Merusri Sunscape at a glance
- Possession (RERA)Mar 2030Karnataka RERA
- Construction16% built · on pace for Aug 2034 52 mo after RERA dateRERA filing to 30 Sep 2026; estimate from average pace
- Homes booked14 of 76 (18%)RERA update · as on 30 Sep 2026
- RERA complaints (project)None listedKarnataka RERA · as on 20 Oct 2026
- Approvals filed3 of 9 on RERAKarnataka RERA uploads · 20 Oct 2026
- Nearest metroAirport City · 4.82 km (under construction)Open now: Krishnarajapura, 25.99 km · straight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 24 min at peak5.98 km straight line · estimate
- Nearest lakeUnnamed lake · 617 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Merusri Sunscape is a residential project by Merusri Sunscape LLP in Kempalinganapura, Bengaluru with 76 homes, registered with Karnataka RERA. The completion date on RERA is 31 Mar 2030.
Facts collected on 20 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Merusri Sunscape buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Merusri Sunscape LLP for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Merusri Sunscape buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 3 BHK, 4 BHK
- Carpet area
- 1,431 – 3,237 sq ft
- Towers
- 1
- Floors
- 2
- Total homes
- 76
- Land
- 5.17 acres
- Possession (RERA)
- Mar 2030
- Built (RERA update)
- 16%
Merusri Sunscape RERA number and registration details
- RERA number
- PRM/KA/RERA/1250/303/PR/050725/007893
- Registered on
- 5 Jul 2025
- Promised completion
- 31 Mar 2030
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- 14 of 76 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| MERUSRI SUNSCAPE | 2 | 0 | 76 |
A dash (—) means the filing did not state that value.
Summary in plain English
Merusri Sunscape is a residential project by Merusri Sunscape LLP in Kempalinganapura, Devanahalli, with 76 homes in one 2-storey tower. The project is registered with Karnataka RERA and is expected to be completed on 31 March 2030.
Written by AI from the RERA record above on 20 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 62.3% of land
- Water and power
- Water source filed with RERA: Local Authority
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- HDFC, NO. 60, MEERA SADAN, 1st MAIN ROAD, SESHADRIPURAM
- Building plan (RERA)
- BIAPPA - Bangalore Airport Area Planning Authority · No. DP - BIAAPA/TP/LAO/DP/116/2023-24/24-25/1088, VP - BIAAPA/TP/CC/DP/36/2025-26/447 · dated 27 Jun 2025
- Project cost declared to RERA
- ₹80 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- CCTV Surveillance
- Club House
- Power Backup
- Water and Sanitation
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Merusri Sunscape location and address
- Address
- KHATHA NO. 285/13/1/13/2/23/1/23/3/23/4/24/1/25/3, PID NO. 150300200401020267 , SY NO.S: 13/1, 13/2 OF KEMPALINGANAPURA VILLAGE & SY NO.S: 23/1, 23/3, 23/4, 24/1, 25/3 OF UGANAVADI VILLAGE, KASABA HOBLI , Devanahalli , Bengaluru Rural, Karnataka - 562110
- Village (RERA)
- Kempalinganapura
- Locality
- Near Devanahalli
- PIN code
- 562110
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.23303, 77.66024
Distances to landmarks
Not found in public records yet: landmarksAbout Kempalinganapura
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 5.98 km | approx. 24 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 21.02 km | approx. 85 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 28.55 km | approx. 116 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 29.99 km | approx. 121 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 34.47 km | approx. 140 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 42.63 km | approx. 173 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Nearest metro station and railway
- Airport City (ವಿಮಾನ ನಿಲ್ದಾಣ ನಗರ)Blue Line metro, under construction4.82 km
- Doddajala (ದೊಡ್ಡಜಾಲ)Blue Line metro, under construction5.24 km
- KIAL Terminals (ಕೆಐಎಬಿ ವಿಮಾನ ನಿಲ್ದಾಣ ಟರ್ಮಿನಲ್ಸ್)Blue Line metro, under construction6.89 km
- Krishnarajapura (ಕೃಷ್ಣರಾಜಪುರ (ಕೆ.ಆರ್.ಪುರ))Open now — nearest operating metro station25.99 km
- Kempegowda International Airport Halt (ಕೆಂಪೇಗೌಡ ಅಂತರರಾಷ್ಟ್ರೀಯ ವಿಮಾನ-ನಿಲದಾಣ ಹಾಲ್ಟ)Nearest railway station3.03 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 617 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 617 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,595 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Merusri Sunscape home types and carpet areas
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Approved building plan4 files

Approved Building PlanFull PDF on RERA 
Approved building plan Original CopyFiled 11 Jun 2025 · Full PDF on RERA 
APPROVED PLAN 1Filed 1 Jul 2025 · Full PDF on RERA 
Approved Sanction PlanFiled 11 Jun 2025 · Full PDF on RERA
Approved layout plan

Approved Original Single Plot layout planFiled 11 Jun 2025 · Full PDF on RERA
Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.
Get brochure, floor plans & price| Home type | Carpet area | Homes |
|---|---|---|
| 3 BHK | 1,431 – 1,598 sq ft | 36 |
| 4 BHK | 2,188 – 3,237 sq ft | 40 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Merusri Sunscape possession date and construction status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
Units sold and unsold, from RERA (Q2 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 3 BHK | 36 | 10 | 26 |
| 4 BHK | 40 | 4 | 36 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 1 Apr 2025Project start date given to RERA
- 5 Jul 2025Registered with Karnataka RERA
- 31 Mar 2030Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Aug 2034 — about 52 months after the completion date on RERA (31 Mar 2030).
At the pace between the 4 quarterly filings we have (9% → 16% in 9 months), it would be around Sep 2035 — about 66 months after the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 15 Oct 2026 | 16% | 14 of 76 |
| Q1 2026-27to 30 Jun 2026 | 15 Jul 2026 | 15% | 14 of 76 |
| Q4 2025-26to 31 Mar 2026 | 9 Jun 2026 | 12% | 4 of 76 |
| Q3 2025-26to 31 Dec 2025 | 30 Mar 2026 | 9% | 3 of 76 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 16% ÷ 18 months (1 Apr 2025 to 30 Sep 2026) = 0.9% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 84 ÷ 0.9 = 94.3 months → Aug 2034. This is an estimate, not a date from the builder or RERA.
Pace between filings = (16% − 9%) ÷ 9 months = 0.8% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Building plan | BIAPPA - Bangalore Airport Area Planning Authority · No. DP - BIAAPA/TP/LAO/DP/116/2023-24/24-25/1088, VP - BIAAPA/TP/CC/DP/36/2025-26/447 · dated 2025-06-27 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (7 orders) | DC BENGALURU RURAL · No. 627837 and 6 more · dated 2024-03-11 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BIAPPA - Bangalore Airport Area Planning Authority · No. DP - BIAAPA/TP/LAO/DP/116/2023-24/24-25/1088, VP - BIAAPA/TP/CC/DP/36/2025-26/447 · dated 27 Jun 2025
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBNot on RERA yet
- Electricity · BESCOMNot on RERA yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 20 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Merusri Sunscape RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Merusri Sunscape LLP
- Promoter type
- Partnership Firm
- Projects on this site
- 1
- RERA complaints against promoter
- 0
- Company number (CIN)
- ACJ-4786
From Karnataka RERA, as collected so far (20 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Merusri Sunscape LLP’s RERA recordMerusri Sunscape LLP delivery record
- 1Projects in Bengaluru on RERA1 approved registration under Merusri Sunscape LLP in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 76Homes registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 homes0 complaints ÷ 76 homes in its 1 registration on Karnataka RERA in Bengaluru.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Apr 2025
- 15 Oct 2026Quarterly update filed for Q2 2026-27: 16% built, 14 of 76 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Quarterly update filed for Q1 2026-27: 15% built, 14 of 76 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 9 Jun 2026Quarterly update filed for Q4 2025-26: 12% built, 4 of 76 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 30 Mar 2026Quarterly update filed for Q3 2025-26: 9% built, 3 of 76 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 5 Jul 2025Registered with Karnataka RERA (PRM/KA/RERA/1250/303/PR/050725/007893); completion date 31 Mar 2030 Source (rera.karnataka.gov.in) (opens in a new tab)
- 27 Jun 2025Building plan approved by BIAPPA - Bangalore Airport Area Planning Authority (No. DP - BIAAPA/TP/LAO/DP/116/2023-24/24-25/1088, VP - BIAAPA/TP/CC/DP/36/2025-26/447) Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Apr 2025Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Merusri Sunscape FAQs
What is Merusri Sunscape?
Merusri Sunscape is a residential project by Merusri Sunscape LLP located in Kempalinganapura, Devanahalli, Bengaluru Rural district, PIN code 562110.
How many homes are in Merusri Sunscape?
The project has 76 homes in one tower with 2 floors.
What home types are available in Merusri Sunscape?
The project offers 36 homes of 3 BHK type with carpet area between 1,431 and 1,598 sq ft, and 40 homes of 4 BHK type with carpet area between 2,188 and 3,237 sq ft.
When will Merusri Sunscape be completed?
The project completion date as per RERA is 31 March 2030.
What is the RERA registration number for Merusri Sunscape?
The RERA registration number is PRM/KA/RERA/1250/303/PR/050725/007893, registered on 5 July 2025.
What is the construction progress of Merusri Sunscape?
As of Q2 2026-27 (quarter ended 30 September 2026), construction is 16% complete.
How many homes are booked in Merusri Sunscape?
As of Q2 2026-27, 14 homes have been booked out of 76 homes.
Are there any RERA complaints on Merusri Sunscape?
There are no RERA complaints filed on this project.
What is the builder's track record?
Merusri Sunscape LLP is a Partnership Firm with no RERA complaints against it across all projects, and Merusri Sunscape is the only project by this builder in the RERA records.
Which bank is handling the escrow for Merusri Sunscape?
HDFC is the escrow bank for this project.
Written by AI from the RERA record above on 20 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Merusri Sunscape
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Merusri Sunscape LLP? Review the builder.
Reviews of Merusri Sunscape LLP by verified buyers
No verified reviews of Merusri Sunscape LLP yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Provident DeansgatePuravankara Limited | 1.8 km | 288 | Mar 2028 | — | 0 | Not collected |
| Sobha OakshireSobha Limited | 1.9 km | 80 | Dec 2027 | — | 0 | from ₹5.3 Crabout ₹20,000/sq ft carpet |
| CosmosCorbital Builders | 2.2 km | 68 | Dec 2029 | — | 0 | Not collected |
| The RootsSRK Infra Projects Private Limited | 2.3 km | 100 | Jul 2030 | 24% | 0 | Not collected |
| Hydenben CliftonHydenben Developers LLP | 2.5 km | 98 | Apr 2028 | 40% | 0 | Not collected |
| Sattva Aeropolis Phase 2Sattva Resi Private Limited | 2.8 km | 554 | Oct 2028 | 39% | 1 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 20 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1250/303/PR/050725/007893.
- RERA record last checked: 20 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 20 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects nearby
Uganavadi, near DevanahalliUnder constructionRERA registeredBuyers’ group openProvident Deansgate
by Puravankara
Price: Price on requestGet brochure & price →
- 3 BHK
- 1,206 – 1,435 sq ft
- Mar 2028
2 phases on RERA · 288 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Provident Deansgate
Thimmegowdana Hosahalli, DevanahalliArtist’s impressionUnder constructionRERA registeredBuyers’ group openSobha Oakshire
by Sobha
Price: Price on requestGet brochure & price →
- 4 BHK
- 2,630 – 2,667 sq ft
- Dec 2027
3 phases on RERA · 80 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Sobha Oakshire- Kyalasanahalli, Hennur RoadUnder constructionRERA registeredBuyers’ group open
Cosmos
by Corbital Builders
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 618 – 1,026 sq ft
- Dec 2029
68 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Cosmos