Reviva By Ssi at a glance
- Possession (RERA)Dec 2028Karnataka RERA
- Construction61% built · on pace for Oct 2027RERA filing to 30 Sep 2026; estimate from average pace
- Homes booked76 of 234 (32%)RERA update · as on 30 Sep 2026
- RERA complaints (project)None listedKarnataka RERA · as on 20 Oct 2026
- Approvals filed8 of 9 on RERAKarnataka RERA uploads · 20 Oct 2026
- Nearest metroDelta Electronics Bommasandra · 2.75 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 183 min at peak45.11 km straight line · estimate
- Nearest lakeKitthiganahalli Bommasandra Lake · 1,330 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Reviva By Ssi is a residential project by Sri Sai Infra in Banahalli, Bengaluru with 234 homes, registered with Karnataka RERA. The completion date on RERA is 31 Dec 2028.
Facts collected on 20 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Reviva By Ssi buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Sri Sai Infra for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Reviva By Ssi buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 2 BHK, 3 BHK
- Carpet area
- 409 – 1,012 sq ft
- Towers
- 2
- Floors
- 8
- Total homes
- 234
- Land
- 2.97 acres
- Possession (RERA)
- Dec 2028
- Built (RERA update)
- 61%
Reviva By Ssi RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/308/PR/130525/007735
- Registered on
- 13 May 2025
- Promised completion
- 31 Dec 2028
- Extended to
- No extension recorded
- RERA status
- Under construction
- Homes booked
- 76 of 234 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| ALOHA | 8 | 1 | 108 |
| BLISS | 8 | 1 | 126 |
A dash (—) means the filing did not state that value.
Summary in plain English
Reviva By Ssi is a residential project by Sri Sai Infra in Banahalli, Anekal, with 234 homes across 2 towers of up to 8 floors. The project is registered with Karnataka RERA and is expected to be completed on 31 December 2028.
Written by AI from the RERA record above on 20 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 73.5% of land
- Water and power
- Water source filed with RERA: Local Authority
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- HDFC, MARATHAHALLI
- Building plan (RERA)
- BMRDA - Bangalore Metropolitan Region Development Authority · No. BMRDA/TP/564/2024-25 · dated 1 Mar 2025
- Project cost declared to RERA
- ₹117 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- CCTV Surveillance
- Club House
- Community Hall
- Outdoor Sports facility
- Indoor Sports facility
- Swimming Pool
- Gym
- Parks
- Power Backup
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Reviva By Ssi location and address
- Address
- Reviva by SSI, banahalli village, , Suryanagar Phase I, Suryanagar, Bommasandra, Bengaluru, Karnataka , Anekal , Bengaluru Urban, Karnataka - 562106
- Village (RERA)
- Banahalli
- Locality
- Hosur RoadAlso known as Hosur Main Road, NH 48
- PIN code
- 562106
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.79515, 77.69324
Distances to landmarks
Not found in public records yet: landmarksAbout Hosur Road
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 6.79 km | approx. 28 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 14.35 km | approx. 58 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 21.94 km | approx. 89 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 24.37 km | approx. 99 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 29.23 km | approx. 118 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 45.11 km | approx. 183 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 8Schools and colleges6 schools, 1 colleges, 1 kindergartens
- 15Hospitals and clinics9 hospitals, 6 clinics
Nearest schools and colleges
- BTL Institute of Technology · 1.63 km
- Rising Kids Pre School · 1.77 km
Nearest hospitals and clinics
- Balaji Clinic · 0.78 km
- Mazumdar Shaw Medical Center · 1.29 km
- Dr. Naveen S Tahasildar · 1.31 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Delta Electronics Bommasandra (ಡೆಲ್ಟಾ ಎಲೆಕ್ಟ್ರಾನಿಕ್ಸ್ ಬೊಮ್ಮಸಂದ್ರ)Open now — nearest operating metro station2.75 km
- Heelalige (ಹೀಲಲಿಗೆ ರೈಲು ನಿಲ್ದಾಣ)Nearest railway station2.79 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Kitthiganahalli Bommasandra Lake, 1,330 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Kitthiganahalli Bommasandra Lake on OpenStreetMap (opens in a new tab) 1,330 m
- Kachanayakanahalli lake on OpenStreetMap (opens in a new tab) 1,779 m
- Ramakrishnapura Lake on OpenStreetMap (opens in a new tab) (ರಾಮಕೃಷ್ಣಪುರ ಕೆರೆ)1,806 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Reviva By Ssi floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Brochure10 pages

BrochureFull PDF on RERA 






Approved building plan4 pages

Approved Building PlanFull PDF on RERA
Approved layout plan2 files

Banahalli 55 LU_Demarcation of proposed land in approved master plan certified by the concern authorityFiled 4 Apr 2025 · Full PDF on RERA 
Banahalli 55 RC_Demarcation of proposed land in original Village map certified by the concern authorityFiled 4 Apr 2025 · Full PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 2 BHK | 715 – 722 sq ft | 72 |
| 2 BHK east a block gf & 1st floor | 710 sq ft | 8 |
| 2 BHK east a block typical | 710 sq ft | 28 |
| 2 BHK west b block gf & first floor | 721 sq ft | 8 |
| 2 BHK west b block typical | 721 sq ft | 28 |
| 3 BHK | 867 – 1,008 sq ft | 162 |
| 3 BHK east a block gf & 1st floor | 409 sq ft | 4 |
| 3 BHK east a block typical | 969 sq ft | 14 |
| 3 BHK east b block gf & first floor | 861 – 969 sq ft | 12 |
| 3 BHK east b block typical | 904 – 1,012 sq ft | 60 |
| 3 BHK north a block gf & 1st floor | 969 sq ft | 2 |
| 3 BHK north a block typical | 980 sq ft | 7 |
| 3 BHK west a block gf & 1st floor | 861 sq ft | 10 |
| 3 BHK west a block typical | 883 sq ft | 35 |
| 3 BHK west b block gf & first floor | 969 – 990 sq ft | 4 |
| 3 BHK west b block typical | 990 – 1,001 sq ft | 14 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Reviva By Ssi possession date and construction status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-14.
By tower (Q2 2026-27)
Units sold and unsold, from RERA (Q2 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 2 BHK | 72 | 26 | 46 |
| 3 BHK | 162 | 50 | 112 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 4 Mar 2025Project start date given to RERA
- 13 May 2025Registered with Karnataka RERA
- 31 Dec 2028Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Oct 2027 — about 15 months before the completion date on RERA (31 Dec 2028).
At the pace between the 4 quarterly filings we have (25% → 61% in 9 months), it would be around Jul 2027 — about 17 months before the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 14 Oct 2026 | 61% | 76 of 234 |
| Q1 2026-27to 30 Jun 2026 | 14 Jul 2026 | 44% | 63 of 234 |
| Q4 2025-26to 31 Mar 2026 | 5 May 2026 | 33% | 58 of 234 |
| Q3 2025-26to 31 Dec 2025 | 24 Jan 2026 | 25% | 106 of 234 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 61% ÷ 18.9 months (4 Mar 2025 to 30 Sep 2026) = 3.2% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 39 ÷ 3.2 = 12.1 months → Oct 2027. This is an estimate, not a date from the builder or RERA.
Pace between filings = (61% − 25%) ÷ 9 months = 4% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-14.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
11 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Building plan | BMRDA - Bangalore Metropolitan Region Development Authority · No. BMRDA/TP/564/2024-25 · dated 2025-03-01 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion | Special Deputy commissioner, Bengaluru District · No. ALN (A) (A) SR.2/2008-09 · dated 2008-11-26 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| NOC in case of building proposals abutting to neighbouring properties | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BMRDA - Bangalore Metropolitan Region Development Authority · No. BMRDA/TP/564/2024-25 · dated 1 Mar 2025
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 20 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Reviva By Ssi RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Sri Sai Infra
- Promoter type
- Partnership Firm
- Projects on this site
- 1
- RERA complaints against promoter
- 0
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (20 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Sri Sai Infra’s RERA recordSri Sai Infra delivery record
- 1Projects in Bengaluru on RERA1 approved registration under Sri Sai Infra in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 234Homes registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 homes0 complaints ÷ 234 homes in its 1 registration on Karnataka RERA in Bengaluru.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Mar 2025
- 14 Oct 2026Quarterly update filed for Q2 2026-27: 61% built, 76 of 234 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Jul 2026Quarterly update filed for Q1 2026-27: 44% built, 63 of 234 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 5 May 2026Quarterly update filed for Q4 2025-26: 33% built, 58 of 234 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 24 Jan 2026Quarterly update filed for Q3 2025-26: 25% built, 106 of 234 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 13 May 2025Registered with Karnataka RERA (PRM/KA/RERA/1251/308/PR/130525/007735); completion date 31 Dec 2028 Source (rera.karnataka.gov.in) (opens in a new tab)
- 4 Mar 2025Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Mar 2025Building plan approved by BMRDA - Bangalore Metropolitan Region Development Authority (No. BMRDA/TP/564/2024-25) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Reviva By Ssi FAQs
What is the completion date for Reviva By Ssi?
The completion date on RERA is 31 December 2028.
How many homes are in Reviva By Ssi?
The project has 234 homes across 2 towers.
What home types are available in Reviva By Ssi?
The project offers 2 BHK and 3 BHK homes with carpet area ranging from 409 sq ft to 1,012 sq ft.
What is the carpet area range for 2 BHK homes in Reviva By Ssi?
2 BHK homes have carpet area between 710 sq ft and 722 sq ft.
What is the carpet area range for 3 BHK homes in Reviva By Ssi?
3 BHK homes have carpet area between 409 sq ft and 1,012 sq ft.
Where is Reviva By Ssi located?
The project is in Banahalli, Anekal taluk, Bengaluru Urban district, PIN 562106.
What is the current construction progress of Reviva By Ssi?
As of Q2 2026-27 (ended 30 September 2026), the project is 61% complete with 76 homes booked out of 234.
What is the RERA registration number for Reviva By Ssi?
The RERA registration number is PRM/KA/RERA/1251/308/PR/130525/007735, registered on 13 May 2025.
Are there any RERA complaints on Reviva By Ssi?
There are no complaints on this project in the RERA record.
What is Sri Sai Infra's record with RERA?
Sri Sai Infra has no complaints against it in RERA records and has 1 project registered.
Written by AI from the RERA record above on 20 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Reviva By Ssi
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Sri Sai Infra? Review the builder.
Reviews of Sri Sai Infra by verified buyers
No verified reviews of Sri Sai Infra yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Abhee Serenity SpringsAbhee Ventures Private Limited | 0.7 km | 288 | Jun 2030 | 35% | 0 | Not collected |
| Subha Eden - 1Subha Luxury Projects LLP | 1 km | 12 | Dec 2026 | 15% | 0 | Not collected |
| Subha Eden-2Subha Luxury Projects LLP | 1 km | 14 | Dec 2026 | 15% | 0 | Not collected |
| Green ViewHoysala And Best Realty | 1 km | 73 | Mar 2026 | — | 0 | Not collected |
| Abhee PrideAbhee Ventures Private Limited | 1.2 km | 104 | Jun 2026 | 100% | 0 | Not collected |
| Cielo at Brigade ValenciaBrigade Enterprises Ltd | 1.3 km | 662 | Dec 2027 | 88% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 20 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/308/PR/130525/007735.
- RERA record last checked: 20 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 20 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Hosur Road
Kachanayakanahalli, Hosur RoadUnder constructionRERA registeredBuyers’ group openAbhee Serenity Springs
by Abhee Ventures
Price: Price on requestGet brochure & price →
- 2 BHK, 2.5 BHK, 3 BHK
- 707 – 1,104 sq ft
- Jun 2030
288 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Abhee Serenity Springs
Basapura, Hosur RoadUnder constructionRERA registeredBuyers’ group openK&T'S Sai Sannidhi
by K & T Constructions
Price: Price on requestGet brochure & price →
- 1 BHK, 2 BHK, 3 BHK
- 385 – 1,048 sq ft
- Dec 2025
RERA not updated since promised Dec 2025 · 40 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for K&T'S Sai Sannidhi
Singasandra, Hosur RoadUnder constructionRERA registeredBuyers’ group openLegend Valencia
by Legend Property
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 834 – 1,354 sq ft
- Dec 2026
174 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Legend Valencia