The Northern Chimes
30×50, 35×50 +1 more plots by Skyberg Ecoinnovate Projects LLP · Managondanahalli, Devanahalli, Bengaluru
Managondanahalli, Devanahalli, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- plotted
by Skyberg Ecoinnovate Projects LLP
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
The Northern Chimes at a glance
- Completion (RERA)Mar 2027Karnataka RERA
- RERA complaints (project)None listedKarnataka RERA · as on 16 Oct 2026
- Approvals filed5 of 9 on RERAKarnataka RERA uploads · 16 Oct 2026
- Nearest metroDoddajala · 12.42 km (under construction)Open now: Dasarahalli, 31.35 km · straight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 54 min at peak13.42 km straight line · estimate
- Nearest lakeAruvanahalli Tank · 850 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
The Northern Chimes is a plotted development by Skyberg Ecoinnovate Projects LLP in Managondanahalli, Bengaluru with 59 plots, registered with Karnataka RERA. The completion date on RERA is 31 Mar 2027.
Facts collected on 16 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the developer pays us a commission.
The Northern Chimes buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Skyberg Ecoinnovate Projects LLP for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the developer offers and book directly with the developer if you want to. Free for buyers. If you book through us, the developer pays us a commission.
- Gathering buyers
- Talking to the developer
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, plot size and timeline with us on a call; developers negotiate with them. Joining is free and never obliges you to buy.
Join the The Northern Chimes buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: plot sizes, approval, land and completion
- Plot sizes (feet)
- 30×50, 35×50, 30×60
- Plot area
- 944 – 3,446 sq ft
- Total plots
- 59
- Layout approved by
- STRR Planning Authority
- Land
- Not found in public records yet: land area
- Land conversion orders
- 4
- Completion (RERA)
- Mar 2027
- Development (RERA update)
- Not found in public records yet: development progress
Plot sizes (RERA filing)
| Size (feet) | Area | Plots |
|---|---|---|
| 30×50 | 1,500 sq ft | 24 |
| 35×50 | 1,750 sq ft | 12 |
| 30×60 | 1,800 sq ft | 4 |
| Odd-sized (irregular) | varies | 17 |
Sizes as filed with RERA, converted from metres to feet (9.14 m = 30 ft, 12.19 m = 40 ft). Ask the developer which plots are still unsold.
Approving authority as filed: Satellite Town Ring Road Planning Authority.
Land conversion orders (RERA filing)
| Survey no. | Converted for | Order | By |
|---|---|---|---|
| 108/1 | Residential | No. No 815645, 5 Dec 2025 | Deputy Commissioner Bangalore Rural District |
| 108/2 | Residential | No. No 815642, 5 Dec 2025 | Deputy Commissioner Bangalore Rural District |
| 108/3 | Residential | No. No 815643, 5 Dec 2025 | Deputy Commissioner Bangalore Rural District |
| 108/4 | Residential | No. No 815646, 5 Dec 2025 | Deputy Commissioner Bangalore Rural District |
RERA does not cover each plot’s khata. Ask the developer for the khata and title documents and have a lawyer check them before paying an advance.
The Northern Chimes RERA number and registration details
- RERA number
- PRM/KA/RERA/1250/303/PR/110926/008936
- Registered on
- 11 Sep 2026
- Promised completion
- 31 Mar 2027
- Extended to
- No extension recorded
- RERA status
- Under construction
- Plots booked
- Not found in public records yet: plots booked
- Price
- Not found in public records yet: price
- Project type
- Plotted
Summary in plain English
The Northern Chimes is a plotted layout in Managondanahalli, Devanahalli, Bengaluru Rural, developed by Skyberg Ecoinnovate Projects LLP. The project has 59 plots in various sizes. RERA registration shows a completion date of 31 March 2027.
Written by AI from the RERA record above on 7 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, loans, escrow and other details
- Open space
- Not found in public records yet: open space
- Water and power
- Water source filed with RERA: BoreWell
- Plot loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- HDFC, Devanahalli
- Building plan (RERA)
- Satellite Town Ring Road Planning Authority · No. STRRPA/TP/LAO/49/2025-26 · dated 12 Mar 2026
- Project cost declared to RERA
- ₹20.42 Cr
Amenities
The Northern Chimes location and address
- Address
- Sy no 108/1, 108/2, 108/3 & 108/4 of Managondanahalli Village, , Kundana Hobli, Devanahalli Taluk, , Devanahalli , Bengaluru Rural, Karnataka - 562164
- Village (RERA)
- Managondanahalli
- Locality
- Devanahalli
- PIN code
- 562164
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.29956, 77.63326
Distances to landmarks
Not found in public records yet: landmarksAbout Devanahalli
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 13.42 km | approx. 54 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 27.99 km | approx. 113 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 36.4 km | approx. 147 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 36.48 km | approx. 148 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 42.11 km | approx. 171 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 50.14 km | approx. 203 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Nearest metro station and railway
- Doddajala (ದೊಡ್ಡಜಾಲ)Blue Line metro, under construction12.42 km
- Airport City (ವಿಮಾನ ನಿಲ್ದಾಣ ನಗರ)Blue Line metro, under construction12.67 km
- KIAL Terminals (ಕೆಐಎಬಿ ವಿಮಾನ ನಿಲ್ದಾಣ ಟರ್ಮಿನಲ್ಸ್)Blue Line metro, under construction14.19 km
- Dasarahalli (ದಾಸರಹಳ್ಳಿ)Open now — nearest operating metro station31.35 km
- Dodballapur (ದೊಡ್ಡಬಳ್ಳಾಪುರ)Nearest railway station9.22 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Aruvanahalli Tank, 850 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Aruvanahalli Tank on OpenStreetMap (opens in a new tab) 850 m
- Ramanathapura Lake on OpenStreetMap (opens in a new tab) 1,257 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
The Northern Chimes layout plan and plot types as filed
Documents the developer uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Brochure11 pages

BrochureFull PDF on RERA 






Approved layout plan2 files

Approved Layout Plan/Demarcation PlanFull PDF on RERA 
1 VILLAGE MAP WITH DEMARCATIONFiled 12 Aug 2026 · Full PDF on RERA
| Plot type (as filed) | Area | Plots |
|---|---|---|
| Odd | — | 17 |
| Regular 9.14 x 15.24 | — | 24 |
| Regular 9.14 x 18.29 | — | 4 |
| Regular 10.67 x 15.24 | — | 12 |
Plot types and counts as filed with Karnataka RERA.
We have not collected the layout plan drawing; the developer’s sales team can share it.
The Northern Chimes completion date and development status
Timeline
- 12 Mar 2026Project start date given to RERA
- 11 Sep 2026Registered with Karnataka RERA
- 31 Mar 2027Completion date given at registration
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Layout plan | Satellite Town Ring Road Planning Authority · No. STRRPA/TP/LAO/49/2025-26 · dated 2026-03-12 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (4 orders) | Deputy Commissioner Bangalore Rural District · No. No 815645 and 3 more · dated 2025-12-05 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan/Demarcation Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| NOC from ESCOMs | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| NOC for Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB (If Applicable) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA (If Applicable) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — Satellite Town Ring Road Planning Authority · No. STRRPA/TP/LAO/49/2025-26 · dated 12 Mar 2026
- Commencement certificate · Permission to start buildingNot on RERA yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 16 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
The Northern Chimes RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Skyberg Ecoinnovate Projects LLP
- Promoter type
- Partnership Firm
- Projects on this site
- 1
- RERA complaints against promoter
- 0
- Company number (CIN)
- ACR-4270
From Karnataka RERA, as collected so far (16 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Skyberg Ecoinnovate Projects LLP’s RERA recordSkyberg Ecoinnovate Projects LLP delivery record
- 1Projects in Bengaluru on RERA1 approved registration under Skyberg Ecoinnovate Projects LLP in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 59Plots registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 plots0 complaints ÷ 59 plots in its 1 registration on Karnataka RERA in Bengaluru.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Mar 2026
- 11 Sep 2026Registered with Karnataka RERA (PRM/KA/RERA/1250/303/PR/110926/008936); completion date 31 Mar 2027 Source (rera.karnataka.gov.in) (opens in a new tab)
- 12 Mar 2026Building plan approved by Satellite Town Ring Road Planning Authority (No. STRRPA/TP/LAO/49/2025-26) Source (rera.karnataka.gov.in) (opens in a new tab)
- 12 Mar 2026Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Plot loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
The Northern Chimes FAQs
What are the plot sizes in The Northern Chimes?
The project offers plots in three standard sizes: 30×50 feet (1,500 sq ft, 24 plots), 35×50 feet (1,750 sq ft, 12 plots), and 30×60 feet (1,800 sq ft, 4 plots). There are also 17 odd-sized plots.
How many plots are there in The Northern Chimes?
The project has 59 plots in total.
What is the RERA registration number for The Northern Chimes?
The RERA registration number is PRM/KA/RERA/1250/303/PR/110926/008936, registered on 11 September 2026.
When will The Northern Chimes be completed?
According to RERA, the completion date is 31 March 2027.
Who approved the layout for The Northern Chimes?
The layout was approved by STRR Planning Authority.
How many land conversion orders were issued for The Northern Chimes?
There are 4 land conversion orders on record for the project.
Where is The Northern Chimes located?
The project is in Managondanahalli, Devanahalli taluk, Bengaluru Rural district, PIN code 562164.
Are there any RERA complaints against The Northern Chimes or its developer?
There are no RERA complaints on this project and no complaints against the developer Skyberg Ecoinnovate Projects LLP in our records.
How many projects does the developer have in our RERA records?
Skyberg Ecoinnovate Projects LLP has 1 project in our Bengaluru records, which is The Northern Chimes.
Written by AI from the RERA record above on 7 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about The Northern Chimes
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a plot from Skyberg Ecoinnovate Projects LLP? Review the developer.
Reviews of Skyberg Ecoinnovate Projects LLP by verified buyers
No verified reviews of Skyberg Ecoinnovate Projects LLP yet. If you bought a plot from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the developer may reply.
Similar projects within 5 km
| Project | Distance | Plots | Completion (RERA) | Developed | Complaints | Price |
|---|---|---|---|---|---|---|
| NexfieldSiddhatva Developers Private Limited | 2.9 km | 142 | Nov 2027 | 96% | 0 | Not collected |
| Northern BoulevardNimishamba Developers | 3.4 km | 269 | Dec 2025extended | 100% | 0 | Not collected |
| Windsor HillsideVihana Properties Private Limited | 3.4 km | 130 | Dec 2027 | 100% | 0 | Not collected |
| Arvind Orchards Phase-2Arvind SmartSpaces Limited | 3.6 km | 70 | Dec 2029 | 81% | 0 | Not collected |
| Arvind OrchardsArvind SmartSpaces Limited | 3.9 km | 313 | Dec 2029 | 100% | 0 | Not collected |
| Prestige Gardenia EstatePrestige Estates Projects Ltd | 3.9 km | 711 | Oct 2027 | — | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the developer’s own website where we found one.
Sources and last checked dates
Collected on 16 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1250/303/PR/110926/008936.
- RERA record last checked: 16 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 11 Sep 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the developer’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Devanahalli
- Aluru Duddanahalli, DevanahalliReady to moveRERA registeredBuyers’ group open
Northern Boulevard
by Nimishamba
Price: Price on requestGet brochure & price →
- 30×40, 30×50, 40×60
- 12,400 – 37,437 sq ft plots
- Approved by Local Planning Authority
- Dec 2025 (extended)
269 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Northern Boulevard - Kundana, DevanahalliReady to moveRERA registeredBuyers’ group open
G K Hill View
by G K Builders
Price: Price on requestGet brochure & price →
- 30×40, 30×50, 40×60 +1 more
- 794 – 7,723 sq ft plots
- Approved by BIAAPA
- Jun 2025
267 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for G K Hill View
Savakanahalli, DevanahalliUnder constructionRERA registeredBuyers’ group openMadhuban
by Sidharth Madhuban
Price: Price on requestGet brochure & price →
- 30×40, 30×50, 40×60
- 12,917 – 94,841 sq ft plots
- Approved by Local Planning Authority
- Mar 2028
128 plots
Be one of the first 10 buyers in this groupFounding members — it’s free