Nexfield
30×50, 30×60 plots by Siddhatva Developers Private Limited · Konaghatta, Doddaballapur Road, Bengaluru
Konaghatta, Doddaballapur Road, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- plotted
by Siddhatva Developers Private Limited
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Nexfield at a glance
- Completion (RERA)Nov 2027Karnataka RERA
- Construction96% built · on pace for Oct 2026RERA filing to 30 Sep 2026; estimate from average pace
- RERA complaints (project)None listedKarnataka RERA · as on 16 Oct 2026
- Approvals filed3 of 9 on RERAKarnataka RERA uploads · 16 Oct 2026
- Nearest metroDoddajala · 14.65 km (under construction)Open now: Nagasandra, 32.21 km · straight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 66 min at peak16.26 km straight line · estimate
- Nearest lakeUnnamed lake · 1,115 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Nexfield is a plotted development by Siddhatva Developers Private Limited in Konaghatta, Bengaluru with 142 plots, registered with Karnataka RERA. The completion date on RERA is 25 Nov 2027.
Facts collected on 16 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the developer pays us a commission.
Nexfield buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Siddhatva Developers Private Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the developer offers and book directly with the developer if you want to. Free for buyers. If you book through us, the developer pays us a commission.
- Gathering buyers
- Talking to the developer
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, plot size and timeline with us on a call; developers negotiate with them. Joining is free and never obliges you to buy.
Join the Nexfield buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: plot sizes, approval, land and completion
- Plot sizes (feet)
- 30×50, 30×60
- Plot area
- 1,030 – 20,528 sq ft
- Total plots
- 142
- Layout approved by
- STRR Planning Authority
- Land
- Not found in public records yet: land area
- Land conversion orders
- 9
- Completion (RERA)
- Nov 2027
- Development (RERA update)
- 96%
Plot sizes (RERA filing)
| Size (feet) | Area | Plots |
|---|---|---|
| 30×50 | 1,500 sq ft | 78 |
| 30×60 | 1,800 sq ft | 20 |
| Odd-sized (irregular) | varies | 44 |
Sizes as filed with RERA, converted from metres to feet (9.14 m = 30 ft, 12.19 m = 40 ft). Ask the developer which plots are still unsold.
Approving authority as filed: Satellite Town Ring Road Planning Authority.
Land conversion orders (RERA filing)
| Survey no. | Converted for | Order | By |
|---|---|---|---|
| 41/2 | Residential | No. 754136, 20 Mar 2025 | DC BENGALURU RURAL |
| 41/3 | Residential | No. 754140, 19 Mar 2025 | DC BANGALORE RURAL |
| 41/4 | Residential | No. 754143, 20 Mar 2025 | DC BANGALORE RURAL |
| 42/6 | Residential | No. 754137, 19 Mar 2025 | DC BANGALORE RURAL |
| 43/2 | Residential | No. 754144, 19 Mar 2025 | DC BANGALORE RURAL |
| 45/2 | Residential | No. 754134, 19 Mar 2025 | DC BANGALORE RURAL |
| 45/3 | Residential | No. 754139, 20 Mar 2025 | DC BANGALORE RURAL |
| 45/4 | Residential | No. 768823, 20 May 2025 | DC BANGALORE RURAL |
| 45/5 | Residential | No. 768822, 20 May 2025 | DC BANGALORE RURAL |
RERA does not cover each plot’s khata. Ask the developer for the khata and title documents and have a lawyer check them before paying an advance.
Nexfield RERA number and registration details
- RERA number
- PRM/KA/RERA/1250/301/PR/101025/008157
- Registered on
- 10 Oct 2025
- Promised completion
- 25 Nov 2027
- Extended to
- No extension recorded
- RERA status
- Under construction
- Plots booked
- Not found in public records yet: plots booked
- Price
- Not found in public records yet: price
- Project type
- Plotted
Summary in plain English
Nexfield is a plotted layout by Siddhatva Developers Private Limited in Konaghatta, Doddaballapura taluk, Bengaluru Rural district. The project has 142 plots and is registered with Karnataka RERA. The completion date on RERA is 25 November 2027.
Written by AI from the RERA record above on 16 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, loans, escrow and other details
- Open space
- Not found in public records yet: open space
- Water and power
- Water source filed with RERA: BoreWell,KUWSDB
- Plot loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- ICICI Bank, RT NAGAR
- Building plan (RERA)
- Satellite Town Ring Road Planning Authority · No. STRRPA/TP/LAO/53/2024-25/25-26 · dated 9 Jul 2025
- Project cost declared to RERA
- ₹30 Cr
Amenities
Nexfield location and address
- Address
- SY NO. 41/2 41/3 41/4 42/6 43/2 45/2 45/3 45/4 AND 45/5 , OF KONAGHATTA VILLAGE, KASABA HOBLI, DODDABALAPURA TALUK , Doddaballapura , Bengaluru Rural, Karnataka - 562163
- Village (RERA)
- Konaghatta
- Locality
- Doddaballapur RoadAlso known as Doddaballapura Road, Doddaballapur Main Road
- PIN code
- 562163
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.31628, 77.61230
Distances to landmarks
Not found in public records yet: landmarksAbout Doddaballapur Road
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 16.26 km | approx. 66 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 29.83 km | approx. 121 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 37.88 km | approx. 153 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 38.99 km | approx. 158 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 44.29 km | approx. 179 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 52.2 km | approx. 211 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Nearest metro station and railway
- Doddajala (ದೊಡ್ಡಜಾಲ)Blue Line metro, under construction14.65 km
- Airport City (ವಿಮಾನ ನಿಲ್ದಾಣ ನಗರ)Blue Line metro, under construction15.4 km
- KIAL Terminals (ಕೆಐಎಬಿ ವಿಮಾನ ನಿಲ್ದಾಣ ಟರ್ಮಿನಲ್ಸ್)Blue Line metro, under construction17.06 km
- Nagasandra (ನಾಗಸಂದ್ರ)Open now — nearest operating metro station32.21 km
- Dodballapur (ದೊಡ್ಡಬಳ್ಳಾಪುರ)Nearest railway station7.83 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 1,115 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,115 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,710 m
- Aruvanahalli Tank on OpenStreetMap (opens in a new tab) 1,833 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Nexfield layout plan and plot types as filed
Documents the developer uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Brochure8 pages

BrochureFull PDF on RERA 






Approved layout plan

Approved Layout Plan/Demarcation PlanFull PDF on RERA
| Plot type (as filed) | Area | Plots |
|---|---|---|
| Plot 9.14 m × 15.24 m | — | 78 |
| Plot 9.14 m × 18.29 m | — | 20 |
| Odd-shaped plots | — | 44 |
Plot types and counts as filed with Karnataka RERA.
We have not collected the layout plan drawing; the developer’s sales team can share it.
Nexfield completion date and development status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-14.
Timeline
- 9 Jul 2025Project start date given to RERA
- 10 Oct 2025Registered with Karnataka RERA
- 25 Nov 2027Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Oct 2026 — about 13 months before the completion date on RERA (25 Nov 2027).
At the pace between the 4 quarterly filings we have (46% → 96% in 9 months), it would be around Oct 2026 — about 13 months before the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Developed | Plots booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 14 Oct 2026 | 96% | — |
| Q1 2026-27to 30 Jun 2026 | 14 Jul 2026 | 91% | — |
| Q4 2025-26to 31 Mar 2026 | 15 Apr 2026 | 46% | — |
| Q3 2025-26to 31 Dec 2025 | 17 Jan 2026 | 46% | — |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 96% ÷ 14.7 months (9 Jul 2025 to 30 Sep 2026) = 6.5% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 4 ÷ 6.5 = 0.6 months → Oct 2026. This is an estimate, not a date from the builder or RERA.
Pace between filings = (96% − 46%) ÷ 9 months = 5.6% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-14.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Layout plan | Satellite Town Ring Road Planning Authority · No. STRRPA/TP/LAO/53/2024-25/25-26 · dated 2025-07-09 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (9 orders) | DC BENGALURU RURAL · No. 754136 and 8 more · dated 2025-05-20 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan/Demarcation Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| NOC from ESCOMs | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| NOC for Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — Satellite Town Ring Road Planning Authority · No. STRRPA/TP/LAO/53/2024-25/25-26 · dated 9 Jul 2025
- Commencement certificate · Permission to start buildingNot on RERA yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBNot on RERA yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 16 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Nexfield RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Siddhatva Developers Private Limited
- Promoter type
- Company
- Projects on this site
- 1
- RERA complaints against promoter
- 0
- Company number (CIN)
- U68100KA2023PTC180625
From Karnataka RERA, as collected so far (16 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Siddhatva Developers Private Limited’s RERA recordSiddhatva Developers Private Limited delivery record
- 1Projects in Bengaluru on RERA1 approved registration under Siddhatva Developers Private Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 142Plots registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 plots0 complaints ÷ 142 plots in its 1 registration on Karnataka RERA in Bengaluru.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Jul 2025
- 14 Oct 2026Quarterly update filed for Q2 2026-27: 96% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Jul 2026Quarterly update filed for Q1 2026-27: 91% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Quarterly update filed for Q4 2025-26: 46% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 17 Jan 2026Quarterly update filed for Q3 2025-26: 46% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 10 Oct 2025Registered with Karnataka RERA (PRM/KA/RERA/1250/301/PR/101025/008157); completion date 25 Nov 2027 Source (rera.karnataka.gov.in) (opens in a new tab)
- 9 Jul 2025Building plan approved by Satellite Town Ring Road Planning Authority (No. STRRPA/TP/LAO/53/2024-25/25-26) Source (rera.karnataka.gov.in) (opens in a new tab)
- 9 Jul 2025Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Plot loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
Nexfield FAQs
What plot sizes are available in Nexfield?
The project has plots of 30×50 feet (1,500 sq ft, 78 plots) and 30×60 feet (1,800 sq ft, 20 plots). There are also 44 odd-sized plots; their sizes are not in the RERA record.
How many plots are in Nexfield?
Nexfield has 142 plots in total.
Which authority approved the Nexfield layout?
The layout was approved by STRR Planning Authority.
How many land conversion orders does Nexfield have?
The project has 9 land conversion orders.
What is the RERA registration number for Nexfield?
The RERA registration number is PRM/KA/RERA/1250/301/PR/101025/008157. The project was registered on 10 October 2025.
When will Nexfield be completed?
According to RERA, the completion date is 25 November 2027.
What is the development progress of Nexfield?
As of Q2 2026-27 (ended 30 September 2026), the layout development is 96 percent complete.
Are there any RERA complaints against Nexfield or Siddhatva Developers?
There are no RERA complaints on this project. There are also no RERA complaints against the developer across all projects on record.
Where is Nexfield located?
Nexfield is in Konaghatta, Doddaballapura taluk, Bengaluru Rural district, PIN code 562163.
Written by AI from the RERA record above on 16 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Nexfield
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a plot from Siddhatva Developers Private Limited? Review the developer.
Reviews of Siddhatva Developers Private Limited by verified buyers
No verified reviews of Siddhatva Developers Private Limited yet. If you bought a plot from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the developer may reply.
Similar projects within 5 km
| Project | Distance | Plots | Completion (RERA) | Developed | Complaints | Price |
|---|---|---|---|---|---|---|
| Windsor HillsideVihana Properties Private Limited | 0.5 km | 130 | Dec 2027 | 100% | 0 | Not collected |
| The Northern ChimesSkyberg Ecoinnovate Projects LLP | 2.9 km | 59 | Mar 2027 | — | 0 | Not collected |
| Canterbury LakesideVyasti Project | 3.6 km | 62 | Nov 2025 | — | 0 | Not collected |
| Make BoroughIron Kore Private Limited | 4.7 km | 35 | Mar 2027 | 100% | 0 | Not collected |
| Northern BoulevardNimishamba Developers | 4.8 km | 269 | Dec 2025extended | 100% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the developer’s own website where we found one.
Sources and last checked dates
Collected on 16 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1250/301/PR/101025/008157.
- RERA record last checked: 16 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 16 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the developer’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Doddaballapur Road
Konaghatta, Doddaballapur RoadUnder constructionRERA registeredBuyers’ group openWindsor Hillside
by Vihana Properties
Price: Price on requestGet brochure & price →
- 30×40, 30×50, 30×60
- 1,166 – 9,512 sq ft plots
- Approved by STRR Planning Authority
- Dec 2027
130 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Windsor Hillside
Dandudasakodigehalli, Doddaballapur RoadUnder constructionRERA registeredBuyers’ group openCanterbury Lakeside
by Vyasti
Price: Price on requestGet brochure & price →
- 30×40, 50×300
- 707 – 2,708 sq ft plots
- Approved by BIAAPA
- Nov 2025
RERA not updated since promised Nov 2025 · 62 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Canterbury Lakeside
Shivapura, Doddaballapur RoadUnder constructionRERA registeredBuyers’ group openLagos
by B&M Homes
Price: Price on requestGet brochure & price →
- 30×40, 30×50, 40×60 +2 more
- 1,049 – 14,272 sq ft plots
- Approved by Local Planning Authority
- Dec 2027
298 plots
Be one of the first 10 buyers in this groupFounding members — it’s free