NCC Urban Green Province Phase 2
38×60, 43×67 plots by NCC Urban Infrastructure Limited · Sompura, Sarjapur, Bengaluru
Sompura, Sarjapur, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- plotted
by NCC Urban Infrastructure Limited
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
NCC Urban Green Province Phase 2 at a glance
- Completion (RERA)Aug 2028Karnataka RERA
- Construction80% built · on pace for Dec 2026RERA filing to 30 Sep 2026; estimate from average pace
- RERA complaints (project)None listedKarnataka RERA · as on 16 Oct 2026
- Approvals filed1 of 9 on RERAKarnataka RERA uploads · 16 Oct 2026
- Nearest metroDelta Electronics Bommasandra · 10.49 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 153 min at peak37.75 km straight line · estimate
- Nearest lakeSompura Lake · 260 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
NCC Urban Green Province Phase 2 is a plotted development by NCC Urban Infrastructure Limited in Sompura, Bengaluru with 54 plots, registered with Karnataka RERA. The completion date on RERA is 31 Aug 2028.
Facts collected on 16 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the developer pays us a commission.
NCC Urban Green Province Phase 2 buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks NCC Urban Infrastructure Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the developer offers and book directly with the developer if you want to. Free for buyers. If you book through us, the developer pays us a commission.
- Gathering buyers
- Talking to the developer
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, plot size and timeline with us on a call; developers negotiate with them. Joining is free and never obliges you to buy.
Join the NCC Urban Green Province Phase 2 buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: plot sizes, approval, land and completion
- Plot sizes (feet)
- 38×60, 43×67
- Plot area
- 2,094 – 3,698 sq ft
- Total plots
- 54
- Layout approved by
- Anekal Planning Authority
- Land
- Not found in public records yet: land area
- Land conversion orders
- 8
- Completion (RERA)
- Aug 2028
- Development (RERA update)
- 80%
Plot sizes (RERA filing)
| Size (feet) | Area | Plots |
|---|---|---|
| 38×60 | 2,280 sq ft | 16 |
| 43×67 | 2,881 sq ft | 10 |
| Odd-sized (irregular) | varies | 28 |
Sizes as filed with RERA, converted from metres to feet (9.14 m = 30 ft, 12.19 m = 40 ft). Ask the developer which plots are still unsold.
Land conversion orders (RERA filing)
| Survey no. | Converted for | Order | By |
|---|---|---|---|
| 73/2 | Residential | No. 235/2007-08, 28 Oct 2010 | DC |
| 78/7 | Residential | No. 376/11-12, 25 Jun 2012 | DC |
| 78/1 | Residential | No. 236/07-08, 378/11-12, 25 Jun 2012 | DC |
| 73/6 (Old Sy No 73/1) | Residential | No. 622592, 21 Feb 2024 | DC |
| 78/4 | Residential | No. 116/2004-05, 23 Sep 2004 | DC |
| 78/2 | Residential | No. 377/11-12, 25 Jun 2012 | DC |
| 78/8 | Residential | No. 767951, 9 Jun 2025 | DC |
| 78/9 | Residential | No. 767952, 9 Jun 2025 | DC |
RERA does not cover each plot’s khata. Ask the developer for the khata and title documents and have a lawyer check them before paying an advance.
NCC Urban Green Province Phase 2 RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/308/PR/020126/008375
- Registered on
- 2 Jan 2026
- Promised completion
- 31 Aug 2028
- Extended to
- No extension recorded
- RERA status
- Under construction
- Plots booked
- Not found in public records yet: plots booked
- Price
- Not found in public records yet: price
- Project type
- Plotted
Summary in plain English
NCC Urban Green Province Phase 2 is a plotted layout in Sompura, Anekal, with 54 plots developed by NCC Urban Infrastructure Limited. The layout is approved by Anekal Planning Authority and has 8 land conversion orders. It is registered with Karnataka RERA and is expected to be completed by 31 August 2028.
Written by AI from the RERA record above on 16 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, loans, escrow and other details
- Open space
- Not found in public records yet: open space
- Water and power
- Water source filed with RERA: BoreWell
- Plot loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- ICICI Bank, BAGALUR BANGALORE
- Building plan (RERA)
- Anekal Planning Authority · No. APA/LAO/32/2025-26 · dated 12 Sep 2025
- Project cost declared to RERA
- ₹68.53 Cr
Amenities
NCC Urban Green Province Phase 2 location and address
- Address
- Sy No - 73/6, 73/2,78/1,78/2,78/4,78/7,78/8,78/9, Sompura Village, , Sarjapura Hobli, Anekal Taluk, Bengaluru , Anekal , Bengaluru Urban, Karnataka - 562125
- Village (RERA)
- Sompura
- Locality
- SarjapurAlso known as Sarjapura
- PIN code
- 562125
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.86759, 77.77155
Distances to landmarks
Not found in public records yet: landmarksAbout Sarjapur
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 11.61 km | approx. 47 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 11.72 km | approx. 47 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 13.84 km | approx. 56 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 25.11 km | approx. 102 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 25.95 km | approx. 105 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 37.75 km | approx. 153 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 8Schools and colleges6 schools, 2 colleges, 0 kindergartens
- 4Hospitals and clinics3 hospitals, 1 clinics
Nearest schools and colleges
- Sardhar Vallabhbai Patel Education Society · 1.48 km
- ALLEN Career Institute · 1.55 km
- Sri Ram Public School · 1.7 km
Nearest hospitals and clinics
- Healing Hands Clinic - Sarjapura, Bengaluru · 0.42 km
- Spandana · 0.49 km
- Sarjapura Urban Primary Health Centre · 1.56 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Delta Electronics Bommasandra (ಡೆಲ್ಟಾ ಎಲೆಕ್ಟ್ರಾನಿಕ್ಸ್ ಬೊಮ್ಮಸಂದ್ರ)Open now — nearest operating metro station10.49 km
- Huskuru (ಹುಸ್ಕೂರ್)Nearest railway station6.68 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Sompura Lake, 260 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Sompura Lake on OpenStreetMap (opens in a new tab) 260 m
- Sarjapur Doddakere Lake on OpenStreetMap (opens in a new tab) 694 m
- Yamare Lake on OpenStreetMap (opens in a new tab) 1,418 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
NCC Urban Green Province Phase 2 layout plan and plot types as filed
Documents the developer uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Brochure

BrochureFull PDF on RERA
Approved layout plan

Approved Layout Plan/Demarcation PlanFull PDF on RERA
| Plot type (as filed) | Area | Plots |
|---|---|---|
| 11.58*18.00 | — | 16 |
| 13.18*20.38 | — | 10 |
| Odd | — | 28 |
Plot types and counts as filed with Karnataka RERA.
We have not collected the layout plan drawing; the developer’s sales team can share it.
NCC Urban Green Province Phase 2 completion date and development status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
Timeline
- 1 Oct 2025Project start date given to RERA
- 2 Jan 2026Registered with Karnataka RERA
- 31 Aug 2028Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Dec 2026 — about 20 months before the completion date on RERA (31 Aug 2028).
At the pace between the 3 quarterly filings we have (50% → 80% in 6 months), it would be around Jan 2027 — about 19 months before the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Developed | Plots booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 15 Oct 2026 | 80% | — |
| Q1 2026-27to 30 Jun 2026 | 15 Jul 2026 | 69% | — |
| Q4 2025-26to 31 Mar 2026 | 15 Apr 2026 | 50% | — |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 80% ÷ 12 months (1 Oct 2025 to 30 Sep 2026) = 6.7% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 20 ÷ 6.7 = 3 months → Dec 2026. This is an estimate, not a date from the builder or RERA.
Pace between filings = (80% − 50%) ÷ 6 months = 5% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Layout plan | Anekal Planning Authority · No. APA/LAO/32/2025-26 · dated 2025-09-12 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (8 orders) | DC · No. 235/2007-08 and 7 more · dated 2025-06-09 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan/Demarcation Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — Anekal Planning Authority · No. APA/LAO/32/2025-26 · dated 12 Sep 2025
- Commencement certificate · Permission to start buildingNot on RERA yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBNot on RERA yet
- Water and sewerage · BWSSBNot on RERA yet
- Electricity · BESCOMNot on RERA yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 16 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
NCC Urban Green Province Phase 2 RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About NCC Urban Infrastructure Limited
- Promoter type
- Company
- Projects on this site
- 3
- RERA complaints against promoter
- 0
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (16 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
NCC Urban Infrastructure Limited’s RERA recordNCC Urban Infrastructure Limited delivery record
- 3Projects in Bengaluru on RERA3 approved registrations under NCC Urban Infrastructure Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 376Homes and plots registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 homes and plots0 complaints ÷ 376 homes and plots in its 3 registrations on Karnataka RERA in Bengaluru.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Sep 2025
- 15 Oct 2026Quarterly update filed for Q2 2026-27: 80% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Quarterly update filed for Q1 2026-27: 69% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Quarterly update filed for Q4 2025-26: 50% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 2 Jan 2026Registered with Karnataka RERA (PRM/KA/RERA/1251/308/PR/020126/008375); completion date 31 Aug 2028 Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Oct 2025Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 12 Sep 2025Building plan approved by Anekal Planning Authority (No. APA/LAO/32/2025-26) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Plot loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
NCC Urban Green Province Phase 2 FAQs
What are the plot sizes in NCC Urban Green Province Phase 2?
The layout has plots of 38×60 sq ft (16 plots at 2,280 sq ft each), 43×67 sq ft (10 plots at 2,881 sq ft each), and 28 odd-sized plots. The sizes of the odd-sized plots are not in the RERA record.
How many plots are in NCC Urban Green Province Phase 2?
There are 54 plots in total in the layout.
Which authority approved the layout of NCC Urban Green Province Phase 2?
Anekal Planning Authority approved the layout.
How many land conversion orders has NCC Urban Green Province Phase 2 received?
The project has 8 land conversion orders.
What is the RERA registration number for NCC Urban Green Province Phase 2?
The RERA registration number is PRM/KA/RERA/1251/308/PR/020126/008375, registered on 2 January 2026.
When will NCC Urban Green Province Phase 2 be completed?
The completion date on RERA is 31 August 2028.
What is the development progress of NCC Urban Green Province Phase 2?
As of Q2 2026-27 (quarter ended 30 September 2026), the layout is 80% developed.
Are there any RERA complaints against NCC Urban Green Province Phase 2?
No complaints have been filed against this project on RERA.
Where is NCC Urban Green Province Phase 2 located?
The project is in Sompura, Anekal taluk, Bengaluru Urban district, PIN code 562125.
What is NCC Urban Infrastructure Limited's record with RERA?
The developer has 8 projects on record in Bengaluru with RERA and has no complaints filed against it across all projects.
Written by AI from the RERA record above on 16 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about NCC Urban Green Province Phase 2
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a plot from NCC Urban Infrastructure Limited? Review the developer.
Reviews of NCC Urban Infrastructure Limited by verified buyers
No verified reviews of NCC Urban Infrastructure Limited yet. If you bought a plot from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the developer may reply.
Similar projects within 5 km
| Project | Distance | Plots | Completion (RERA) | Developed | Complaints | Price |
|---|---|---|---|---|---|---|
| Inspira Trees Of LifeIinspira Springdale Private Limited | 1.9 km | 211 | Jun 2028extended | 18% | 2 | Not collected |
| Vanna - Phase 2Vciti Projects LLP | 2 km | 38 | Dec 2026 | — | 0 | Not collected |
| Daintree 3BSR Projects | 2.1 km | 27 | Feb 2027 | 7% | 0 | Not collected |
| Metropolis Fair Oaks II ExtnMetropolis Fair Oaks II | 2.2 km | 18 | Dec 2025 | 100% | 0 | Not collected |
| The Grand County AddressIndiabuild Realtors Private Limited | 2.3 km | 158 | Dec 2028 | 22% | 0 | Not collected |
| Urban RetreatSri Balaji Builders | 2.5 km | 98 | Dec 2025 | — | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the developer’s own website where we found one.
Sources and last checked dates
Collected on 16 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/308/PR/020126/008375.
- RERA record last checked: 16 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 16 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the developer’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Sarjapur
SarjapurUnder constructionRERA registeredBuyers’ group openInspira Trees Of Life
by Iinspira Springdale
Price: Price on requestGet brochure & price →
- 30×50, 40×60
- 751 – 12,892 sq ft plots
- Approved by BMRDA
- Jun 2028 (extended)
211 plots · 2 RERA complaints
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Inspira Trees Of Life
Agrahara, SarjapurUnder constructionRERA registeredBuyers’ group openVanna - Phase 2
by Vciti
Price: Price on requestGet brochure & price →
- 30×30
- 752 – 1,881 sq ft plots
- Approved by STRR Planning Authority
- Dec 2026
38 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Vanna - Phase 2
Sarjapura, SarjapurUnder constructionRERA registeredBuyers’ group openMetropolis Fair Oaks II Extn
by Metropolis Fair Oaks II
Price: Price on requestGet brochure & price →
- Plot sizes not found
- 87 – 164 sq ft plots
- Approved by BMRDA
- Dec 2025
RERA not updated since promised Dec 2025 · 18 plots