Skip to content
Log in

Maitree Vajra

2 & 3 BHK apartments by Maitree Developers · Halanayakanahalli, Sarjapur Road, Bengaluru

Halanayakanahalli, Sarjapur Road, BengaluruOpen on Google Maps (opens in a new tab)

  • Under construction
  • RERA registered
  • residential

by Maitree Developers

Price: Price on request

Get brochure, floor plans & price

Brochure, floor plans and price list for Maitree Vajra

Builders share their brochure, floor plans and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Project summary

Maitree Vajra is a residential project by Maitree Developers in Halanayakanahalli, Bengaluru with 50 homes, registered with Karnataka RERA. The completion date on RERA is 31 Mar 2028.

Facts collected on 19 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.

Maitree Vajra buyers’ group: join to ask for a group price

No one has joined yet. Be one of the first 10 buyers in this group — the founding members.

Join free. When enough buyers have joined, our agent partner asks Maitree Developers for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.

  1. Gathering buyers
  2. Talking to the builder
  3. Group offer
  4. Group site visit
  5. Booking

0 buyers have joined · 0 committed

Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.

Join the Maitree Vajra buyers’ groupHow group buying works

See it for yourself

Visit the site with our team, or get a call to clear your questions. Free, no obligation.

Key facts: home types, towers, land and possession

Updated on 19 Oct 2026
Home types
2 BHK, 3 BHK
Carpet area
541 – 1,376 sq ft
Towers
1
Floors
5
Total homes
50
Land
0.73 acres
Possession (RERA)
Mar 2028
Built (RERA update)
24%

Maitree Vajra RERA number and registration details

RERA number
PRM/KA/RERA/1251/446/PR/110526/008641
Registered on
11 May 2026
Promised completion
31 Mar 2028
Extended to
No extension recorded
RERA status
New launch
Homes booked
0 of 50 as on
Price
Not found in public records yet: price
Project type
Residential

Towers and blocks (RERA filing)

TowerFloorsBasementsHomes
Maitree Vajra5150

A dash (—) means the filing did not state that value.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Summary in plain English

Maitree Vajra is a residential project by Maitree Developers with 50 homes in 1 tower of 5 floors in Halanayakanahalli, Bengaluru East. The project is registered as a new launch on RERA. The completion date on RERA is 31 March 2028.

Written by AI from the RERA record above on 19 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.

Open space, home loans, escrow and other details

Open space
63.9% of land
Water and power
Water source filed with RERA: BoreWell
Home loans: approved banks
Not found in public records yet: bank approvals
Payment plans
Not found in public records yet: payment plans
Maintenance
Not found in public records yet: maintenance
Car parking
Not found in public records yet: car parking charge
Escrow bank (RERA)
DCB Bank, Rajaji Nagar
Building plan (RERA)
BDA - Bangalore Development Authority · No. BDA/PS/EM/EO-05/TA-4/E/79/2025-26 · dated 16 Mar 2026
Project cost declared to RERA
₹39.81 Cr

Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Amenities

  • Electricity
  • CCTV Surveillance
  • Community Hall
  • Gym
  • Parks
  • Power Backup
  • Water and Sanitation

Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Maitree Vajra location and address

Address
Survey No.2/1, 2/5 , situated at Halanayakanahalli Village, Varthur Hobli , Bengaluru East , Bengaluru Urban, Karnataka - 560035
Village (RERA)
Halanayakanahalli
Locality
Sarjapur RoadAlso known as Sarjapura Road, Sarjapur Main Road, Sarjapura Main Road
PIN code
560035
City
Bengaluru
State
Karnataka
Coordinates
12.90017, 77.68939

Distances to landmarks

Not found in public records yet: landmarks

About Sarjapur Road

Not found in public records yet: locality facts

Commute times to tech parks and the airport

As on 5 Oct 2026
ToStraight linePeak-hour drive (estimate)
Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab)2.76 kmapprox. 11 min
Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab)6.21 kmapprox. 25 min
ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab)11.05 kmapprox. 45 min
KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab)15.62 kmapprox. 63 min
Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab)18.1 kmapprox. 73 min
Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab)33.46 kmapprox. 136 min
How we calculate

Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.

Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.

Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this

Schools and hospitals nearby

As on 5 Oct 2026

Within 2 km

  • 20Schools and colleges17 schools, 2 colleges, 1 kindergartens
  • 20Hospitals and clinics11 hospitals, 9 clinics

Nearest schools and colleges

  • NPS East, Sarjapur · 0.54 km
  • Lake View PU College · 0.54 km
  • Glentree Academy · 0.58 km

Nearest hospitals and clinics

  • Punarjani Ayurvedic Multispeciality Hospital · 0.73 km
  • A & J Ayur Care · 0.9 km
  • Sai Clinic · 0.96 km

Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Nearest metro station and railway

As on 5 Oct 2026
  • Prestige Bellandur (ಬೆಳ್ಳಂದೂರ್)Blue Line metro, under construction3.22 km
  • Embassy Tech Village Kadubeesanahalli (ಕಾಡುಬೀಸನಹಳ್ಳಿ)Blue Line metro, under construction3.57 km
  • Ibbaluru (ಇಬ್ಬಲೂರು)Blue Line metro, under construction3.67 km
  • Hosa Road (ಹೊಸ ರಸ್ತೆ)Open now — nearest operating metro station5.17 km
  • Carmelaram (ಕರ್ಮೇಲರಮ್)Nearest railway station1.95 km

Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Lake and lake-buffer check

As on 5 Oct 2026

The nearest mapped lake is Halanayakanahalli Lake, 40 m from the project’s RERA map point.

The site may be next to the lake. The RERA point is one approximate spot and the site boundary is not published as a shape — check the approved plan for the lake buffer.

The buffer rule

Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.

Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this

Satellite time-lapse of the site

Satellite photos load when you scroll to them.

Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.

Sources:Source (livingatlas.arcgis.com) (opens in a new tab)

Maitree Vajra home types and carpet areas

Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.

Approved building plan2 files

Approved layout plan2 files

Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.

Get brochure, floor plans & price

Brochure, floor plans and price list for Maitree Vajra

Builders share their brochure, floor plans and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Home typeCarpet areaHomes
2 BHK541 – 718 sq ft10
3 BHK1,002 – 1,376 sq ft40
Residential flats1,248 sq ft50

Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).

We have not collected floor-plan drawings; the builder’s sales team can share them.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Maitree Vajra possession date and construction status

  • Whole project (promoter’s RERA update)24%

    as on · 0 of 50 homes booked

Promoter’s quarterly update to RERA for Q1 2026-27, submitted 2026-07-15.

Units sold and unsold, from RERA (Q1 2026-27)

TypeHomesBookedAvailable
2 BHK10010
3 BHK40040

As reported by the promoter in the quarterly update to RERA, not verified by us.

Timeline

  1. 16 Mar 2026Project start date given to RERA
  2. 11 May 2026Registered with Karnataka RERA
  3. 31 Mar 2028Completion date given at registration

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Construction pace from RERA quarterly filings

As on 15 Jul 2026

At the average pace so far, construction would reach 100% around May 2027 — about 10 months before the completion date on RERA (31 Mar 2028).

0%25%50%75%100%20272028RERA date24%
  • Filed on RERA
  • Average pace since start
  • RERA completion date

Quarterly filings

QuarterFiled onBuiltHomes booked
Q1 2026-27to 30 Jun 202615 Jul 202624%0 of 50
How we calculate

Average pace = % built ÷ months since the start date in the RERA record. Here: 24% ÷ 3.5 months (16 Mar 2026 to 30 Jun 2026) = 6.9% a month.

Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Jun 2026 + 76 ÷ 6.9 = 11 months → May 2027. This is an estimate, not a date from the builder or RERA.

A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q1 2026-27, submitted 2026-07-15.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

Approvals and documents checklist

ApprovalAuthoritySource
Building planBDA - Bangalore Development Authority · No. BDA/PS/EM/EO-05/TA-4/E/79/2025-26 · dated 2026-03-16Source (rera.karnataka.gov.in) (opens in a new tab)
Land conversion (2 orders)Deputy Commissioner's Office Bangalore District · No. 36411,36412 and 1 more · dated 2025-09-10Source (rera.karnataka.gov.in) (opens in a new tab)
Approved Building Planscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
ESCOM/Electricityscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KWSSB/Waterscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KSPCBscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)

Documents uploaded to RERA

As on 19 Oct 2026
  • Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BDA - Bangalore Development Authority · No. BDA/PS/EM/EO-05/TA-4/E/79/2025-26 · dated 16 Mar 2026
  • Commencement certificate · Permission to start buildingNot on RERA yet
  • Environment clearance · SEIAA KarnatakaNot on RERA yet
  • Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
  • Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Height clearance · Airports Authority of IndiaNot on RERA yet
  • Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion

From the documents the promoter uploaded to Karnataka RERA, collected 19 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Maitree Vajra RERA complaints

No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)

Court and consumer cases

Not found in public records yet: court cases

We list case numbers, courts and outcomes only — never names of private individuals.

About Maitree Developers

Promoter type
Partnership Firm
Projects on this site
1
RERA complaints against promoter
1
Company number (CIN)
Not found in public records yet: CIN

From Karnataka RERA, as collected so far (19 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.

Maitree Developers’s RERA record

Maitree Developers delivery record

As on 19 Oct 2026

What the complaints are about

  • Other1

1 complaint subject as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

What’s changed since Mar 2026

As on 19 Oct 2026
  1. 15 Jul 2026Quarterly update filed for Q1 2026-27: 24% built, 0 of 50 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  2. 11 May 2026Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/110526/008641); completion date 31 Mar 2028 Source (rera.karnataka.gov.in) (opens in a new tab)
  3. 16 Mar 2026Building plan approved by BDA - Bangalore Development Authority (No. BDA/PS/EM/EO-05/TA-4/E/79/2025-26) Source (rera.karnataka.gov.in) (opens in a new tab)
  4. 16 Mar 2026Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)

Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.

Home loan EMI calculator

No listed price found — enter one to try.

Example only — use your bank’s quote.

Monthly EMI
—
Down payment
—
Loan amount
—
Total interest
—

A calculation only, from the numbers you enter — not a loan offer.

All-in cost: GST, registration and other charges

The calculator loads when you scroll to it.

Assumptions
  • Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
  • GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
  • Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
  • Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
  • Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.

How we calculate this

Maitree Vajra FAQs

What is the completion date for Maitree Vajra?

The completion date on RERA is 31 March 2028.

What is the RERA registration number for Maitree Vajra?

The registration number is PRM/KA/RERA/1251/446/PR/110526/008641.

What home types are available in Maitree Vajra?

The project has 3 BHK homes (40 units, carpet area 1,002 to 1,376 sq ft), 2 BHK homes (10 units, carpet area 541 to 718 sq ft), and residential flats (50 units, carpet area 1,248 sq ft).

How many homes are in Maitree Vajra?

The project has 50 homes.

Where is Maitree Vajra located?

Maitree Vajra is in Halanayakanahalli, Bengaluru East, PIN code 560035.

How many towers does Maitree Vajra have?

The project has 1 tower with a maximum of 5 floors.

Are there any RERA complaints on Maitree Vajra?

There are 0 complaints on this project as per RERA records.

What is the builder's RERA complaint history?

Maitree Developers has 1 complaint across all its projects on RERA.

How many other projects does Maitree Developers have on RERA?

Maitree Developers has 3 projects in total on the Bengaluru RERA record.

Which bank is the escrow bank for Maitree Vajra?

DCB Bank is the escrow bank for this project.

Written by AI from the RERA record above on 19 Oct 2026. Answers use only that record; check them against the source before you decide.

Questions about Maitree Vajra

No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.

Bought a home from Maitree Developers? Review the builder.

Reviews of Maitree Developers by verified buyers

No verified reviews of Maitree Developers yet. If you bought a home from them, your review helps other buyers.

How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.

Similar projects within 5 km

ProjectDistanceHomesPossession (RERA)BuiltComplaintsPrice
Mythri SignatureMythri Builders0.5 km130Jun 2026—0Not collected
Adarsh LuminaShivakar Developers Private Limited0.5 km440Mar 202810%1Not collected
Roach CicadaRBD Shelters LLP0.6 km124Aug 203021%0Not collected
Roaha VivaraLandcapital Infrastructure Private Limited0.6 km64Jun 20305%0Not collected
Mana CrestaMana Constructions0.8 km180Dec 202838%0Not collected
HM ScottsvilleHM Infratech Private Limited1 km154Jun 2027extended82%0Not collected

Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sources and last checked dates

  1. Karnataka RERA — project register (search by the registration number) (opens in a new tab)

Collected on 19 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.

How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/446/PR/110526/008641.

  • RERA record last checked: 19 Oct 2026
  • Last change in the record (registration, quarterly filing or complaint): 15 Jul 2026

How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error

More new projects in Sarjapur Road