Rain Forest Phase I
35×45, 33×48 +4 more plots by Maniveera Structure Private Limited · Hegganahalli, Devanahalli, Bengaluru
Hegganahalli, Devanahalli, BengaluruOpen on Google Maps (opens in a new tab)
- Completion filed with RERA
- RERA registered
- plotted
Plots still available: 289 of 299 plots were unsold when the developer filed completion with RERA (27 Mar 2026). Some may have sold since — join the group and we’ll ask the developer what is left and for a group price.
by Maniveera Structure Private Limited
Price: Price on request
Rain Forest Phase I at a glance
- Completion (RERA)Dec 2020 ExtendedWas Dec 2019 · Karnataka RERA
- RERA complaints (project)11 complaintsKarnataka RERA · as on 4 Oct 2026
- Approvals filed1 of 9 on RERAKarnataka RERA uploads · 4 Oct 2026
- Nearest metroDoddajala · 4.82 km (under construction)Open now: Dasarahalli, 20.91 km · straight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 44 min at peak10.79 km straight line · estimate
- Nearest lakeUnnamed lake · 648 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Rain Forest Phase I is a plotted development by Maniveera Structure Private Limited in Hegganahalli, Bengaluru with 299 plots, registered with Karnataka RERA. The completion date on RERA is 30 Dec 2020.
Facts collected on 4 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the developer pays us a commission.
Rain Forest Phase I buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Maniveera Structure Private Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the developer offers and book directly with the developer if you want to. Free for buyers. If you book through us, the developer pays us a commission.
- Gathering buyers
- Talking to the developer
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, plot size and timeline with us on a call; developers negotiate with them. Joining is free and never obliges you to buy.
Join the Rain Forest Phase I buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: plot sizes, approval, land and completion
- Plot sizes (feet)
- 35×45, 33×48, 35×50, 40×45 +2 more
- Plot area
- 11,560 – 1,71,824 sq ft
- Total plots
- 299
- Layout approved by
- BIAAPA
- Land
- 27.28 acres
- Land conversion orders
- None listed
- Completion (extended)
- Dec 2020
- Development (RERA update)
- Not found in public records yet: development progress
Plot sizes (RERA filing)
| Size (feet) | Area | Plots |
|---|---|---|
| 35×45 | 1,575 sq ft | 40 |
| 33×48 | 1,584 sq ft | 11 |
| 35×50 | 1,750 sq ft | 9 |
| 40×45 | 1,800 sq ft | 4 |
| 40×50 | 2,000 sq ft | 90 |
| 40×60 | 2,400 sq ft | 59 |
| Odd-sized (irregular) | varies | 77 |
| Commercial | — | 9 |
Sizes as filed with RERA, converted from metres to feet (9.14 m = 30 ft, 12.19 m = 40 ft). Ask the developer which plots are still unsold.
Approving authority as filed: BIAPPA - Bangalore Airport Area Planning Authority.
Rain Forest Phase I RERA number and registration details
- RERA number
- PRM/KA/RERA/1250/303/PR/180728/001952
- Registered on
- 28 Jul 2018
- Promised completion
- 31 Dec 2019
- Extended to
- 30 Dec 2020
- RERA status
- Completed
- Plots booked
- Not found in public records yet: plots booked
- Price
- Not found in public records yet: price
- Project type
- Plotted
Summary in plain English
Rain Forest Phase I is a plotted layout by Maniveera Structure Private Limited in Hegganahalli, Devanahalli, comprising 299 plots approved by BIAAPA. The project was registered with Karnataka RERA in July 2018 with a completion date of 30 December 2020.
Written by AI from the RERA record above on 7 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, loans, escrow and other details
- Open space
- 45.6% of land
- Water and power
- Not found in public records yet: water and power
- Plot loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- HDFC, Kasturba Road, Bangalore
- Project cost declared to RERA
- ₹127 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
Rain Forest Phase I location and address
- Address
- Sy.No.63, 89, 90, 91, 92/1, 92/2 and 93, Situated at Hegganahalli Village, Kundana Hobali, , Devanahalli Taluk, Bangalore Rural District.
- Village (RERA)
- Hegganahalli
- Locality
- Devanahalli
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.20835, 77.60508
Distances to landmarks
Not found in public records yet: landmarksAbout Devanahalli
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 10.79 km | approx. 44 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 17.89 km | approx. 72 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 25.88 km | approx. 105 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 28.44 km | approx. 115 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 32.71 km | approx. 132 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 40.41 km | approx. 164 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 3Schools and colleges1 schools, 2 colleges, 0 kindergartens
- 0Hospitals and clinics0 hospitals, 0 clinics
Nearest schools and colleges
- Vidyashilp University · 0.85 km
- Embassy Academy · 1.25 km
- M S Engineering College · 1.93 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Doddajala (ದೊಡ್ಡಜಾಲ)Blue Line metro, under construction4.82 km
- Airport City (ವಿಮಾನ ನಿಲ್ದಾಣ ನಗರ)Blue Line metro, under construction8.94 km
- Bagalur Cross (ಬಾಗಲೂರು ಕ್ರಾಸ್)Blue Line metro, under construction9.91 km
- Dasarahalli (ದಾಸರಹಳ್ಳಿ)Open now — nearest operating metro station20.91 km
- Betta Halasuru (ಬೆಟ್ಟಹಲಸೂರು)Nearest railway station4.7 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 648 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 648 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,072 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,646 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Rain Forest Phase I layout plan and plot types as filed
Layout plan and brochure not published? The developer shares them only on request. We’ll get the brochure, layout plan and current price list for you, free.
Get brochure, layout plan & price| Plot type (as filed) | Area | Plots |
|---|---|---|
| Plot 9.92 m × 14.75 m | 1,575 sq ft | 11 |
| Plot 10.67 m × 13.72 m | 1,576 sq ft | 40 |
| Plot 10.67 m × 14.96 m | 1,719 sq ft | 9 |
| Plot 12.00 m × 18.00 m | 2,325 sq ft | 50 |
| Plot 12.00 m × 18.49 m | 2,388 sq ft | 9 |
| Plot 12.19 m × 13.72 m | 1,800 sq ft | 4 |
| Plot 12.19 m × 15.24 m | 2,000 sq ft | 90 |
| Commercial | 2,940 sq ft | 9 |
| Odd-shaped plots | 2,590 sq ft | 77 |
Plot types and counts as filed with Karnataka RERA.
We have not collected the layout plan drawing; the developer’s sales team can share it.
Rain Forest Phase I completion date and development status
Timeline
- 1 Jul 2018Project start date given to RERA
- 28 Jul 2018Registered with Karnataka RERA
- 31 Dec 2019Completion date given at registration
- 30 Jun 2020Section 6 Extension: completion date moved to this date
- 30 Dec 2020Covid Extension: completion date moved to this date
- 27 Mar 2026Promoter applied to RERA for completion
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Layout plan | BIAPPA - Bangalore Airport Area Planning Authority | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Commencement certificate · Permission to start buildingNot on RERA yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBNot on RERA yet
- Water and sewerage · BWSSBNot on RERA yet
- Electricity · BESCOMNot on RERA yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 4 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Rain Forest Phase I RERA complaints and orders
11 complaints as on Source (rera.karnataka.gov.in) (opens in a new tab)
11 rows: rera complaints. Scroll inside the table to see them all.
| Complaint ref | Filed | Subject | Status | Source |
|---|---|---|---|---|
| 00445/2026 | 23 Apr 2026 | To handover of plot and to pay interest on delay period. | Posted for orders | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00563/2024 | 11 Jun 2024 | Breach of Agreement and Cancel RERA registration of the Rain Forest Property under RERA Act, 2016, under Section 14(1)&(2) | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/210918/0008352 | 18 Sep 2021 | Sale under false pretense | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/210817/0008250 | 17 Aug 2021 | Booking amount not refunded despite legal issues in project | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/210713/0008128 | 13 Jul 2021 | Refund of booking amount | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/210406/0007864 | 6 Apr 2021 | Requesting for booking amount refund | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/210401/0007856 | 1 Apr 2021 | Refund of Booking amount Rs. 1,00,000/- | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/201026/0006962 | 26 Oct 2020 | Misleading advertisement, Change of plans without buyer intimation, non-disclosure of litigation at time of booking and other issues | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/201026/0006961 | 26 Oct 2020 | Vijay Pamarathi | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/201021/0006933 | 21 Oct 2020 | Layout Changes without buyers consent, Locking buyers with ROFR | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/201020/0006920 | 20 Oct 2020 | Layout Changes without buyers awareness/consent | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Maniveera Structure Private Limited
- Promoter type
- Company
- Projects on this site
- 1
- RERA complaints against promoter
- 11
- Company number (CIN)
- U45205KA2014PTC075948
From Karnataka RERA, as collected so far (4 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Maniveera Structure Private Limited’s RERA recordManiveera Structure Private Limited delivery record
- 1Projects in Bengaluru on RERA1 approved registration under Maniveera Structure Private Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 299Plots registeredAs stated in each registrations.
- 11RERA complaints1 open, 10 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 36.8Complaints per 1,000 plots11 complaints ÷ 299 plots in its 1 registration on Karnataka RERA in Bengaluru.
- 1Completion filed on RERARegistrations where the promoter applied to RERA for completion; 0 with an occupancy certificate on RERA.
- 0 of 1Filed by the date given at registrationMedian gap 74.8 months (on-time ones count as 0). The completion application can come after handover, so this is an upper bound on lateness.
What the complaints are about
11 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Completion filed on RERA
| Project | Date at registration | Completion filed | Gap |
|---|---|---|---|
| Rain Forest Phase I | 31 Dec 2019extended to 30 Dec 2020 | 27 Mar 2026 | 75 months after |
Measured against the completion date given at registration; many projects had RERA extensions (including the COVID-period extension), shown under the date.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Jul 2018
- 23 Apr 2026Complaint 00445/2026 filed with RERA: “To handover of plot and to pay interest on delay period.” — now posted for orders Source (rera.karnataka.gov.in) (opens in a new tab)
- 27 Mar 2026Promoter applied to RERA for completion Source (rera.karnataka.gov.in) (opens in a new tab)
- 11 Jun 2024Complaint 00563/2024 filed with RERA: “Breach of Agreement and Cancel RERA registration of the Rain Forest Property under RERA Act, 2016, under Section 14(1)&(2)” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 18 Sep 2021Complaint CMP/210918/0008352 filed with RERA: “Sale under false pretense” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 17 Aug 2021Complaint CMP/210817/0008250 filed with RERA: “Booking amount not refunded despite legal issues in project” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 13 Jul 2021Complaint CMP/210713/0008128 filed with RERA: “Refund of booking amount” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 6 Apr 2021Complaint CMP/210406/0007864 filed with RERA: “Requesting for booking amount refund” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Apr 2021Complaint CMP/210401/0007856 filed with RERA: “Refund of Booking amount Rs. 1,00,000/-” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 30 Dec 2020Completion date extended to 30 Dec 2020 Source (rera.karnataka.gov.in) (opens in a new tab)
- 26 Oct 2020Complaint CMP/201026/0006962 filed with RERA: “Misleading advertisement, Change of plans without buyer intimation, non-disclosure of litigation at time of booking and other issues” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 26 Oct 2020Complaint CMP/201026/0006961 filed with RERA: “Vijay Pamarathi” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 21 Oct 2020Complaint CMP/201021/0006933 filed with RERA: “Layout Changes without buyers consent, Locking buyers with ROFR” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 20 Oct 2020Complaint CMP/201020/0006920 filed with RERA: “Layout Changes without buyers awareness/consent” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 28 Jul 2018Registered with Karnataka RERA (PRM/KA/RERA/1250/303/PR/180728/001952); completion date 31 Dec 2019 Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Jul 2018Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Plot loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
Rain Forest Phase I FAQs
What plot sizes are available in Rain Forest Phase I?
The project has plots in sizes 40×50 feet (2,000 sq ft), 40×60 feet (2,400 sq ft), 35×45 feet (1,575 sq ft), 33×48 feet (1,584 sq ft), 35×50 feet (1,750 sq ft), and 40×45 feet (1,800 sq ft). There are also 77 odd-sized plots and 9 commercial plots.
How many plots are in Rain Forest Phase I?
The project has 299 plots in total, including 9 commercial plots.
Who approved the layout for Rain Forest Phase I?
The layout was approved by BIAAPA (Bangalore International Airport Area Planning Authority).
What is the RERA registration number for Rain Forest Phase I?
The project is registered with Karnataka RERA under registration number PRM/KA/RERA/1250/303/PR/180728/001952.
When is Rain Forest Phase I scheduled for completion?
The current completion date on RERA is 30 December 2020. The project has applied for a further extension with an applied completion date of 27 March 2026.
What extensions have been granted for Rain Forest Phase I?
Two extensions have been recorded: a Covid Extension and a Section 6 Extension to 30 June 2020.
Are there any RERA complaints filed against Rain Forest Phase I?
11 complaints have been filed against the project on RERA.
Where is Rain Forest Phase I located?
The project is in Hegganahalli, Devanahalli taluk, Bengaluru Rural district.
What is the developer's track record with RERA?
Maniveera Structure Private Limited has 11 complaints registered against it across all its projects, and Rain Forest Phase I is the only project by this developer in the Bengaluru RERA records.
Which bank holds the escrow account for Rain Forest Phase I?
HDFC is the escrow bank for the project.
Written by AI from the RERA record above on 7 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Rain Forest Phase I
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a plot from Maniveera Structure Private Limited? Review the developer.
Reviews of Maniveera Structure Private Limited by verified buyers
No verified reviews of Maniveera Structure Private Limited yet. If you bought a plot from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the developer may reply.
Similar projects within 5 km
| Project | Distance | Plots | Completion (RERA) | Developed | Complaints | Price |
|---|---|---|---|---|---|---|
| Adarsh Savana Phase 2Alekhya Property Developments Pvt Ltd. | 0.2 km | 210 | Jun 2029 | — | 0 | Not collected |
| Prestige Autumn LeavesPrestige Estates Projects Ltd | 0.6 km | 240 | Mar 2027 | 47% | 1 | Not collected |
| Green Woods Gardens Extension-3aTelecom Employees Co-Operative Housing Society Ltd | 0.9 km | 21 | Dec 2028 | — | 0 | Not collected |
| Vaishnavi At-One Life IVVAISHNAVI AT-ONE LIFE PARK LLP and AT-ONE ESTATES Private Limited | 1.1 km | 227 | Dec 2027 | 90% | 0 | Not collected |
| Fortius Good EarthRS-GK Real Estates LLP | 1.1 km | 63 | Dec 2027 | 40% | 0 | Not collected |
| Embassy ParadisoEmbassy Developments Limited | 1.3 km | 48 | Aug 2027 | 100% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the developer’s own website where we found one.
Sources and last checked dates
Collected on 4 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1250/303/PR/180728/001952.
- RERA record last checked: 4 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 23 Apr 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the developer’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Devanahalli
- Bettanahaali, DevanahalliUnder constructionRERA registeredBuyers’ group open
Adarsh Savana Phase 2
by Alekhya Property Developments
Price: Price on requestGet brochure & price →
- 30×40, 30×50, 40×40 +3 more
- 895 – 8,028 sq ft plots
- Approved by BIAAPA
- Jun 2029
210 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Adarsh Savana Phase 2
Hegganahalli, DevanahalliUnder constructionRERA registeredBuyers’ group openPrestige Autumn Leaves
by Prestige Estates
Price: Price on requestGet brochure & price →
- 30×45, 40×60, 50×60 +2 more
- 1,196 – 5,641 sq ft plots
- Approved by BIAAPA
- Mar 2027
240 plots · 1 RERA complaint
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Prestige Autumn Leaves
Bettanahalli, DevanahalliUnder constructionRERA registeredBuyers’ group openGreen Woods Gardens Extension-3a
by Telecom Employees Co-Operative Housing Society
Price: Price on requestGet brochure & price →
- 30×40
- 857 – 2,018 sq ft plots
- Approved by BIAAPA
- Dec 2028
21 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Green Woods Gardens Extension-3a