 2025-26: 9% built, 0 of 51 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  4. 12 Jan 2026Block E: Quarterly update filed for Q3 2025-26: 8% built, 0 of 51 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  5. 20 Aug 2025Block E: Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/200825/008009); completion date 30 Jun 2030 Source (rera.karnataka.gov.in) (opens in a new tab)
  6. 1 Jul 2025Block E: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
  7. 14 Feb 2025Main registration: Promoter applied to RERA for completion (occupancy certificate on RERA) Source (rera.karnataka.gov.in) (opens in a new tab)
  8. 20 Dec 2023Main registration: Completion date extended to 20 Dec 2023 Source (rera.karnataka.gov.in) (opens in a new tab)
  9. 28 Mar 2022Block E: Building plan approved by BBMP - Bruhat Bengaluru Mahanagara Palike (No. BBMP/Addl.Dir/JDNORTH/0085/21-22) Source (rera.karnataka.gov.in) (opens in a new tab)
  10. 31 Oct 2017Main registration: Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/171031/000634); completion date 20 Mar 2023 Source (rera.karnataka.gov.in) (opens in a new tab)
  11. 20 Sep 2016Main registration: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)

Newest first. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.

Home loan EMI calculator

No listed price found — enter one to try.

Example only — use your bank’s quote.

Monthly EMI
—
Down payment
—
Loan amount
—
Total interest
—

A calculation only, from the numbers you enter — not a loan offer.

All-in cost: GST, registration and other charges

The calculator loads when you scroll to it.

Assumptions
  • Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
  • GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
  • Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
  • Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
  • Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.

How we calculate this

Ohana FAQs

What is the completion date for Ohana?

The main registration is scheduled for completion on 14 February 2025, with an occupancy certificate already uploaded. Block E is scheduled for completion on 30 June 2030.

How many homes are in Ohana?

Ohana has 336 homes total: 285 homes in the main registration and 51 homes in Block E.

What home types are available in Ohana?

The main registration has homes with carpet area from 9,369 to 36,597 sq ft. Block E offers 3 BHK (1,101 to 1,144 sq ft), 4 BHK (1,277 sq ft), 4 BHK Penthouse (2,029 sq ft), and Penthouse Duplex (1,957 to 2,098 sq ft) units.

What is the construction status of Ohana Block E?

As of 30 September 2026, Block E is 10% complete with 0 homes booked out of 51 available.

Are there any RERA complaints on Ohana?

There are no RERA complaints on this project.

What are the RERA registration numbers for Ohana?

The main registration number is PRM/KA/RERA/1251/446/PR/171031/000634 (registered 31 October 2017) and Block E is PRM/KA/RERA/1251/446/PR/200825/008009 (registered 20 August 2025).

Where is Ohana located?

Ohana is in Medahalli, Bengaluru East taluk, Bengaluru Urban district.

Who is the builder of Ohana?

A One Shelters Private Limited is the builder.

What is the project status on RERA?

The main registration is listed as Ongoing, and Block E is listed as New Project Launch.

Are there any RERA complaints against the builder?

There are no RERA complaints against A One Shelters Private Limited across all projects on record.

Written by AI from the RERA record above on 20 Oct 2026. Answers use only that record; check them against the source before you decide.

Questions about Ohana

No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.

Bought a home from A One Shelters Private Limited? Review the builder.

Reviews of A One Shelters Private Limited by verified buyers

No verified reviews of A One Shelters Private Limited yet. If you bought a home from them, your review helps other buyers.

How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.

Similar projects within 5 km

ProjectDistanceHomesPossession (RERA)BuiltComplaintsPrice
Brigade LakecrestBrigade Enterprises Ltd0.2 km604Mar 203020%0from ₹1.6 Crabout ₹16,800/sq ft carpet
Pride EuphoraPride Housing0.4 km212Sep 202765%0Not collected
Galaxy OneGalaxy Developers0.6 km212Dec 2025—0Not collected
Sree Adithya Lotus ParkSree Adithya Developers0.7 km141Sep 202698%0Not collected
Krishna LakefrontSree Krishna Constructions0.9 km73Dec 2026100%0Not collected
Aakruthi NestKriti Builders And Developers1 km72Dec 202835%0Not collected

Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sources and last checked dates

  1. Karnataka RERA — project register (search by the registration number) (opens in a new tab)

Collected on 20 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.

How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration numbers: PRM/KA/RERA/1251/446/PR/171031/000634, PRM/KA/RERA/1251/446/PR/200825/008009.

  • RERA record last checked: 20 Oct 2026
  • Last change in the record (registration, quarterly filing or complaint): 20 Oct 2026

How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error

More new projects in Old Madras Road

  • Seegehalli, Old Madras Road© Esri, Maxar, Earthstar GeographicsUnder constructionRERA registeredBuyers’ group open

    Galaxy One

    by Galaxy

    Price: Price on requestGet brochure & price →

    • 1 BHK, 2 BHK, 3 BHK
    • 330 – 1,075 sq ft
    • Dec 2025

    RERA not updated since promised Dec 2025 · 2 phases on RERA · 212 homes

    Be one of the first 10 buyers in this groupFounding members — it’s free

    Join group for Galaxy One