Shravanthi Prakruti
2, 3 & 4 BHK apartments by BKN Developers Pvt Ltd · Bettadasanapura, near Begur Road, Bengaluru
Bettadasanapura, near Begur Road, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Shravanthi Prakruti at a glance
- Possession (RERA)Mar 2028Karnataka RERA
- Construction59% built · on pace for Aug 2028 4 mo after RERA dateRERA filing to 30 Sep 2026; estimate from average pace
- Homes booked53 of 180 (29%)RERA update · as on 30 Sep 2026
- RERA complaints (project)None listedKarnataka RERA · as on 21 Oct 2026
- Approvals filed4 of 9 on RERAKarnataka RERA uploads · 21 Oct 2026
- Nearest metroBeratena Agrahara · 3.94 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 164 min at peak40.55 km straight line · estimate
- Nearest lakeUnnamed lake · 485 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Shravanthi Prakruti is a residential project by BKN Developers Pvt Ltd in Bettadasanapura, Bengaluru with 180 homes, registered with Karnataka RERA. The completion date on RERA is 31 Mar 2028.
Facts collected on 21 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Shravanthi Prakruti buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks BKN Developers Pvt Ltd for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Shravanthi Prakruti buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 2 BHK, 3 BHK, 4 BHK
- Carpet area
- 616 – 1,177 sq ft
- Towers
- 4
- Floors
- 4
- Total homes
- 180
- Land
- 2.15 acres
- Possession (RERA)
- Mar 2028
- Built (RERA update)
- 59%
Shravanthi Prakruti RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/310/PR/180424/006801
- Registered on
- 18 Apr 2024
- Promised completion
- 31 Mar 2028
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- 53 of 180 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| Block A | 4 | 0 | 56 |
| Block B | 4 | 0 | 48 |
| Block C | 4 | 0 | 36 |
| Block D | 4 | 0 | 40 |
A dash (—) means the filing did not state that value.
Summary in plain English
Shravanthi Prakruti is a residential project by BKN Developers Pvt Ltd in Bettadasanapura, Bengaluru South, with 180 homes across 4 towers. The project is registered with the Karnataka RERA and is scheduled for completion on 31 March 2028.
Written by AI from the RERA record above on 21 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 53% of land
- Water and power
- Water source filed with RERA: BoreWell
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- INDIAN OVERSEAS BANK, Eastend
- Building plan (RERA)
- BDA - Bangalore Development Authority · No. BDA/NUM/AS/AA-03/Tas-02/D/08/2023-24 · dated 2 Jun 2023
- Project cost declared to RERA
- ₹89.13 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- CCTV Surveillance
- Club House
- Indoor Sports facility
- Swimming Pool
- Gym
- Parks
- Power Backup
- Water and Sanitation
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Shravanthi Prakruti location and address
- Address
- Sy No 29 Bettadasanapura Village, Begur Hobli , Bangalore South Taluk , Bengaluru South , Bengaluru Urban, Karnataka - 560100
- Village (RERA)
- Bettadasanapura
- Locality
- Near Begur RoadAlso known as Begur, Begur Main Road, Begur Koppa Road
- PIN code
- 560100
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.84377, 77.62793
Distances to landmarks
Not found in public records yet: landmarksAbout Bettadasanapura
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 4.07 km | approx. 16 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 10.6 km | approx. 43 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 16.23 km | approx. 66 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 19.94 km | approx. 81 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 22.74 km | approx. 92 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 40.55 km | approx. 164 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 8Schools and colleges8 schools, 0 colleges, 0 kindergartens
- 2Hospitals and clinics1 hospitals, 1 clinics
Nearest schools and colleges
- Delhi Public School Electronic City · 0.44 km
- GHPS Bettadasana Pura · 0.5 km
- Preethidhama, Begur · 1.12 km
Nearest hospitals and clinics
- Neo Hospital · 1.78 km
- Narayana Clinic · 1.88 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Beratena Agrahara (ಬೆರಟೇನ ಅಗ್ರಹಾರ)Open now — nearest operating metro station3.94 km
- Huskuru (ಹುಸ್ಕೂರ್)Nearest railway station9.12 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 485 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 485 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 580 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 787 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Shravanthi Prakruti floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Brochure

BrochureFull PDF on RERA
Approved layout plan2 files

Approved Layout PlanFull PDF on RERA 
Existing Layout PlanFull PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 2 BHK | 616 – 855 sq ft | 88 |
| 3 BHK | 701 – 1,097 sq ft | 88 |
| 4 BHK | 1,177 sq ft | 4 |
| Residential | 867 sq ft | 180 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Shravanthi Prakruti possession date and construction status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-14.
By tower (Q2 2026-27)
Units sold and unsold, from RERA (Q2 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 2 BHK | 88 | 33 | 55 |
| 3 BHK | 88 | 20 | 68 |
| 4 BHK | 4 | 0 | 4 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 1 Feb 2024Project start date given to RERA
- 18 Apr 2024Registered with Karnataka RERA
- 31 Mar 2028Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Aug 2028 — about 4 months after the completion date on RERA (31 Mar 2028).
At the pace between the 4 quarterly filings we have (47% → 59% in 9 months), it would be around Apr 2029 — about 13 months after the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 14 Oct 2026 | 59% | 53 of 180 |
| Q1 2026-27to 30 Jun 2026 | 12 Jul 2026 | 57% | 33 of 180 |
| Q4 2025-26to 31 Mar 2026 | 15 Apr 2026 | 53% | 23 of 180 |
| Q3 2025-26to 31 Dec 2025 | 13 Jan 2026 | 47% | 18 of 180 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 59% ÷ 31.9 months (1 Feb 2024 to 30 Sep 2026) = 1.8% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 41 ÷ 1.8 = 22.2 months → Aug 2028. This is an estimate, not a date from the builder or RERA.
Pace between filings = (59% − 47%) ÷ 9 months = 1.3% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-14.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
13 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Building plan | BDA - Bangalore Development Authority · No. BDA/NUM/AS/AA-03/Tas-02/D/08/2023-24 · dated 2023-06-02 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion | BDA · No. G.PUC/(ja Da) (Bem.Da.Ta) Haraju.CR/05/2006-07 Dated: 16.11.19 · dated 2019-11-11 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Change of Land Use | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| District Magistrate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approval/NOC under section 109 of KLR Act 1961 | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BDA - Bangalore Development Authority · No. BDA/NUM/AS/AA-03/Tas-02/D/08/2023-24 · dated 2 Jun 2023
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMNot on RERA yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 21 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Shravanthi Prakruti RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About BKN Developers Pvt Ltd
- Promoter type
- Company
- Projects on this site
- 1
- RERA complaints against promoter
- 0
- Company number (CIN)
- U45200KA2012PTC062419
From Karnataka RERA, as collected so far (21 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
BKN Developers Pvt Ltd’s RERA recordBKN Developers Pvt Ltd delivery record
- 1Projects in Bengaluru on RERA1 approved registration under BKN Developers Pvt Ltd in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 180Homes registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 homes0 complaints ÷ 180 homes in its 1 registration on Karnataka RERA in Bengaluru.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Jun 2023
- 14 Oct 2026Quarterly update filed for Q2 2026-27: 59% built, 53 of 180 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 12 Jul 2026Quarterly update filed for Q1 2026-27: 57% built, 33 of 180 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Quarterly update filed for Q4 2025-26: 53% built, 23 of 180 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 13 Jan 2026Quarterly update filed for Q3 2025-26: 47% built, 18 of 180 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 18 Apr 2024Registered with Karnataka RERA (PRM/KA/RERA/1251/310/PR/180424/006801); completion date 31 Mar 2028 Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Feb 2024Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 2 Jun 2023Building plan approved by BDA - Bangalore Development Authority (No. BDA/NUM/AS/AA-03/Tas-02/D/08/2023-24) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Shravanthi Prakruti FAQs
What is Shravanthi Prakruti?
Shravanthi Prakruti is a residential project by BKN Developers Pvt Ltd located in Bettadasanapura, Bengaluru South, with 180 homes across 4 towers of up to 4 floors each.
When will Shravanthi Prakruti be completed?
The project is scheduled for completion on 31 March 2028 according to the RERA record.
What home types are available in Shravanthi Prakruti?
The project offers 2 BHK homes (carpet area 616 to 855 sq ft), 3 BHK homes (carpet area 701 to 1,097 sq ft), and 4 BHK homes (carpet area 1,177 sq ft).
How many homes are in Shravanthi Prakruti?
The project has 180 homes in total: 88 two-bedroom units, 88 three-bedroom units, and 4 four-bedroom units.
What is the RERA registration number for Shravanthi Prakruti?
The RERA registration number is PRM/KA/RERA/1251/310/PR/180424/006801, registered on 18 April 2024.
What is the construction progress of Shravanthi Prakruti?
As of the quarter ending 30 September 2026, the project is 59% complete with 53 homes booked out of 180.
Where is Shravanthi Prakruti located?
The project is in Bettadasanapura, Bengaluru South taluk, Bengaluru Urban district, PIN code 560100.
Are there any RERA complaints against Shravanthi Prakruti?
There are no RERA complaints on this project registration.
What is the land area of Shravanthi Prakruti?
The project land area is 8,700 sq m.
Which bank holds the escrow account for Shravanthi Prakruti?
The escrow account is held with Indian Overseas Bank.
Written by AI from the RERA record above on 21 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Shravanthi Prakruti
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from BKN Developers Pvt Ltd? Review the builder.
Reviews of BKN Developers Pvt Ltd by verified buyers
No verified reviews of BKN Developers Pvt Ltd yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Ragam MeadowsM R Ventures | 1.1 km | 140 | Aug 2027 | 40% | 0 | Not collected |
| Rainbow MayfairMR Infraa | 1.3 km | 62 | Jan 2030 | 27% | 0 | Not collected |
| Bren Park CityBren Corporation Private Limited | 2 km | 616 | Jun 2029 | 15% | 0 | Not collected |
| SNN Raj SerenitySNN Builders Private Limited | 2.1 km | 594 | Oct 2027 | 98% | 3 | Not collected |
| Amoga Sai ResidencyAmoga Builders | 2.3 km | 64 | Dec 2027 | 59% | 0 | Not collected |
| Suraksha SpringsAuk Suraksha Properties | 2.5 km | 180 | Mar 2027 | 100% | 1 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 21 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/310/PR/180424/006801.
- RERA record last checked: 21 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 21 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects nearby
Begur RoadUnder constructionRERA registeredBuyers’ group openRagam Meadows
by M R Ventures
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 727 – 1,094 sq ft
- Aug 2027
140 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Ragam Meadows
Hullahalli, near Begur RoadUnder constructionRERA registeredBuyers’ group openRainbow Mayfair
by MR Infraa
Price: Price on requestGet brochure & price →
- 4 BHK, 5 BHK
- 3,000 – 3,663 sq ft
- Jan 2030
62 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Rainbow Mayfair
Hulimangala, near Electronic City Phase 1Under constructionRERA registeredBuyers’ group openBren Park City
by Bren Corporation
Price: Price on requestGet brochure & price →
- 1 BHK, 3 BHK
- 419 – 1,021 sq ft
- Jun 2029
616 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Bren Park City