- Completion filed with RERA
- RERA registered
- plotted
Plots still available: 23 of 50 plots were unsold when the developer filed completion with RERA (22 Feb 2026). Some may have sold since — join the group and we’ll ask the developer what is left and for a group price.
Price: Price on request
Nisarga Lotus at a glance
- Completion (RERA)Dec 2026Karnataka RERA
- RERA complaints (project)None listedKarnataka RERA · as on 4 Oct 2026
- Approvals filed4 of 9 on RERAKarnataka RERA uploads · 4 Oct 2026
- Nearest metroDoddajala · 3.55 km (under construction)Open now: Peenya, 24.02 km · straight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 28 min at peak6.92 km straight line · estimate
- Nearest lakeUnnamed lake · 311 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Nisarga Lotus is a plotted development by Nisarga Developers in Ilthore, Bengaluru with 52 plots, registered with Karnataka RERA. The completion date on RERA is 31 Dec 2026.
Facts collected on 4 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the developer pays us a commission.
Nisarga Lotus buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Nisarga Developers for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the developer offers and book directly with the developer if you want to. Free for buyers. If you book through us, the developer pays us a commission.
- Gathering buyers
- Talking to the developer
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, plot size and timeline with us on a call; developers negotiate with them. Joining is free and never obliges you to buy.
Join the Nisarga Lotus buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: plot sizes, approval, land and completion
- Plot sizes (feet)
- 30×40, 40×60
- Plot area
- 838 – 3,626 sq ft
- Total plots
- 52
- Layout approved by
- BIAAPA
- Land
- Not found in public records yet: land area
- Land conversion orders
- 1
- Completion (RERA)
- Dec 2026
- Development (RERA update)
- Not found in public records yet: development progress
Plot sizes (RERA filing)
| Size (feet) | Area | Plots |
|---|---|---|
| 30×40 | 1,200 sq ft | 29 |
| 40×60 | 2,400 sq ft | 2 |
| Odd-sized (irregular) | varies | 21 |
Sizes as filed with RERA, converted from metres to feet (9.14 m = 30 ft, 12.19 m = 40 ft). Ask the developer which plots are still unsold.
Approving authority as filed: BIAPPA - Bangalore Airport Area Planning Authority.
Land conversion orders (RERA filing)
| Survey no. | Converted for | Order | By |
|---|---|---|---|
| 66 | Residential | No. 510376, 9 Aug 2023 | Deputy Commissioner Bengaluru Rural District |
RERA does not cover each plot’s khata. Ask the developer for the khata and title documents and have a lawyer check them before paying an advance.
Nisarga Lotus RERA number and registration details
- RERA number
- PRM/KA/RERA/1250/303/PR/170625/007832
- Registered on
- 17 Jun 2025
- Promised completion
- 31 Dec 2026
- Extended to
- No extension recorded
- RERA status
- Completed
- Plots booked
- Not found in public records yet: plots booked
- Price
- Not found in public records yet: price
- Project type
- Plotted
Summary in plain English
Nisarga Lotus is a plotted layout by Nisarga Developers in Ilthore, Devanahalli, with 52 plots. The layout is approved by BIAAPA and registered with Karnataka RERA. Completion is expected by 31 December 2026.
Written by AI from the RERA record above on 7 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, loans, escrow and other details
- Open space
- Not found in public records yet: open space
- Water and power
- Water source filed with RERA: Local Authority
- Plot loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- Canara Bank, SEETHANAYAKANA HALLI
- Building plan (RERA)
- BIAPPA - Bangalore Airport Area Planning Authority · No. LAO/26/2023-24 · dated 30 Jan 2024
- Project cost declared to RERA
- ₹4.41 Cr
Amenities
Nisarga Lotus location and address
- Address
- Converted Sy No.66 of ILTHORE Village , Kundana Hobli Devanahalli Taluk , Devanahalli , Bengaluru Rural, Karnataka - 562110
- Village (RERA)
- Ilthore
- Locality
- Near Bellary Road (Airport Road)Also known as Airport Road, International Airport Road, Bellary Road, NH 44
- PIN code
- 562110
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.22031, 77.64378
Distances to landmarks
Not found in public records yet: landmarksAbout Ilthore
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 6.92 km | approx. 28 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 19.32 km | approx. 78 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 27.8 km | approx. 113 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 28.1 km | approx. 114 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 33.23 km | approx. 135 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 41.28 km | approx. 167 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Nearest metro station and railway
- Doddajala (ದೊಡ್ಡಜಾಲ)Blue Line metro, under construction3.55 km
- Airport City (ವಿಮಾನ ನಿಲ್ದಾಣ ನಗರ)Blue Line metro, under construction5.28 km
- KIAL Terminals (ಕೆಐಎಬಿ ವಿಮಾನ ನಿಲ್ದಾಣ ಟರ್ಮಿನಲ್ಸ್)Blue Line metro, under construction7.88 km
- Peenya (ಪೀಣ್ಯ)Open now — nearest operating metro station24.02 km
- Kempegowda International Airport Halt (ಕೆಂಪೇಗೌಡ ಅಂತರರಾಷ್ಟ್ರೀಯ ವಿಮಾನ-ನಿಲದಾಣ ಹಾಲ್ಟ)Nearest railway station3.67 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 311 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Nisarga Lotus layout plan and plot types as filed
Layout plan and brochure not published? The developer shares them only on request. We’ll get the brochure, layout plan and current price list for you, free.
Get brochure, layout plan & price| Plot type (as filed) | Area | Plots |
|---|---|---|
| 9.14 * 12.19 mtr | — | 29 |
| 12.19 * 18.29 mtr | — | 2 |
| Odd-shaped plots | — | 21 |
Plot types and counts as filed with Karnataka RERA.
We have not collected the layout plan drawing; the developer’s sales team can share it.
Nisarga Lotus completion date and development status
Timeline
- 30 Jan 2024Project start date given to RERA
- 17 Jun 2025Registered with Karnataka RERA
- 22 Feb 2026Promoter applied to RERA for completion
- 31 Dec 2026Completion date given at registration
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Layout plan | BIAPPA - Bangalore Airport Area Planning Authority · No. LAO/26/2023-24 · dated 2024-01-30 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion | Deputy Commissioner Bengaluru Rural District · No. 510376 · dated 2023-08-09 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Change of Land Use | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BIAPPA - Bangalore Airport Area Planning Authority · No. LAO/26/2023-24 · dated 30 Jan 2024
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBNot on RERA yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 4 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Nisarga Lotus RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Nisarga Developers
- Promoter type
- Proprietorship
- Projects on this site
- 1
- RERA complaints against promoter
- 0
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (4 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Nisarga Developers’s RERA recordNisarga Developers delivery record
- 1Projects in Bengaluru on RERA1 approved registration under Nisarga Developers in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 52Plots registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 plots0 complaints ÷ 52 plots in its 1 registration on Karnataka RERA in Bengaluru.
- 1Completion filed on RERARegistrations where the promoter applied to RERA for completion; 0 with an occupancy certificate on RERA.
- 1 of 1Filed by the date given at registrationMedian gap 0 months (on-time ones count as 0). The completion application can come after handover, so this is an upper bound on lateness.
Completion filed on RERA
| Project | Date at registration | Completion filed | Gap |
|---|---|---|---|
| Nisarga Lotus | 31 Dec 2026 | 22 Feb 2026 | By the date |
Measured against the completion date given at registration; many projects had RERA extensions (including the COVID-period extension), shown under the date.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Jan 2024
- 22 Feb 2026Promoter applied to RERA for completion Source (rera.karnataka.gov.in) (opens in a new tab)
- 17 Jun 2025Registered with Karnataka RERA (PRM/KA/RERA/1250/303/PR/170625/007832); completion date 31 Dec 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
- 30 Jan 2024Building plan approved by BIAPPA - Bangalore Airport Area Planning Authority (No. LAO/26/2023-24) Source (rera.karnataka.gov.in) (opens in a new tab)
- 30 Jan 2024Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Plot loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
Nisarga Lotus FAQs
What plot sizes are available in Nisarga Lotus?
The layout has plots of 30×40 ft (1,200 sq ft, 29 plots) and 40×60 ft (2,400 sq ft, 2 plots). There are also 21 odd-sized plots; their individual sizes are not in the RERA record.
How many plots are in Nisarga Lotus?
The project has 52 plots in total.
Who approved the layout for Nisarga Lotus?
The layout was approved by BIAAPA (Bangalore International Airport Area Planning Authority).
What is the RERA registration number for Nisarga Lotus?
The RERA registration number is PRM/KA/RERA/1250/303/PR/170625/007832, registered on 17 June 2025.
When will Nisarga Lotus be completed?
The completion date on RERA is 31 December 2026. The developer applied for completion on 22 February 2026.
How many land conversion orders are there for Nisarga Lotus?
There is 1 land conversion order for this layout.
Are there any RERA complaints on Nisarga Lotus?
No complaints have been filed on this project or against the developer Nisarga Developers.
Where is Nisarga Lotus located?
The project is in Ilthore, Devanahalli taluk, Bengaluru Rural district, PIN 562110.
How many projects does Nisarga Developers have on RERA record?
Nisarga Developers has 4 projects registered with Karnataka RERA in Bengaluru.
Which bank holds the escrow for Nisarga Lotus?
Canara Bank holds the escrow account for this project.
Written by AI from the RERA record above on 7 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Nisarga Lotus
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a plot from Nisarga Developers? Review the developer.
Reviews of Nisarga Developers by verified buyers
No verified reviews of Nisarga Developers yet. If you bought a plot from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the developer may reply.
Similar projects within 5 km
| Project | Distance | Plots | Completion (RERA) | Developed | Complaints | Price |
|---|---|---|---|---|---|---|
| Konig Pearl County 2Konig Homes | 0.8 km | 136 | Dec 2028 | 65% | 0 | Not collected |
| Earthsong By Manyata Phase-5cSquare plots Private limited | 0.9 km | 62 | Dec 2025 | 100% | 0 | Not collected |
| Konig Pearl County 1Konig Homes | 0.9 km | 74 | Dec 2028 | 60% | 0 | Not collected |
| Konig Marvel CountyKonig Estates | 1.5 km | 115 | May 2030 | 5% | 0 | Not collected |
| Serene GardensContinental Builders And Developers | 2.1 km | 108 | Sep 2023 | — | 0 | Not collected |
| Aurum ValleyBangarukadiyala Syed Munaf | 2.3 km | 43 | Dec 2026 | 100% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the developer’s own website where we found one.
Sources and last checked dates
Collected on 4 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1250/303/PR/170625/007832.
- RERA record last checked: 4 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 17 Jun 2025
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the developer’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects nearby
Ilthore, near Bellary Road (Airport Road)Under constructionRERA registeredBuyers’ group openEarthsong By Manyata Phase-5c
by Square plots
Price: Price on requestGet brochure & price →
- 30×40, 30×50, 40×50 +1 more
- 988 – 3,127 sq ft plots
- Approved by BIAAPA
- Dec 2025
RERA not updated since promised Dec 2025 · 62 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Earthsong By Manyata Phase-5c
Sadahalli, near Bellary Road (Airport Road)Under constructionRERA registeredBuyers’ group openKonig Pearl County 2
by Konig Homes
Price: Price on requestGet brochure & price →
- 30×40, 40×40, 30×60 +2 more
- 1,163 – 4,917 sq ft plots
- Approved by BIAAPA
- Dec 2028
136 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Konig Pearl County 2
Sadahalli, near Bellary Road (Airport Road)Under constructionRERA registeredBuyers’ group openKonig Pearl County 1
by Konig Homes
Price: Price on requestGet brochure & price →
- 30×40, 30×50, 40×40 +1 more
- 1,158 – 42,214 sq ft plots
- Approved by BIAAPA
- Dec 2028
74 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Konig Pearl County 1