Ruchira Park East
2 & 3 BHK apartments by Ruchira Developers LLP · Kannamangala, Old Madras Road, Bengaluru
Kannamangala, Old Madras Road, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Ruchira Park East at a glance
- Possession (RERA)Jan 2027Karnataka RERA
- Construction69% built · on pace for Jun 2028 17 mo after RERA dateRERA filing to 30 Sep 2026; estimate from average pace
- Homes booked220 of 284 (77%)RERA update · as on 30 Sep 2026
- RERA complaints (project)None listedKarnataka RERA · as on 22 Oct 2026
- Approvals filed8 of 9 on RERAKarnataka RERA uploads · 22 Oct 2026
- Nearest metroWhitefield (Kadugodi) · 3.93 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 80 min at peak19.83 km straight line · estimate
- Nearest lakeUnnamed lake · 911 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Ruchira Park East is a residential project by Ruchira Developers LLP in Kannamangala, Bengaluru with 284 homes, registered with Karnataka RERA. The completion date on RERA is 3 Jan 2027.
Facts collected on 22 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Ruchira Park East buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Ruchira Developers LLP for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Ruchira Park East buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 2 BHK, 3 BHK, 3.5 BHK
- Carpet area
- 878 – 1,511 sq ft
- Towers
- 2
- Floors
- 23
- Total homes
- 284
- Land
- 4.17 acres
- Possession (RERA)
- Jan 2027
- Built (RERA update)
- 69%
Ruchira Park East RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/446/PR/200123/005644
- Registered on
- 20 Jan 2023
- Promised completion
- 3 Jan 2027
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- 220 of 284 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| ERICA | 23 | 2 | 142 |
| PEONY | 23 | 2 | 142 |
A dash (—) means the filing did not state that value.
Summary in plain English
Ruchira Park East is a 284-home residential project by Ruchira Developers LLP in Kannamangala, Bengaluru East, with 2 towers up to 23 floors. The project is registered with Karnataka RERA and is scheduled for completion on 3 January 2027.
Written by AI from the RERA record above on 22 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 85.7% of land
- Water and power
- Water source filed with RERA: BoreWell
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- Axis Bank, Channasandra Main Road KT
- Building plan (RERA)
- BDA - Bangalore Development Authority · No. BDA/EM/EO1/TA4/EAST/31/2022-23 · dated 24 Nov 2022
- Project cost declared to RERA
- ₹216 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- CCTV Surveillance
- Club House
- Indoor Sports facility
- Swimming Pool
- Gym
- Parks
- Power Backup
- Water and Sanitation
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Ruchira Park East location and address
- Address
- 188 & 189, Kannamangala Village , Bidarahalli Hobli, Bangalore , Bengaluru East , Bengaluru Urban, Karnataka - 560067
- Village (RERA)
- Kannamangala
- Locality
- Old Madras RoadAlso known as OMR, Old Madras Road
- PIN code
- 560067
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.03102, 77.76079
Distances to landmarks
Not found in public records yet: landmarksAbout Old Madras Road
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 5.43 km | approx. 22 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 14.72 km | approx. 60 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 15.38 km | approx. 62 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 19.83 km | approx. 80 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 21.54 km | approx. 87 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 22.68 km | approx. 92 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 11Schools and colleges11 schools, 0 colleges, 0 kindergartens
- 1Hospitals and clinics1 hospitals, 0 clinics
Nearest schools and colleges
- Chrysalis High School · 0.88 km
- National Public School ITPL · 1.27 km
- Narayana e-Techno School · 1.29 km
Nearest hospitals and clinics
- Kannamangala Primary Health Center · 0.09 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Whitefield (Kadugodi) (ವೈಟ್ಫೀಲ್ಡ್ (ಕಾಡುಗೋಡಿ))Open now — nearest operating metro station3.93 km
- Whitefield (ವೈಟ್ಫೀಲ್ಡ್)Nearest railway station3.85 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 911 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 911 m
- Bidare Agrahara Lake on OpenStreetMap (opens in a new tab) 1,410 m
- Kannamangala Lake on OpenStreetMap (opens in a new tab) (ಕನ್ನಮಂಗಲ ಕೆರೆ)1,421 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Ruchira Park East floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Brochure20 pages

BrochureFull PDF on RERA 






Floor plans2 files

Area Development Plan Of Project AreaFull PDF on RERA 
Plan 6 - 2nd, 4th to 23rd and Terrace Floor Plan.pdfFull PDF on RERA
Approved layout plan3 files

Approved Layout PlanFull PDF on RERA 
Existing Layout PlanFull PDF on RERA 
Single Layout planFiled 7 Jan 2023 · Full PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 2 BHK | 878 – 961 sq ft | 46 |
| 3 BHK | 1,033 – 1,280 sq ft | 190 |
| 3.5 BHK | 1,511 sq ft | 48 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Ruchira Park East possession date and construction status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
By tower (Q2 2026-27)
Units sold and unsold, from RERA (Q2 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 2 BHK | 44 | 40 | 4 |
| 3 BHK | 192 | 150 | 42 |
| 3.5 BHK | 48 | 30 | 18 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 4 Jan 2023Project start date given to RERA
- 20 Jan 2023Registered with Karnataka RERA
- 3 Jan 2027Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Jun 2028 — about 17 months after the completion date on RERA (3 Jan 2027).
At the pace between the 4 quarterly filings we have (56% → 69% in 9 months), it would be around Jul 2028 — about 18 months after the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 15 Oct 2026 | 69% | 220 of 284 |
| Q1 2026-27to 30 Jun 2026 | 15 Jul 2026 | 65% | 217 of 284 |
| Q4 2025-26to 31 Mar 2026 | 15 Apr 2026 | 60% | 215 of 284 |
| Q3 2025-26to 31 Dec 2025 | 29 Jan 2026 | 56% | 211 of 284 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 69% ÷ 44.8 months (4 Jan 2023 to 30 Sep 2026) = 1.5% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 31 ÷ 1.5 = 20.1 months → Jun 2028. This is an estimate, not a date from the builder or RERA.
Pace between filings = (69% − 56%) ÷ 9 months = 1.4% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
13 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Building plan | BDA - Bangalore Development Authority · No. BDA/EM/EO1/TA4/EAST/31/2022-23 · dated 2022-11-24 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (2 orders) | Special Deputy Commissioner, Bangalore District · No. ALN(E) (B) SR/11/2005-06 and 1 more · dated 2007-08-16 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BDA - Bangalore Development Authority · No. BDA/EM/EO1/TA4/EAST/31/2022-23 · dated 24 Nov 2022
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 22 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Ruchira Park East RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Ruchira Developers LLP
- Promoter type
- Partnership Firm
- Projects on this site
- 3
- RERA complaints against promoter
- 0
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (22 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Ruchira Developers LLP’s RERA recordRuchira Developers LLP delivery record
- 3Projects in Bengaluru on RERA3 approved registrations under Ruchira Developers LLP in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 743Homes and plots registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 homes and plots0 complaints ÷ 743 homes and plots in its 3 registrations on Karnataka RERA in Bengaluru.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Nov 2022
- 15 Oct 2026Quarterly update filed for Q2 2026-27: 69% built, 220 of 284 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Quarterly update filed for Q1 2026-27: 65% built, 217 of 284 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Quarterly update filed for Q4 2025-26: 60% built, 215 of 284 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 29 Jan 2026Quarterly update filed for Q3 2025-26: 56% built, 211 of 284 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 20 Jan 2023Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/200123/005644); completion date 3 Jan 2027 Source (rera.karnataka.gov.in) (opens in a new tab)
- 4 Jan 2023Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 24 Nov 2022Building plan approved by BDA - Bangalore Development Authority (No. BDA/EM/EO1/TA4/EAST/31/2022-23) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Ruchira Park East FAQs
What is Ruchira Park East?
Ruchira Park East is a residential project by Ruchira Developers LLP located in Kannamangala, Bengaluru East, with 284 homes across 2 towers.
How many homes are in Ruchira Park East?
The project has 284 homes in total: 190 of 3 BHK, 48 of 3.5 BHK, and 46 of 2 BHK.
What are the carpet areas for homes in Ruchira Park East?
3 BHK homes range from 1,033 to 1,280 sq ft, 3.5 BHK homes are 1,511 sq ft, and 2 BHK homes range from 878 to 961 sq ft carpet area.
When will Ruchira Park East be completed?
The project completion date on RERA is 3 January 2027.
What is the RERA registration number for Ruchira Park East?
The RERA registration number is PRM/KA/RERA/1251/446/PR/200123/005644.
How much of Ruchira Park East is constructed?
As of the latest quarterly update for Q2 2026-27, the project is 69% complete.
How many homes are booked in Ruchira Park East?
As of Q2 2026-27, 220 homes are booked out of 284 homes.
Are there any RERA complaints on Ruchira Park East?
There are no RERA complaints on this project.
Where is Ruchira Park East located?
Ruchira Park East is in Kannamangala, Bengaluru East, PIN code 560067.
What is the builder's track record?
Ruchira Developers LLP has 3 projects in the Karnataka RERA Bengaluru records with no complaints against the builder.
Written by AI from the RERA record above on 22 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Ruchira Park East
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Ruchira Developers LLP? Review the builder.
Reviews of Ruchira Developers LLP by verified buyers
No verified reviews of Ruchira Developers LLP yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Platinum East WoodsPlatinum - Narya Infra | 0.1 km | 188 | Mar 2027 | 62% | 0 | Not collected |
| Royal ViewGreen Edge Developers | 0.4 km | 237 | Dec 2026 | — | 0 | Not collected |
| Silver HorizonGreen Edge Infracon | 0.4 km | 217 | Aug 2030 | — | 0 | Not collected |
| Assetz MarqAssetz Whitefield Homes Private Limited | 0.7 km | 2,148 | Jul 2027extended | — | 7 | Not collected |
| NirvanaM/s Virtue Infracon | 0.9 km | 40 | Mar 2026 | 100% | 0 | Not collected |
| Sarang By SumadhuraSumadhura Infracon Private Limited | 0.9 km | 410 | Jun 2027 | — | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 22 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/446/PR/200123/005644.
- RERA record last checked: 22 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 22 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Old Madras Road
Kannamangala, Old Madras RoadUnder constructionRERA registeredBuyers’ group openPlatinum East Woods
by Platinum - Narya Infra
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK, 4 BHK
- 676 – 1,361 sq ft
- Mar 2027
188 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Platinum East Woods- Kannamangala, Old Madras Road© Esri, Maxar, Earthstar GeographicsUnder constructionRERA registeredBuyers’ group open
Royal View
by Green Edge
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK, 4 BHK
- 977 – 2,708 sq ft
- Dec 2026
237 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Royal View
Kannamangala, Old Madras RoadArtist’s impressionUnder constructionRERA registeredBuyers’ group openAssetz Marq
by Assetz Whitefield Homes
Price: Price on requestGet brochure & price →
- Studio, 1 BHK, 2 BHK, 3 BHK, +1 more
- 213 – 1,612 sq ft
- Jul 2027 (extended)
4 phases on RERA · 2,148 homes · 7 RERA complaints
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Assetz Marq