Skip to content
Log in

Nitesh Napa Valley

3 & 4 BHK apartments by True-Blue Realty Private Limited · Vadeyarapura, Bellary Road (Airport Road), Bengaluru

Vadeyarapura, Bellary Road (Airport Road), BengaluruOpen on Google Maps (opens in a new tab)

  • Under construction
  • RERA registered
  • RERA not updated: completion promised Dec 2025; no extension or completion filed
  • residential

by True-Blue Realty Private Limited

Price: Price on request

Get brochure, floor plans & price

Brochure, floor plans and price list for Nitesh Napa Valley

Builders share their brochure, floor plans and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Project summary

Nitesh Napa Valley is a residential project by True-Blue Realty Private Limited in Vadeyarapura, Bengaluru with 209 homes, registered with Karnataka RERA. The completion date on RERA is 31 Dec 2025.

Facts collected on 12 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.

Nitesh Napa Valley buyers’ group: join to ask for a group price

No one has joined yet. Be one of the first 10 buyers in this group — the founding members.

Join free. When enough buyers have joined, our agent partner asks True-Blue Realty Private Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.

  1. Gathering buyers
  2. Talking to the builder
  3. Group offer
  4. Group site visit
  5. Booking

0 buyers have joined · 0 committed

Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.

Join the Nitesh Napa Valley buyers’ groupHow group buying works

See it for yourself

Visit the site with our team, or get a call to clear your questions. Free, no obligation.

Key facts: home types, towers, land and possession

Updated on 12 Oct 2026
Home types
3 BHK, 4 BHK, Villa
Carpet area
308 – 27,755 sq ft
Towers
4
Floors
Not found in public records yet: floors
Total homes
209
Land
20.12 acres
Possession (extended)
Dec 2025
Built (RERA update)
99%

Nitesh Napa Valley RERA number and registration details

RERA number
TOR/PRM/KA/RERA/1251/309/PR/211028/002104
Registered on
28 Oct 2021
Promised completion
31 Mar 2021
Extended to
31 Dec 2025
RERA status
Under construction
Homes booked
130 of 209 as on
Price
Not found in public records yet: price
Project type
Residential

Towers and blocks (RERA filing)

TowerFloorsBasementsHomes
Block A ( G+2 Floor ) A Type Villas0025
Block B ( G+2 Floor ) B Type Villas0086
Block C ( G+2 Floor ) C Type Villas0022
Club House001

A dash (—) means the filing did not state that value.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Summary in plain English

Nitesh Napa Valley is a residential project by True-Blue Realty Private Limited in Vadeyarapura, Bengaluru North, with 209 homes across 4 towers. The project includes 75 villas, 111 4 BHK homes, 22 3 BHK homes, and 1 club house, with a completion date of 31 December 2025 on RERA.

Written by AI from the RERA record above on 5 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.

Open space, home loans, escrow and other details

Open space
74% of land
Water and power
Not found in public records yet: water and power
Home loans: approved banks
Not found in public records yet: bank approvals
Payment plans
Not found in public records yet: payment plans
Maintenance
Not found in public records yet: maintenance
Car parking
Not found in public records yet: car parking charge
Escrow bank (RERA)
Axis Bank, Hegde Nagar, Bangalore
Project cost declared to RERA
₹279 Cr

Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Amenities

Not found in public records yet: amenities

Nitesh Napa Valley location and address

Address
NITTE Meenakshi College Road Off Bellary Road near Ryan International School, Vadeyarapura Village Yelahanka
Village (RERA)
Vadeyarapura
Locality
Bellary Road (Airport Road)Also known as Airport Road, International Airport Road, Bellary Road, NH 44
PIN code
560020
City
Bengaluru
State
Karnataka
Coordinates
13.12078, 77.60320

Distances to landmarks

Not found in public records yet: landmarks

About Bellary Road (Airport Road)

Not found in public records yet: locality facts

Commute times to tech parks and the airport

As on 5 Oct 2026
ToStraight linePeak-hour drive (estimate)
Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab)8.28 kmapprox. 34 min
Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab)14.11 kmapprox. 57 min
KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab)16.27 kmapprox. 66 min
ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab)20.78 kmapprox. 84 min
Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab)23.49 kmapprox. 95 min
Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab)30.88 kmapprox. 125 min
How we calculate

Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.

Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.

Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this

Schools and hospitals nearby

As on 5 Oct 2026

Within 2 km

  • 29Schools and colleges7 schools, 21 colleges, 1 kindergartens
  • 15Hospitals and clinics8 hospitals, 7 clinics

Nearest schools and colleges

  • Ryan International School · 0.4 km
  • Chrysalis High School · 0.41 km
  • MVM Institute of Nursing Sciences · 0.93 km

Nearest hospitals and clinics

  • CyteCare · 0.56 km
  • Brains Hospital · 0.59 km
  • Ganga ENT Clinic · 1 km

Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Nearest metro station and railway

As on 5 Oct 2026
  • Bagalur Cross (ಬಾಗಲೂರು ಕ್ರಾಸ್)Blue Line metro, under construction0.73 km
  • Yelahanka (ಯಲಹಂಕ)Blue Line metro, under construction2.13 km
  • Jakkur Cross (ಜಕ್ಕೂರು ಅಡ್ಡ)Blue Line metro, under construction5.75 km
  • Yeshwantpur (ಯಶವಂತಪುರ)Open now — nearest operating metro station12.29 km
  • Yelahanka Junction (ಯಲಹಂಕ ಜಂಕ್ಷನ್)Nearest railway station2.14 km

Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Lines under construction near here

  • 6 Aug 2026Namma Metro Blue Line, Phase 2B (KR Pura – Hebbal – Yelahanka – Kempegowda Airport, 38.44 km). Under construction; reported 72% complete overall, with the remaining work targeted for June 2027 and phased opening through 2027. Nearest: Bagalur Cross, about 0.73 km straight-line. — Business Today. News report quoting BMRCL; the airport line has slipped before. Read (businesstoday.in) (opens in a new tab)

Sources:Source (businesstoday.in) (opens in a new tab)Source (openstreetmap.org) (opens in a new tab)

Lake and lake-buffer check

As on 5 Oct 2026

The nearest mapped lake is Yelahanka Lake, 795 m from the project’s RERA map point.

The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.

The buffer rule

Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.

Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this

Satellite time-lapse of the site

Satellite photos load when you scroll to them.

Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.

Sources:Source (livingatlas.arcgis.com) (opens in a new tab)

Nitesh Napa Valley home types and carpet areas

Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.

Get brochure, floor plans & price

Brochure, floor plans and price list for Nitesh Napa Valley

Builders share their brochure, floor plans and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Home typeCarpet areaHomes
3 BHK2,203 sq ft22
4 BHK308 – 405 sq ft111
Club house27,755 sq ft1
Villas4,182 sq ft75

Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).

We have not collected floor-plan drawings; the builder’s sales team can share them.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Nitesh Napa Valley possession date and construction status

  • Whole project (promoter’s RERA update)99%

    as on · 130 of 209 homes booked

Promoter’s quarterly update to RERA for Q3 2025-26, submitted 2026-01-16.

By tower (Q3 2025-26)

  • Block A ( G+2 Floor ) A Type Villas100%
  • Block B ( G+2 Floor ) B Type Villas100%
  • Block C ( G+2 Floor ) C Type Villas100%
  • Club House100%

Units sold and unsold, from RERA (Q3 2025-26)

TypeHomesBookedAvailable
4 BHK1111083
3 BHK22220
CLUB HOUSE101

As reported by the promoter in the quarterly update to RERA, not verified by us.

Timeline

  1. 7 Mar 2013Project start date given to RERA
  2. 31 Mar 2021Completion date given at registration
  3. 30 Sep 2021Covid Extension: completion date moved to this date
  4. 28 Oct 2021Registered with Karnataka RERA
  5. 29 Dec 2022Section 6 Extension: completion date moved to this date
  6. 31 Dec 2025Further Extension: completion date moved to this date

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Construction pace from RERA quarterly filings

As on 16 Jan 2026

At the average pace so far, construction would reach 100% around Feb 2026 — about 2 months after the completion date on RERA (31 Dec 2025).

0%25%50%75%100%2014201620182020202220242026RERA date99%
  • Filed on RERA
  • Average pace since start
  • RERA completion date

Quarterly filings

QuarterFiled onBuiltHomes booked
Q3 2025-26to 31 Dec 202516 Jan 202699%130 of 134
How we calculate

Average pace = % built ÷ months since the start date in the RERA record. Here: 99% ÷ 153.8 months (7 Mar 2013 to 31 Dec 2025) = 0.6% a month.

Estimated finish = latest filing date + (100 − % built) ÷ pace = 31 Dec 2025 + 1 ÷ 0.6 = 1.6 months → Feb 2026. This is an estimate, not a date from the builder or RERA.

A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q3 2025-26, submitted 2026-01-16.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

Approvals and documents checklist

ApprovalAuthoritySource
Building planBBMP - Bruhat Bengaluru Mahanagara PalikeSource (rera.karnataka.gov.in) (opens in a new tab)

Documents uploaded to RERA

As on 12 Oct 2026
  • Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Commencement certificate · Permission to start buildingNot on RERA yet
  • Environment clearance · SEIAA KarnatakaNot on RERA yet
  • Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
  • Pollution board consent · KSPCBNot on RERA yet
  • Water and sewerage · BWSSBNot on RERA yet
  • Electricity · BESCOMNot on RERA yet
  • Height clearance · Airports Authority of IndiaNot on RERA yet
  • Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion

From the documents the promoter uploaded to Karnataka RERA, collected 12 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Nitesh Napa Valley RERA complaints

No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)

Court and consumer cases

Not found in public records yet: court cases

We list case numbers, courts and outcomes only — never names of private individuals.

About True-Blue Realty Private Limited

Promoter type
Company
Projects on this site
1
RERA complaints against promoter
0
Company number (CIN)
U45202KA2020PTC132034

From Karnataka RERA, as collected so far (12 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.

True-Blue Realty Private Limited’s RERA record

True-Blue Realty Private Limited delivery record

As on 12 Oct 2026

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

What’s changed since Mar 2013

As on 12 Oct 2026
  1. 16 Jan 2026Quarterly update filed for Q3 2025-26: 99% built, 130 of 134 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  2. 31 Dec 2025Completion date extended to 31 Dec 2025 Source (rera.karnataka.gov.in) (opens in a new tab)
  3. 28 Oct 2021Registered with Karnataka RERA (TOR/PRM/KA/RERA/1251/309/PR/211028/002104); completion date 31 Mar 2021 Source (rera.karnataka.gov.in) (opens in a new tab)
  4. 7 Mar 2013Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)

Newest first. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.

Home loan EMI calculator

No listed price found — enter one to try.

Example only — use your bank’s quote.

Monthly EMI
—
Down payment
—
Loan amount
—
Total interest
—

A calculation only, from the numbers you enter — not a loan offer.

All-in cost: GST, registration and other charges

The calculator loads when you scroll to it.

Assumptions
  • Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
  • GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
  • Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
  • Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
  • Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.

How we calculate this

Nitesh Napa Valley FAQs

What is the completion date for Nitesh Napa Valley?

The RERA completion date is 31 December 2025. The project has received three extensions: a Covid Extension to 30 September 2021, a Section 6 Extension to 29 December 2022, and a Further Extension to 31 December 2025.

How many homes are in Nitesh Napa Valley?

The project has 209 homes: 75 villas, 111 4 BHK apartments, 22 3 BHK apartments, and 1 club house.

What are the carpet areas for homes in Nitesh Napa Valley?

Villas have a carpet area of 4,182 sq ft. 4 BHK homes range from 308 to 405 sq ft carpet area. 3 BHK homes have a carpet area of 2,203 sq ft. The club house is 27,755 sq ft.

When was Nitesh Napa Valley registered on RERA?

The project was registered on 28 October 2021.

What is the location of Nitesh Napa Valley?

The project is in Vadeyarapura, Bengaluru North taluk, Bengaluru Urban district, with PIN code 560020.

How many homes have been booked in Nitesh Napa Valley?

As of Q3 2025-26 (quarter ended 31 December 2025), 130 homes have been booked and 134 homes are in the booking table.

What is the construction progress of Nitesh Napa Valley?

As of Q3 2025-26 (quarter ended 31 December 2025), the project is 99% complete.

Are there any RERA complaints against Nitesh Napa Valley or the builder?

There are no RERA complaints on this project registration and no RERA complaints against the builder True-Blue Realty Private Limited on any of their projects.

How many towers does Nitesh Napa Valley have?

The project has 4 towers.

What is the land area of Nitesh Napa Valley?

The land area is 81,442 sq m.

Written by AI from the RERA record above on 5 Oct 2026. Answers use only that record; check them against the source before you decide.

Questions about Nitesh Napa Valley

No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.

Bought a home from True-Blue Realty Private Limited? Review the builder.

Reviews of True-Blue Realty Private Limited by verified buyers

No verified reviews of True-Blue Realty Private Limited yet. If you bought a home from them, your review helps other buyers.

How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.

Similar projects within 5 km

ProjectDistanceHomesPossession (RERA)BuiltComplaintsPrice
Warrior Central BayY V Constructions0.7 km80Oct 2026extended100%0Not collected
SLV Golden TowersSLV Developers Pvt Ltd0.7 km242Apr 202921%0Not collected
Brigade InsigniaBrigade Enterprises Ltd1.2 km379Jun 202976%1from ₹3.99 Crabout ₹25,700/sq ft carpet
New warrior towerM D B Constructions1.5 km52Oct 2025—0Not collected
Salarpuria-Sattva ExoticSattva Resi Private Limited1.8 km552Aug 2024extended—8Not collected
Shashank AkshayaM/s. SHASHANK INFRA PROJECTS1.9 km112Apr 202799%0Not collected

Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sources and last checked dates

  1. Karnataka RERA — project register (search by the registration number) (opens in a new tab)

Collected on 12 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.

How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: TOR/PRM/KA/RERA/1251/309/PR/211028/002104.

  • RERA record last checked: 12 Oct 2026
  • Last change in the record (registration, quarterly filing or complaint): 16 Jan 2026

How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error

More new projects in Bellary Road (Airport Road)

  • Salarpuria-Sattva Exotic: Indoor Tennis Court (artist’s impression)both Kattigenahalli, Bellary Road (Airport Road)Artist’s impressionUnder constructionRERA registeredBuyers’ group open

    Salarpuria-Sattva Exotic

    by Sattva Resi

    Price: Price on requestGet brochure & price →

    • 2 BHK, 3 BHK, 4 BHK
    • 881 – 1,548 sq ft
    • Aug 2024 (extended)

    RERA not updated since promised Aug 2024 · 552 homes · 8 RERA complaints

    Be one of the first 10 buyers in this groupFounding members — it’s free

    Join group for Salarpuria-Sattva Exotic
  • TNM Lakeview: Site photo filed with Karnataka RERAKattigenahalli, Bellary Road (Airport Road)Under constructionRERA registeredBuyers’ group open

    TNM Lakeview

    by Y V Constructions

    Price: Price on requestGet brochure & price →

    • 2 BHK, 3 BHK
    • 604 – 996 sq ft
    • Oct 2026 (extended)

    36 homes

    Be one of the first 10 buyers in this groupFounding members — it’s free

    Join group for TNM Lakeview
  • Riviera Glade: Site photo filed with Karnataka RERABettahalasuru, Bellary Road (Airport Road)Under constructionRERA registeredBuyers’ group open

    Riviera Glade

    by Goyal Hariyana Infrastructures

    Price: Price on requestGet brochure & price →

    • 4 BHK
    • 2,305 – 2,558 sq ft
    • Dec 2030

    112 homes

    Be one of the first 10 buyers in this groupFounding members — it’s free

    Join group for Riviera Glade