Rainbow Mayfair
4 & 5 BHK apartments by MR Infraa · Hullahalli, near Begur Road, Bengaluru
Hullahalli, near Begur Road, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
by MR Infraa
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Rainbow Mayfair at a glance
- Possession (RERA)Jan 2030Karnataka RERA
- Construction27% built · on pace for Jan 2031 11 mo after RERA dateRERA filing to 30 Sep 2026; estimate from average pace
- Homes booked13 of 62 (21%)RERA update · as on 30 Sep 2026
- RERA complaints (project)None listedKarnataka RERA · as on 20 Oct 2026
- Approvals filed6 of 9 on RERAKarnataka RERA uploads · 20 Oct 2026
- Nearest metroKalena Agrahara · 4.68 km (under construction)Open now: Beratena Agrahara, 5.21 km · straight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 168 min at peak41.5 km straight line · estimate
- Nearest lakeUnnamed lake · 101 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Rainbow Mayfair is a residential project by MR Infraa in Hullahalli, Bengaluru with 62 homes, registered with Karnataka RERA. The completion date on RERA is 31 Jan 2030.
Facts collected on 20 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Rainbow Mayfair buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks MR Infraa for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Rainbow Mayfair buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 4 BHK, 5 BHK
- Carpet area
- 3,000 – 3,663 sq ft
- Towers
- 1
- Floors
- 4
- Total homes
- 62
- Land
- 3.73 acres
- Possession (RERA)
- Jan 2030
- Built (RERA update)
- 27%
Rainbow Mayfair RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/308/PR/190325/007593
- Registered on
- 19 Mar 2025
- Promised completion
- 31 Jan 2030
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- 13 of 62 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| RAINBOW MAYFAIR | 4 | 0 | 62 |
A dash (—) means the filing did not state that value.
Summary in plain English
Rainbow Mayfair is a residential project by MR Infraa in Hullahalli, Anekal, with 62 homes across one 4-storey tower. The project is registered with Karnataka RERA and has a completion date of 31 January 2030.
Written by AI from the RERA record above on 20 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 50.2% of land
- Water and power
- Water source filed with RERA: Local Authority
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- HDFC, J P NAGAR
- Building plan (RERA)
- BDA - Bangalore Development Authority · No. 115/2024-25 · dated 31 Dec 2024
- Project cost declared to RERA
- ₹181 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- Club House
- Swimming Pool
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Rainbow Mayfair location and address
- Address
- SY NO 41/4, AND SY NO 43/1, , HULLAHALLI VILLAGE, JIGANI HOBLI , Anekal , Bengaluru Urban, Karnataka - 560083
- Village (RERA)
- Hullahalli
- Locality
- Near Begur RoadAlso known as Begur, Begur Main Road, Begur Koppa Road
- PIN code
- 560083
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.83700, 77.61851
Distances to landmarks
Not found in public records yet: landmarksAbout Hullahalli
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 5.23 km | approx. 21 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 11.8 km | approx. 48 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 16.57 km | approx. 67 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 21.16 km | approx. 86 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 23.48 km | approx. 95 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 41.5 km | approx. 168 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 10Schools and colleges8 schools, 2 colleges, 0 kindergartens
- 0Hospitals and clinics0 hospitals, 0 clinics
Nearest schools and colleges
- Preethidhama, Begur · 0.15 km
- Christ Academy ICSE School · 1.4 km
- GHPS Bettadasana Pura · 1.42 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Kalena Agrahara (ಕಾಳೇನ ಅಗ್ರಹಾರ)Pink Line metro, under construction4.68 km
- Beratena Agrahara (ಬೆರಟೇನ ಅಗ್ರಹಾರ)Open now — nearest operating metro station5.21 km
- Huskuru (ಹುಸ್ಕೂರ್)Nearest railway station10.29 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 101 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 101 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 702 m
- Hommadevanahalli Lake on OpenStreetMap (opens in a new tab) 769 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Rainbow Mayfair floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Brochure15 pages

BrochureFull PDF on RERA 






Approved building plan

Approved Building PlanFull PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 4 BHK | 3,000 – 3,179 sq ft | 48 |
| 5 BHK | 3,574 – 3,663 sq ft | 14 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Rainbow Mayfair possession date and construction status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
Units sold and unsold, from RERA (Q2 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 4 BHK | 48 | 12 | 36 |
| 5 BHK | 14 | 1 | 13 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 1 Mar 2025Project start date given to RERA
- 19 Mar 2025Registered with Karnataka RERA
- 31 Jan 2030Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Jan 2031 — about 11 months after the completion date on RERA (31 Jan 2030).
At the pace between the 4 quarterly filings we have (15% → 27% in 9 months), it would be around Apr 2031 — about 15 months after the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 15 Oct 2026 | 27% | 13 of 62 |
| Q1 2026-27to 30 Jun 2026 | 15 Jul 2026 | 23% | 12 of 62 |
| Q4 2025-26to 31 Mar 2026 | 15 Apr 2026 | 20% | 9 of 62 |
| Q3 2025-26to 31 Dec 2025 | 13 Jan 2026 | 15% | 7 of 62 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 27% ÷ 19 months (1 Mar 2025 to 30 Sep 2026) = 1.4% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 73 ÷ 1.4 = 51.3 months → Jan 2031. This is an estimate, not a date from the builder or RERA.
Pace between filings = (27% − 15%) ÷ 9 months = 1.3% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Building plan | BDA - Bangalore Development Authority · No. 115/2024-25 · dated 2024-12-31 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (2 orders) | DC OFFICE BANGALORE URBAN · No. 686245 and 1 more · dated 2024-07-19 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BDA - Bangalore Development Authority · No. 115/2024-25 · dated 31 Dec 2024
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 20 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Rainbow Mayfair RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About MR Infraa
- Promoter type
- Partnership Firm
- Projects on this site
- 1
- RERA complaints against promoter
- 0
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (20 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
MR Infraa’s RERA recordMR Infraa delivery record
- 1Projects in Bengaluru on RERA1 approved registration under MR Infraa in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 62Homes registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 homes0 complaints ÷ 62 homes in its 1 registration on Karnataka RERA in Bengaluru.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Dec 2024
- 15 Oct 2026Quarterly update filed for Q2 2026-27: 27% built, 13 of 62 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Quarterly update filed for Q1 2026-27: 23% built, 12 of 62 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Quarterly update filed for Q4 2025-26: 20% built, 9 of 62 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 13 Jan 2026Quarterly update filed for Q3 2025-26: 15% built, 7 of 62 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 19 Mar 2025Registered with Karnataka RERA (PRM/KA/RERA/1251/308/PR/190325/007593); completion date 31 Jan 2030 Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Mar 2025Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 31 Dec 2024Building plan approved by BDA - Bangalore Development Authority (No. 115/2024-25) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Rainbow Mayfair FAQs
What is the RERA registration number for Rainbow Mayfair?
The RERA registration number is PRM/KA/RERA/1251/308/PR/190325/007593, registered on 19 March 2025.
When will Rainbow Mayfair be completed?
The completion date on RERA is 31 January 2030.
What home types are available in Rainbow Mayfair?
The project has 4 BHK homes with carpet area between 3,000 to 3,179 sq ft (48 homes) and 5 BHK homes with carpet area between 3,574 to 3,663 sq ft (14 homes).
How many homes are there in Rainbow Mayfair?
There are 62 homes in total.
What is the construction progress of Rainbow Mayfair?
As of Q2 2026-27 (quarter ended 30 September 2026), the project is 27% complete.
How many homes have been booked in Rainbow Mayfair?
As of Q2 2026-27, 13 homes have been booked out of 62.
Where is Rainbow Mayfair located?
The project is in Hullahalli, Anekal taluk, Bengaluru Urban district, PIN code 560083.
Are there any RERA complaints against Rainbow Mayfair?
There are no complaints filed on this project.
Who is the builder of Rainbow Mayfair?
The builder is MR Infraa, a partnership firm. The builder has no complaints against it across all projects on RERA record and has 2 projects registered in Bengaluru.
What is the land area of Rainbow Mayfair?
The land area is 15,075 sq m.
Written by AI from the RERA record above on 20 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Rainbow Mayfair
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from MR Infraa? Review the builder.
Reviews of MR Infraa by verified buyers
No verified reviews of MR Infraa yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Shravanthi PrakrutiBKN Developers Pvt Ltd | 1.3 km | 180 | Mar 2028 | 59% | 0 | Not collected |
| Godrej VanantaraGodrej Properties Limited | 1.8 km | 2,008 | May 2031 | 1% | 0 | from ₹1.49 Cr |
| DS Max Sky SanmanDS Max Properties Private Limited | 2 km | 990 | Jan 2030 | 62% | 1 | Not collected |
| Sound of Water Phase 3Puravankara Limited | 2.2 km | 60 | Jun 2027 | 100% | 0 | Not collected |
| Ragam MeadowsM R Ventures | 2.3 km | 140 | Aug 2027 | 40% | 0 | Not collected |
| SNN Raj SerenitySNN Builders Private Limited | 2.3 km | 594 | Oct 2027 | 98% | 3 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 20 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/308/PR/190325/007593.
- RERA record last checked: 20 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 20 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects nearby
Bettadasanapura, near Begur RoadUnder constructionRERA registeredBuyers’ group openShravanthi Prakruti
by BKN
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK, 4 BHK
- 616 – 1,177 sq ft
- Mar 2028
180 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Shravanthi Prakruti
Hommadevanahal, near Bannerghatta RoadArtist’s impressionUnder constructionRERA registeredBuyers’ group openGodrej Vanantara
by Godrej Properties
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK, 4 BHK
- 833 – 1,997 sq ft
- May 2031
2,008 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Godrej Vanantara
S. Bingipura, near Begur RoadUnder constructionRERA registeredBuyers’ group openDS Max Sky Sanman
by DS Max Properties
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 618 – 1,057 sq ft
- Jan 2030
990 homes · 1 RERA complaint
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for DS Max Sky Sanman