Sobha Oakshire
4 BHK apartments by SOBHA · Thimmegowdana Hosahalli, Devanahalli, Bengaluru
Thimmegowdana Hosahalli, Devanahalli, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
by SOBHA
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Sobha Oakshire at a glance
- Price from₹5.3 Cr · 4 BHKBuilder’s website · as on 15 Oct 2026
- All-in from₹5.97 Cr · 4 BHKBuilder price + GST, stamp duty, registration · 15 Oct 2026
- Possession (RERA)Dec 2027Karnataka RERA
- RERA complaints (project)None listedKarnataka RERA · as on 22 Oct 2026
- Builder on-time record6 of 17 on time Mostly lateCompleted projects: OC date vs promised date
- Approvals filed7 of 9 on RERAKarnataka RERA uploads · 22 Oct 2026
- Nearest metroAirport City · 3.94 km (under construction)Open now: Krishnarajapura, 25.88 km · straight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 18 min at peak4.55 km straight line · estimate
- Nearest lakeUnnamed lake · 603 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Sobha Oakshire is a residential project by Sobha Limited in Thimmegowdana Hosahalli, Bengaluru with 80 homes, registered with Karnataka RERA. The completion date on RERA is 31 Dec 2027. It is registered in 3 phases.
Facts collected on 22 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Sobha Oakshire buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks SOBHA for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Sobha Oakshire buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 4 BHK
- Carpet area
- 2,630 – 2,667 sq ft
- Towers
- 12
- Floors
- 1
- Total homes
- 80
- Land
- 8.86 acres
- Possession (RERA)
- Dec 2027
- Built (RERA update)
- Not found in public records yet: construction progress
Sobha Oakshire RERA number and registration details
- RERA number
- PRM/KA/RERA/1250/303/PR/270323/005821
- Registered on
- 27 Mar 2023
- Promised completion
- 31 Dec 2027
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- Not found in public records yet: homes booked
- Price
- ₹5.3 Cr as on
- Project type
- Residential
3 RERA registrations (one per phase) are shown together on this page; dates above are the latest across phases.
From the builder’s own website; see the price list below for size basis.
Phases and RERA numbers
| Phase | RERA number | Promised completion | Homes | Status | Source |
|---|---|---|---|---|---|
| Phase 1 Wing 1,2,7 and 8 | PRM/KA/RERA/1250/303/PR/270323/005821 | 31 Dec 2026 | 30 | New launch | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Phase 2 Wing 3,4,9 and 10 | PRM/KA/RERA/1250/303/PR/270323/005822 | 30 Jun 2027 | 30 | New launch | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Phase 3 Wing 5,6,11 and 12 | PRM/KA/RERA/1250/303/PR/270323/005823 | 31 Dec 2027 | 20 | New launch | Source (rera.karnataka.gov.in) (opens in a new tab) |
Towers and blocks (RERA filing)
12 rows: towers. Scroll inside the table to see them all.
| Tower | Phase | Floors | Basements | Homes |
|---|---|---|---|---|
| W1 | Phase 1 Wing 1,2,7 and 8 | 1 | 0 | 6 |
| W2 | Phase 1 Wing 1,2,7 and 8 | 1 | 0 | 6 |
| W7 | Phase 1 Wing 1,2,7 and 8 | 1 | 0 | 9 |
| W8 | Phase 1 Wing 1,2,7 and 8 | 1 | 0 | 9 |
| W3 | Phase 2 Wing 3,4,9 and 10 | 1 | 0 | 6 |
| W4 | Phase 2 Wing 3,4,9 and 10 | 1 | 0 | 6 |
| W9 | Phase 2 Wing 3,4,9 and 10 | 1 | 0 | 9 |
| W10 | Phase 2 Wing 3,4,9 and 10 | 1 | 0 | 9 |
| W5 | Phase 3 Wing 5,6,11 and 12 | 1 | 0 | 6 |
| W6 | Phase 3 Wing 5,6,11 and 12 | 1 | 0 | 6 |
| W11 | Phase 3 Wing 5,6,11 and 12 | 1 | 0 | 4 |
| W12 | Phase 3 Wing 5,6,11 and 12 | 1 | 0 | 4 |
A dash (—) means the filing did not state that value.
Sobha Oakshire price list
| Home type | Size | Price | ₹ per sq ft | Source |
|---|---|---|---|---|
| 4 BHK | 3,441 – 3,467 sq ftunknown | From ₹5.3 Cronwards | — | Source (sobha.com) (opens in a new tab) |
As published by the builder on the date shown — not an offer, and not checked with the builder. Check whether the size is carpet or super built-up area before comparing.
Price per sq ft vs projects within 5 km
The builder’s published prices work out to about ₹19,900 – ₹20,200 per sq ft of carpet area.
| Home type | Builder price | Carpet area (RERA) | ₹ per sq ft carpet |
|---|---|---|---|
| 4 BHK | from ₹5.3 Crseen 15 Oct 2026 | 2,630 – 2,667 sq ft | ₹19,900 – ₹20,200 |
Worked out as the builder’s “from” price ÷ the largest and smallest carpet area RERA lists for that home type — we don’t know which unit the starting price is for. Builders usually say taxes and other charges are extra. Builder price list (sobha.com) (opens in a new tab) RERA carpet areas (rera.karnataka.gov.in) (opens in a new tab)
Sources:Source (sobha.com) (opens in a new tab)Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Price history
One snapshot so far: the builder’s “onwards” prices seen on 15 Oct 2026. Each new check of the builder’s website adds a dated point here, so rises and offers show up with their dates.
| Seen on | Where | Prices |
|---|---|---|
| 15 Oct 2026 | Builder’s website Source (sobha.com) (opens in a new tab) | 4 BHK from ₹5.3 Cr |
Summary in plain English
Sobha Oakshire is a residential project by Sobha Limited in Thimmegowdana Hosahalli, Devanahalli, with 80 homes across three phases. Phase 1 has 30 homes completing by 31 December 2026, Phase 2 has 30 homes by 30 June 2027, and Phase 3 has 20 homes by 31 December 2027. All homes are 4 BHK with carpet area from 2,630 to 2,667 sq ft.
Written by AI from the RERA record above on 22 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- Not found in public records yet: open space
- Water and power
- Water source filed with RERA: Local Authority
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA) · Phase 1 Wing 1,2,7 and 8
- Axis Bank, M G Road
- Escrow bank (RERA) · Phase 2 Wing 3,4,9 and 10
- Axis Bank, M G Road
- Escrow bank (RERA) · Phase 3 Wing 5,6,11 and 12
- Axis Bank, M G Road
Amenities
- Electricity
- CCTV Surveillance
- Club House
- Outdoor Sports facility
- Indoor Sports facility
- Swimming Pool
- Gym
- Parks
- Power Backup
- Piped Gas
- Water and Sanitation
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Sobha Oakshire location and address
- Address
- Proposed residential building plan, Katha no. 80/73/3/74/2/75 (PID NO 150300200400520002) , Sy nos 73/3, 74/2, 75 of Thimmegowdana Hosahalli village, Kasaba hobli, , Devanahalli , Bengaluru Rural, Karnataka - 562110
- Village (RERA)
- Thimmegowdana Hosahalli
- Locality
- Devanahalli
- PIN code
- 562110
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.23268, 77.67812
Distances to landmarks
Not found in public records yet: landmarksAbout Devanahalli
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 4.55 km | approx. 18 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 21.47 km | approx. 87 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 28 km | approx. 113 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 30.65 km | approx. 124 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 34.36 km | approx. 139 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 42.61 km | approx. 173 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Nearest metro station and railway
- Airport City (ವಿಮಾನ ನಿಲ್ದಾಣ ನಗರ)Blue Line metro, under construction3.94 km
- KIAL Terminals (ಕೆಐಎಬಿ ವಿಮಾನ ನಿಲ್ದಾಣ ಟರ್ಮಿನಲ್ಸ್)Blue Line metro, under construction5.38 km
- Doddajala (ದೊಡ್ಡಜಾಲ)Blue Line metro, under construction6.12 km
- Krishnarajapura (ಕೃಷ್ಣರಾಜಪುರ (ಕೆ.ಆರ್.ಪುರ))Open now — nearest operating metro station25.88 km
- Kempegowda International Airport Halt (ಕೆಂಪೇಗೌಡ ಅಂತರರಾಷ್ಟ್ರೀಯ ವಿಮಾನ-ನಿಲದಾಣ ಹಾಲ್ಟ)Nearest railway station2.46 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 603 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 603 m
- Doddasanne Tank on OpenStreetMap (opens in a new tab) (ದೊಡ್ಡಸಣ್ಣೆ ಕೆರೆ)1,389 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,596 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Sobha Oakshire floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Brochure3 files

Phase 1 Wing 1,2,7 and 8: BrochureFull PDF on RERA 



Phase 3 Wing 5,6,11 and 12: BrochureFull PDF on RERA 



Phase 2 Wing 3,4,9 and 10: BrochureFull PDF on RERA 


Approved building plan3 files

Phase 2 Wing 3,4,9 and 10: Approved Building/Plotting PlanFull PDF on RERA 
Phase 1 Wing 1,2,7 and 8: Approved Building/Plotting PlanFull PDF on RERA 
Phase 3 Wing 5,6,11 and 12: Approved Building/Plotting PlanFull PDF on RERA
Approved layout plan9 files

Phase 2 Wing 3,4,9 and 10: Approved Layout PlanFull PDF on RERA 
Phase 1 Wing 1,2,7 and 8: Approved Layout PlanFull PDF on RERA 
Phase 3 Wing 5,6,11 and 12: Approved Layout PlanFull PDF on RERA 
Phase 3 Wing 5,6,11 and 12: Existing Layout PlanFull PDF on RERA 
Phase 1 Wing 1,2,7 and 8: Existing Layout PlanFull PDF on RERA 
Phase 2 Wing 3,4,9 and 10: Existing Layout PlanFull PDF on RERA 
Phase 1 Wing 1,2,7 and 8: Area Development Plan Of Project AreaFull PDF on RERA 
Phase 2 Wing 3,4,9 and 10: Area Development Plan Of Project AreaFull PDF on RERA 
Phase 3 Wing 5,6,11 and 12: Area Development Plan Of Project AreaFull PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 4 BHK | 2,630 – 2,667 sq ft | 80 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Sobha Oakshire possession date and construction status
Timeline
- 27 Mar 2023Phase 1 Wing 1,2,7 and 8: Registered with Karnataka RERA
- 27 Mar 2023Phase 2 Wing 3,4,9 and 10: Registered with Karnataka RERA
- 27 Mar 2023Phase 3 Wing 5,6,11 and 12: Registered with Karnataka RERA
- 1 Oct 2023Phase 1 Wing 1,2,7 and 8: Project start date given to RERA
- 1 Oct 2023Phase 2 Wing 3,4,9 and 10: Project start date given to RERA
- 1 Oct 2023Phase 3 Wing 5,6,11 and 12: Project start date given to RERA
- 31 Dec 2026Phase 1 Wing 1,2,7 and 8: Completion date given at registration
- 30 Jun 2027Phase 2 Wing 3,4,9 and 10: Completion date given at registration
- 31 Dec 2027Phase 3 Wing 5,6,11 and 12: Completion date given at registration
Approvals and documents checklist
48 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Building plan (Phase 1 Wing 1,2,7 and 8) | BIAPPA - Bangalore Airport Area Planning Authority · No. LP# BIAPPA/TP/CC/226/2022-23/2658 · dated 2023-02-16 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (Phase 1 Wing 1,2,7 and 8) | Deputy Commissioner, Bangalore Rural District · No. ALN(DEV)SR:23/2012-13 · dated 2012-10-17 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate (Phase 1 Wing 1,2,7 and 8) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter (Phase 1 Wing 1,2,7 and 8) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter (Phase 1 Wing 1,2,7 and 8) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan (Phase 1 Wing 1,2,7 and 8) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan (Phase 1 Wing 1,2,7 and 8) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting (Phase 1 Wing 1,2,7 and 8) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Change of Land Use (Phase 1 Wing 1,2,7 and 8) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 (Phase 1 Wing 1,2,7 and 8) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity (Phase 1 Wing 1,2,7 and 8) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water (Phase 1 Wing 1,2,7 and 8) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approval/NOC under section 14 of the KTCP Act (Phase 1 Wing 1,2,7 and 8) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India (Phase 1 Wing 1,2,7 and 8) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB (Phase 1 Wing 1,2,7 and 8) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA (Phase 1 Wing 1,2,7 and 8) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Building plan (Phase 2 Wing 3,4,9 and 10) | BIAPPA - Bangalore Airport Area Planning Authority · No. LP# BIAPPA/TP/CC/226/2022-23/2658 · dated 2023-02-16 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (Phase 2 Wing 3,4,9 and 10) | Deputy Commissioner, Bangalore Rural District · No. ALN(DEV)SR:23/2012-13 · dated 2012-10-17 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate (Phase 2 Wing 3,4,9 and 10) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter (Phase 2 Wing 3,4,9 and 10) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter (Phase 2 Wing 3,4,9 and 10) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan (Phase 2 Wing 3,4,9 and 10) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan (Phase 2 Wing 3,4,9 and 10) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting (Phase 2 Wing 3,4,9 and 10) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Change of Land Use (Phase 2 Wing 3,4,9 and 10) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 (Phase 2 Wing 3,4,9 and 10) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity (Phase 2 Wing 3,4,9 and 10) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water (Phase 2 Wing 3,4,9 and 10) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approval/NOC under section 14 of the KTCP Act (Phase 2 Wing 3,4,9 and 10) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India (Phase 2 Wing 3,4,9 and 10) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB (Phase 2 Wing 3,4,9 and 10) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA (Phase 2 Wing 3,4,9 and 10) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Building plan (Phase 3 Wing 5,6,11 and 12) | BIAPPA - Bangalore Airport Area Planning Authority · No. LP# BIAPPA/TP/CC/226/2022-23/2658 · dated 2023-02-16 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (Phase 3 Wing 5,6,11 and 12) | Deputy Commissioner, Bangalore Rural District · No. ALN(DEV)SR:23/2012-13 · dated 2012-10-17 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate (Phase 3 Wing 5,6,11 and 12) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter (Phase 3 Wing 5,6,11 and 12) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter (Phase 3 Wing 5,6,11 and 12) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan (Phase 3 Wing 5,6,11 and 12) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan (Phase 3 Wing 5,6,11 and 12) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting (Phase 3 Wing 5,6,11 and 12) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Change of Land Use (Phase 3 Wing 5,6,11 and 12) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 (Phase 3 Wing 5,6,11 and 12) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity (Phase 3 Wing 5,6,11 and 12) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water (Phase 3 Wing 5,6,11 and 12) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approval/NOC under section 14 of the KTCP Act (Phase 3 Wing 5,6,11 and 12) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India (Phase 3 Wing 5,6,11 and 12) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB (Phase 3 Wing 5,6,11 and 12) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA (Phase 3 Wing 5,6,11 and 12) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA (Phase 1 Wing 1,2,7 and 8)
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BIAPPA - Bangalore Airport Area Planning Authority · No. LP# BIAPPA/TP/CC/226/2022-23/2658 · dated 16 Feb 2023
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 22 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). Each phase is registered separately; this list is for the phase named above. The project page on RERA lists each upload.
Sobha Oakshire RERA complaints
No complaints listed on Karnataka RERA for these registrations as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About SOBHA
- Founded
- 1995
- Headquarters
- Bengaluru
- Bengaluru projects
- 15
- Delivered on time
- 6 of 17
- RERA complaints
- 224
- Court cases listed
- 4
SOBHA Limited is a listed Bengaluru-headquartered developer incorporated in 1995 (CIN L45201KA1995PLC018475), with major Bengaluru projects under way including SOBHA Neopolis, Townpark and OneWorld. Of 17 Bengaluru RERA registrations with an occupancy certificate date on RERA, 6 got the OC before the original promised date; the rest came after it, mostly within COVID-era or Section 6 extensions. Karnataka RERA lists 224 complaints against the company across its projects, and court records found include owner-association disputes and a 2026 consumer order awarding a Valley View buyer compensation for delay in the sale deed.
SOBHA’s full recordSOBHA delivery record
- 27Projects in Bengaluru on RERA60 approved registrations under Sobha Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 20,806Homes registeredAs stated in each registrations.
- 234RERA complaints32 open, 202 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 11.2Complaints per 1,000 homes234 complaints ÷ 20,806 homes in its 60 registrations on Karnataka RERA in Bengaluru.
- 12Completion filed on RERARegistrations where the promoter applied to RERA for completion; 12 with an occupancy certificate on RERA.
- 3 of 12Filed by the date given at registrationMedian gap 9 months (on-time ones count as 0). The completion application can come after handover, so this is an upper bound on lateness.
- 4Court cases listedFound in public court records; see the list on the builder’s page.
What the complaints are about
234 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Completion filed on RERA
12 rows: completion applications. Scroll inside the table to see them all.
| Project | Date at registration | Completion filed | Gap |
|---|---|---|---|
| Sobha Royal Pavilion Phase 8 - Wing 15OC on RERA | 30 Sep 2025extended to 30 Jun 2026 | 1 Jul 2026 | 9 months after |
| Sobha Royal Pavilion Phase 7 - Wing 12, 13 and 14OC on RERA | 30 Sep 2025extended to 30 Jun 2026 | 1 Jul 2026 | 9 months after |
| Sobha Royal Pavilion Phase 6 - Wing 10 and 11OC on RERA | 30 Sep 2025extended to 30 Jun 2026 | 1 Jul 2026 | 9 months after |
| Sobha Royal Pavilion Phase 5 - Wing 8 and 9OC on RERA | 30 Sep 2025extended to 30 Jun 2026 | 1 Jul 2026 | 9 months after |
| Sobha Sentosa Phase 1 Wing 7OC on RERA | 30 Jun 2026 | 1 Jul 2026 | By the date |
| Sobha Windsor Phase 2 Wing 3, 4 and 5OC on RERA | 30 Apr 2026 | 14 Apr 2026 | By the date |
| Sobha Royal Pavilion Phase 1 - Wing 6 and 7OC on RERA | 30 Sep 2023extended to 30 Jun 2024 | 17 Feb 2026 | 29 months after |
| Sobha Royal Pavilion Phase 2 - Wing 4 and 5OC on RERA | 30 Sep 2023extended to 30 Jun 2024 | 17 Feb 2026 | 29 months after |
| Sobha Lake Gardens Phase 2OC on RERA | 31 Mar 2024extended to 30 Dec 2025 | 18 Nov 2025 | 20 months after |
| Sobha Windsor Phase 1 Wing 1 and 2OC on RERA | 30 Nov 2025 | 14 Nov 2025 | By the date |
| Sobha Dream Gardens Phase 1 – Wing 8 and 9OC on RERA | 29 Feb 2024extended to 29 Nov 2024 | 17 Jan 2025 | 11 months after |
| Sobha Dream Gardens Phase 2 – Wing 5, 6 and 7OC on RERA | 29 Feb 2024extended to 29 Nov 2024 | 17 Jan 2025 | 11 months after |
Measured against the completion date given at registration; many projects had RERA extensions (including the COVID-period extension), shown under the date.
Handovers we checked by hand
17 rows: handovers. Scroll inside the table to see them all.
| Project | Promised (at registration) | OC | Result | Source |
|---|---|---|---|---|
| SOBHA Insignia | 31 Mar 2026 | 5 Jan 2026 | On time | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SOBHA Windsor Phase 2 | 30 Apr 2026 | 12 Nov 2025 | On time | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SOBHA Windsor Phase 1 | 30 Nov 2025 | 22 Jan 2025 | On time | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SOBHA Sentosa Phase 1 | 30 Jun 2026 | 3 Dec 2024 | On time | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SOBHA Royal Pavilion Phase 7 | 30 Sep 2025 | 6 Feb 2026 | 4 months late | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SOBHA Royal Pavilion Phase 5 | 30 Sep 2025 | 22 Nov 2024 | On time | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SOBHA Royal Pavilion Phases 1 & 2 | 30 Sep 2023 | 13 Mar 2024 | 5 months late | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SOBHA Dream Acres – Oasis Phase 27 | 31 Dec 2025 | 12 Nov 2025 | On time | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SOBHA Dream Acres – Tropical Greens Phase 21 | 30 Jun 2025 | 18 Feb 2026 | 8 months late | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SOBHA Lake Gardens Phase 2 | 31 Mar 2024 | 14 Nov 2025 | 19 months late | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SOBHA Rajvilas | 30 Jun 2024 | 8 Jul 2024 | 1 months late | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SOBHA Dream Gardens Phase 1 | 29 Feb 2024 | 28 Oct 2024 | 8 months late | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SOBHA Dream Gardens Phase 2 | 29 Feb 2024 | 13 Mar 2024 | 1 months late | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SOBHA Forest Edge | 30 Sep 2022 | 8 Sep 2023 | 11 months late | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SOBHA HRC Pristine Phases 1–4 | 1 Jul 2022 | 26 May 2023 | 11 months late | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SOBHA Palm Court | 1 May 2021 | 24 Mar 2022 | 11 months late | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SOBHA Morzaria Grandeur 2 | 1 May 2021 | 11 May 2022 | 12 months late | Source (rera.karnataka.gov.in) (opens in a new tab) |
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)Source (supremecourtcases.com) (opens in a new tab)Source (indiankanoon.org) (opens in a new tab)Source (indiankanoon.org) (opens in a new tab)Source (indiankanoon.org) (opens in a new tab)How we calculate this
What’s changed since Feb 2023
- 15 Oct 2026Builder’s price list seen: 4 BHK from ₹5.3 Cr Source (sobha.com) (opens in a new tab)
- 14 Oct 2026Phase 2 Wing 3,4,9 and 10: Quarterly update filed for Q2 2026-27: 91% built, 30 of 30 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Oct 2026Phase 3 Wing 5,6,11 and 12: Quarterly update filed for Q2 2026-27: 91% built, 20 of 20 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 13 Oct 2026Phase 1 Wing 1,2,7 and 8: Quarterly update filed for Q2 2026-27: 100% built, 30 of 30 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 13 Jul 2026Phase 1 Wing 1,2,7 and 8: Quarterly update filed for Q1 2026-27: 100% built, 30 of 30 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 13 Jul 2026Phase 2 Wing 3,4,9 and 10: Quarterly update filed for Q1 2026-27: 90% built, 30 of 30 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 13 Jul 2026Phase 3 Wing 5,6,11 and 12: Quarterly update filed for Q1 2026-27: 90% built, 20 of 20 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 10 Apr 2026Phase 1 Wing 1,2,7 and 8: Quarterly update filed for Q4 2025-26: 80% built, 30 of 30 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 10 Apr 2026Phase 2 Wing 3,4,9 and 10: Quarterly update filed for Q4 2025-26: 40% built, 30 of 30 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 10 Apr 2026Phase 3 Wing 5,6,11 and 12: Quarterly update filed for Q4 2025-26: 54% built, 20 of 20 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 12 Jan 2026Phase 1 Wing 1,2,7 and 8: Quarterly update filed for Q3 2025-26: 60% built, 30 of 30 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 12 Jan 2026Phase 2 Wing 3,4,9 and 10: Quarterly update filed for Q3 2025-26: 35% built, 30 of 30 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 12 Jan 2026Phase 3 Wing 5,6,11 and 12: Quarterly update filed for Q3 2025-26: 54% built, 20 of 20 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Oct 2023Phase 1 Wing 1,2,7 and 8: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Oct 2023Phase 2 Wing 3,4,9 and 10: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Oct 2023Phase 3 Wing 5,6,11 and 12: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 27 Mar 2023Phase 1 Wing 1,2,7 and 8: Registered with Karnataka RERA (PRM/KA/RERA/1250/303/PR/270323/005821); completion date 31 Dec 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
- 27 Mar 2023Phase 2 Wing 3,4,9 and 10: Registered with Karnataka RERA (PRM/KA/RERA/1250/303/PR/270323/005822); completion date 30 Jun 2027 Source (rera.karnataka.gov.in) (opens in a new tab)
- 27 Mar 2023Phase 3 Wing 5,6,11 and 12: Registered with Karnataka RERA (PRM/KA/RERA/1250/303/PR/270323/005823); completion date 31 Dec 2027 Source (rera.karnataka.gov.in) (opens in a new tab)
- 16 Feb 2023Phase 1 Wing 1,2,7 and 8: Building plan approved by BIAPPA - Bangalore Airport Area Planning Authority (No. LP# BIAPPA/TP/CC/226/2022-23/2658) Source (rera.karnataka.gov.in) (opens in a new tab)
- 16 Feb 2023Phase 2 Wing 3,4,9 and 10: Building plan approved by BIAPPA - Bangalore Airport Area Planning Authority (No. LP# BIAPPA/TP/CC/226/2022-23/2658) Source (rera.karnataka.gov.in) (opens in a new tab)
- 16 Feb 2023Phase 3 Wing 5,6,11 and 12: Building plan approved by BIAPPA - Bangalore Airport Area Planning Authority (No. LP# BIAPPA/TP/CC/226/2022-23/2658) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- ₹3,67,957
- Down payment
- ₹1,06,00,000
- Loan amount
- ₹4,24,00,000
- Total interest
- ₹4,59,09,692
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s published “onwards” price for the home type, where it publishes one (it usually says government charges, other charges and taxes are extra). You can change it.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Sources:Source (sobha.com) (opens in a new tab)How we calculate this
Sobha Oakshire FAQs
What is Sobha Oakshire and where is it located?
Sobha Oakshire is a residential project by Sobha Limited in Thimmegowdana Hosahalli, Devanahalli, Bengaluru Rural, PIN 562110.
How many homes are in Sobha Oakshire?
The project has 80 homes across three phases: Phase 1 with 30 homes, Phase 2 with 30 homes, and Phase 3 with 20 homes.
What home types are available in Sobha Oakshire?
All 80 homes are 4 BHK with carpet area ranging from 2,630 to 2,667 sq ft.
When will Sobha Oakshire be completed?
Phase 1 completes by 31 December 2026, Phase 2 by 30 June 2027, and Phase 3 by 31 December 2027.
What is the RERA registration number for Sobha Oakshire?
The project has three RERA registrations: Phase 1 is PRM/KA/RERA/1250/303/PR/270323/005821, Phase 2 is PRM/KA/RERA/1250/303/PR/270323/005822, and Phase 3 is PRM/KA/RERA/1250/303/PR/270323/005823.
How many homes are booked in Sobha Oakshire?
As of Q2 2026-27, Phase 1 has 30 homes booked, Phase 2 has 30 homes booked, and Phase 3 has 20 homes booked, totalling 80 homes.
What is the construction progress of Sobha Oakshire?
As of Q2 2026-27, Phase 1 is 100% complete, Phase 2 is 91% complete, and Phase 3 is 91% complete.
Are there any RERA complaints on Sobha Oakshire?
There are no RERA complaints on this project.
How many other projects does Sobha Limited have on record in Bengaluru?
Sobha Limited has 47 projects in our Bengaluru records with 234 RERA complaints across all their projects.
Which bank holds the escrow for Sobha Oakshire?
Axis Bank holds the escrow for all three phases of Sobha Oakshire.
Written by AI from the RERA record above on 22 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Sobha Oakshire
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from SOBHA? Review the builder.
Reviews of SOBHA by verified buyers
No verified reviews of SOBHA yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Surya Serene SkylineSurya Serene Skyline | 1.6 km | 117 | Dec 2028 | 44% | 0 | Not collected |
| Merusri SunscapeMerusri Sunscape LLP | 1.9 km | 76 | Mar 2030 | 16% | 0 | Not collected |
| Aarohana AdiraAarohana Projects | 2.3 km | 140 | Dec 2030 | 5% | 0 | Not collected |
| Sattva Aeropolis Phase 2Sattva Resi Private Limited | 2.5 km | 554 | Oct 2028 | 39% | 1 | Not collected |
| Aeropolis, a project of Sattva GroupTrinayani Realtor Private Limited | 2.5 km | 1,001 | Jul 2026 | 89% | 0 | Not collected |
| Riviera SkyGSG Realty | 2.5 km | 56 | Jun 2031 | 5% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 22 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration numbers: PRM/KA/RERA/1250/303/PR/270323/005821, PRM/KA/RERA/1250/303/PR/270323/005822, PRM/KA/RERA/1250/303/PR/270323/005823.
- RERA record last checked: 22 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 22 Oct 2026
- Builder price list seen: 15 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Devanahalli
Chikkasanne, DevanahalliUnder constructionRERA registeredBuyers’ group openSurya Serene Skyline
by Surya Serene Skyline
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 746 – 1,056 sq ft
- Dec 2028
117 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Surya Serene Skyline
Upparahalli, DevanahalliUnder constructionRERA registeredBuyers’ group openAarohana Adira
by Aarohana
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK, 4 BHK
- 756 – 1,946 sq ft
- Dec 2030
140 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Aarohana Adira
Upparahalli, DevanahalliUnder constructionRERA registeredBuyers’ group openRiviera Sky
by GSG Realty
Price: Price on requestGet brochure & price →
- 4 BHK
- 2,595 – 2,676 sq ft
- Jun 2031
56 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Riviera Sky