Mahendra Solterra Aarya Phase-2
3 BHK apartments by Mahendra Homes Private Limited · Andhapura, Bommasandra, Bengaluru
Andhapura, Bommasandra, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
by Mahendra Homes Private Limited
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Mahendra Solterra Aarya Phase-2 at a glance
- Possession (RERA)Dec 2030Karnataka RERA
- Construction11% built · on pace for Jun 2032 18 mo after RERA dateRERA filing to 30 Sep 2026; estimate from average pace
- Homes booked0 of 522 (0%)RERA update · as on 30 Sep 2026
- RERA complaints (project)None listedKarnataka RERA · as on 19 Oct 2026
- Approvals filed8 of 9 on RERAKarnataka RERA uploads · 19 Oct 2026
- Nearest metroDelta Electronics Bommasandra · 1.85 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 169 min at peak41.61 km straight line · estimate
- Nearest lakeAndapura Lake · 521 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Mahendra Solterra Aarya Phase-2 is a residential project by Mahendra Homes Private Limited in Andhapura, Bengaluru with 522 homes, registered with Karnataka RERA. The completion date on RERA is 31 Dec 2030.
Facts collected on 19 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Mahendra Solterra Aarya Phase-2 buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Mahendra Homes Private Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Mahendra Solterra Aarya Phase-2 buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 3 BHK
- Carpet area
- 867 – 1,289 sq ft
- Towers
- 3
- Floors
- 14
- Total homes
- 522
- Land
- 8.35 acres
- Possession (RERA)
- Dec 2030
- Built (RERA update)
- 11%
Mahendra Solterra Aarya Phase-2 RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/310/PR/281125/008282
- Registered on
- 28 Nov 2025
- Promised completion
- 31 Dec 2030
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- 0 of 522 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| E | 14 | 1 | 202 |
| F | 14 | 1 | 86 |
| G | 14 | 1 | 234 |
A dash (—) means the filing did not state that value.
Summary in plain English
Mahendra Solterra Aarya Phase-2 is a residential project by Mahendra Homes Private Limited in Andhapura, Bengaluru South. The project has 522 homes across 3 towers with up to 14 floors. Completion is scheduled for 31 December 2030.
Written by AI from the RERA record above on 19 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 84.8% of land
- Water and power
- Water source filed with RERA: BoreWell,Local Authority,Others
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- Karnataka Bank Ltd., Corporate Finance Branch, Bengaluru
- Building plan (RERA)
- BMRDA - Bangalore Metropolitan Region Development Authority · No. 182/2025-26 · dated 16 Aug 2025
- Project cost declared to RERA
- ₹330 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- CCTV Surveillance
- Club House
- Community Hall
- Outdoor Sports facility
- Indoor Sports facility
- Swimming Pool
- Gym
- Parks
- Power Backup
- Piped Gas
- Water and Sanitation
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Mahendra Solterra Aarya Phase-2 location and address
- Address
- Mahendra Aarya Property bearing Municipal No. 3111/6/1 8/4 9/2 10/1 12/1 13 7/2 7/3 8/2 8/3 8/5 11/2 11/3 14/1 34/3, , Heelalige Main road, Andhapura Village, Attibele Hobli, Anekal Taluck, , Bengaluru South , Bengaluru Urban, Karnataka - 560099
- Village (RERA)
- Andhapura
- Locality
- Bommasandra
- PIN code
- 560099
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.82654, 77.70376
Distances to landmarks
Not found in public records yet: landmarksAbout Bommasandra
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 4.93 km | approx. 20 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 11.08 km | approx. 45 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 18.29 km | approx. 74 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 22.27 km | approx. 90 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 26.26 km | approx. 106 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 41.61 km | approx. 169 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 14Schools and colleges12 schools, 2 colleges, 0 kindergartens
- 4Hospitals and clinics2 hospitals, 2 clinics
Nearest schools and colleges
- IGNOU Regional Centre · 1.22 km
- Brookfield High School · 1.37 km
- Ebenezer International School Bangalore · 1.5 km
Nearest hospitals and clinics
- Yashaayu Multi Speciality Ayurveda and Panchakarma Centre · 1.31 km
- JJ Hospitals · 1.31 km
- JJ Hospital · 1.42 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Delta Electronics Bommasandra (ಡೆಲ್ಟಾ ಎಲೆಕ್ಟ್ರಾನಿಕ್ಸ್ ಬೊಮ್ಮಸಂದ್ರ)Open now — nearest operating metro station1.85 km
- Heelalige (ಹೀಲಲಿಗೆ ರೈಲು ನಿಲ್ದಾಣ)Nearest railway station1.67 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Andapura Lake, 521 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Andapura Lake on OpenStreetMap (opens in a new tab) 521 m
- Kammasandra Lake on OpenStreetMap (opens in a new tab) (ಕಮ್ಮಸಂದ್ರ ಕೆರೆ)586 m
- Heelalige Lake on OpenStreetMap (opens in a new tab) 851 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Mahendra Solterra Aarya Phase-2 floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Brochure2 files

BrochureFull PDF on RERA 







Brochure Aarya Phase 2Filed 19 Nov 2025 · Full PDF on RERA 






Floor plans5 files

17 Typical Floor Plan - 2nd to 14th FloorFiled 19 Nov 2025 · Full PDF on RERA 
17 First Floor PlanFiled 19 Nov 2025 · Full PDF on RERA 
17 Ground Floor PlanFiled 19 Nov 2025 · Full PDF on RERA 
17 Basement Floor PlanFiled 19 Nov 2025 · Full PDF on RERA 
17 Terrace Floor PlanFiled 19 Nov 2025 · Full PDF on RERA
Approved building plan

Approved Building PlanFull PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 3 BHK | 867 – 1,289 sq ft | 522 |
| Apartment (3 BHK) | 1,067 sq ft | 522 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Mahendra Solterra Aarya Phase-2 possession date and construction status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
By tower (Q2 2026-27)
Units sold and unsold, from RERA (Q2 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 3 BHK | 522 | 0 | 522 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 28 Nov 2025Registered with Karnataka RERA
- 15 Jan 2026Project start date given to RERA
- 31 Dec 2030Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Jun 2032 — about 18 months after the completion date on RERA (31 Dec 2030).
- Filed on RERA
- Average pace since start
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 15 Oct 2026 | 11% | 0 of 522 |
| Q1 2026-27to 30 Jun 2026 | 15 Jul 2026 | 9% | 0 of 522 |
| Q4 2025-26to 31 Mar 2026 | 15 Apr 2026 | 8% | 0 of 522 |
| Q3 2025-26to 31 Dec 2025 | 31 Mar 2026 | 7% | 0 of 522 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 11% ÷ 8.5 months (15 Jan 2026 to 30 Sep 2026) = 1.3% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 89 ÷ 1.3 = 68.6 months → Jun 2032. This is an estimate, not a date from the builder or RERA.
Pace between filings = (11% − 7%) ÷ 9 months = 0.4% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Building plan | BMRDA - Bangalore Metropolitan Region Development Authority · No. 182/2025-26 · dated 2025-08-16 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (9 orders) | Deputy Commissioner, Bangalore Urban District, Bangalore · No. 412859 and 8 more · dated 2024-08-03 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BMRDA - Bangalore Metropolitan Region Development Authority · No. 182/2025-26 · dated 16 Aug 2025
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 19 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Mahendra Solterra Aarya Phase-2 RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Mahendra Homes Private Limited
- Promoter type
- Company
- Projects on this site
- 3
- RERA complaints against promoter
- 10
- Company number (CIN)
- U70102KA2011PTC060295
From Karnataka RERA, as collected so far (19 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Mahendra Homes Private Limited’s RERA recordMahendra Homes Private Limited delivery record
- 3Projects in Bengaluru on RERA3 approved registrations under Mahendra Homes Private Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 1,979Homes registeredAs stated in each registrations.
- 10RERA complaints0 open, 10 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 5.1Complaints per 1,000 homes10 complaints ÷ 1,979 homes in its 3 registrations on Karnataka RERA in Bengaluru.
- 1Completion filed on RERARegistrations where the promoter applied to RERA for completion; 1 with an occupancy certificate on RERA.
- 0 of 1Filed by the date given at registrationMedian gap 2.4 months (on-time ones count as 0). The completion application can come after handover, so this is an upper bound on lateness.
What the complaints are about
10 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Completion filed on RERA
| Project | Date at registration | Completion filed | Gap |
|---|---|---|---|
| Mahendra AaryaOC on RERA | 31 Dec 2025 | 13 Mar 2026 | 2 months after |
Measured against the completion date given at registration; many projects had RERA extensions (including the COVID-period extension), shown under the date.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Aug 2025
- 15 Oct 2026Quarterly update filed for Q2 2026-27: 11% built, 0 of 522 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Quarterly update filed for Q1 2026-27: 9% built, 0 of 522 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Quarterly update filed for Q4 2025-26: 8% built, 0 of 522 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 31 Mar 2026Quarterly update filed for Q3 2025-26: 7% built, 0 of 522 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jan 2026Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 28 Nov 2025Registered with Karnataka RERA (PRM/KA/RERA/1251/310/PR/281125/008282); completion date 31 Dec 2030 Source (rera.karnataka.gov.in) (opens in a new tab)
- 16 Aug 2025Building plan approved by BMRDA - Bangalore Metropolitan Region Development Authority (No. 182/2025-26) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Mahendra Solterra Aarya Phase-2 FAQs
What is the completion date for Mahendra Solterra Aarya Phase-2?
The project completion date on RERA is 31 December 2030.
How many homes are in Mahendra Solterra Aarya Phase-2?
The project has 522 homes.
What home types are available in Mahendra Solterra Aarya Phase-2?
The project has 3 BHK apartments with carpet areas ranging from 867 to 1,289 sq ft.
What is the RERA registration number for Mahendra Solterra Aarya Phase-2?
The RERA registration number is PRM/KA/RERA/1251/310/PR/281125/008282, registered on 28 November 2025.
Where is Mahendra Solterra Aarya Phase-2 located?
The project is in Andhapura, Bengaluru South taluk, Bengaluru Urban district, PIN code 560099.
What is the construction progress of Mahendra Solterra Aarya Phase-2?
As of Q2 2026-27 (ended 30 September 2026), construction is 11% complete.
How many homes have been booked in Mahendra Solterra Aarya Phase-2?
As of Q2 2026-27, no homes have been booked; all 522 homes are available in the booking table.
Are there any RERA complaints on Mahendra Solterra Aarya Phase-2?
There are no RERA complaints on this project.
What is the builder's track record?
Mahendra Homes Private Limited has 5 projects in the Bengaluru RERA record and 10 RERA complaints across all their projects.
What bank holds the escrow account for Mahendra Solterra Aarya Phase-2?
The escrow bank is Karnataka Bank Ltd.
Written by AI from the RERA record above on 19 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Mahendra Solterra Aarya Phase-2
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Mahendra Homes Private Limited? Review the builder.
Reviews of Mahendra Homes Private Limited by verified buyers
No verified reviews of Mahendra Homes Private Limited yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Mahendra AaryaMahendra Homes Pvt Ltd | 0.1 km | 662 | Dec 2025 | 100% | 3 | Not collected |
| Navakruthi Garden BayV Rajagopal Reddy | 0.5 km | 96 | Dec 2028 | 75% | 0 | Not collected |
| SDMV EliteM/s SDMV INFRA | 1 km | 168 | Dec 2026 | 100% | 0 | Not collected |
| Sowmya SkylaSowmya Infra Projects | 1.1 km | 68 | Dec 2026 | 91% | 0 | Not collected |
| VaradSatyam Builders & Developers | 1.2 km | 91 | Dec 2027 | 83% | 0 | Not collected |
| Shriram SapphireShriram Properties Limited | 1.2 km | 414 | Nov 2028 | 61% | 3 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 19 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/310/PR/281125/008282.
- RERA record last checked: 19 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 19 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Bommasandra
Andapura, BommasandraReady to moveRERA registeredBuyers’ group openMahendra Aarya
by Mahendra Homes
Price: Price on requestGet brochure & price →
- 2 BHK, 2.5 BHK, 3 BHK
- 704 – 1,025 sq ft
- Dec 2025
662 homes · 3 RERA complaints
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Mahendra Aarya
Andapura, BommasandraUnder constructionRERA registeredBuyers’ group openNavakruthi Garden Bay
by V Rajagopal Reddy
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 712 – 1,079 sq ft
- Dec 2028
96 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Navakruthi Garden Bay
BommasandraUnder constructionRERA registeredBuyers’ group openShriram Sapphire
by Shriram Properties
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 635 – 857 sq ft
- Nov 2028
414 homes · 3 RERA complaints
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Shriram Sapphire