SGK Sai Sonna Kodum
2 & 3 BHK apartments by SGK Infra And Developers · Kammasandra, Electronic City Phase 2, Bengaluru
Kammasandra, Electronic City Phase 2, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
SGK Sai Sonna Kodum at a glance
- Possession (RERA)Jun 2027 ExtendedWas Jun 2026 · Karnataka RERA
- Construction90% built · on pace for Jan 2027RERA filing to 30 Sep 2026; estimate from average pace
- Homes booked46 of 64 (72%)RERA update · as on 30 Sep 2026
- RERA complaints (project)None listedKarnataka RERA · as on 20 Oct 2026
- Approvals filed5 of 9 on RERAKarnataka RERA uploads · 20 Oct 2026
- Nearest metroDelta Electronics Bommasandra · 0.93 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 168 min at peak41.52 km straight line · estimate
- Nearest lakeKammasandra Lake · 120 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
SGK Sai Sonna Kodum is a residential project by SGK Infra And Developers in Kammasandra, Bengaluru with 64 homes, registered with Karnataka RERA. The completion date on RERA is 30 Jun 2027.
Facts collected on 20 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
SGK Sai Sonna Kodum buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks SGK Infra And Developers for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the SGK Sai Sonna Kodum buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 2 BHK, 3 BHK
- Carpet area
- 587 – 1,013 sq ft
- Towers
- 1
- Floors
- 4
- Total homes
- 64
- Land
- 0.75 acres
- Possession (extended)
- Jun 2027
- Built (RERA update)
- 90%
SGK Sai Sonna Kodum RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/308/PR/101224/007280
- Registered on
- 10 Dec 2024
- Promised completion
- 30 Jun 2026
- Extended to
- 30 Jun 2027
- RERA status
- Under construction
- Homes booked
- 46 of 64 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| SGK SAI SONNA KODUM | 4 | 1 | 64 |
A dash (—) means the filing did not state that value.
Summary in plain English
SGK Sai Sonna Kodum is a residential project by SGK Infra And Developers in Kammasandra, Anekal, Bengaluru Urban. The project has 64 homes in 1 tower of up to 4 floors. The RERA completion date is 30 June 2027, with an extension under Section 6.
Written by AI from the RERA record above on 20 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 62.6% of land
- Water and power
- Water source filed with RERA: Local Authority
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- Union Bank of India, Anantha Nagar
- Building plan (RERA)
- Local Planing Authority · No. 1038/23-24 · dated 14 Feb 2024
- Project cost declared to RERA
- ₹27.26 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- CCTV Surveillance
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
SGK Sai Sonna Kodum location and address
- Address
- Converted Survey Number 56/2 and 57/2, Khatha No OC-HBG-2023-24-9693 , Kammasandra Village, Attibele Hobli , Anekal , Bengaluru Urban, Karnataka - 562107
- Village (RERA)
- Kammasandra
- Locality
- Electronic City Phase 2Also known as Electronics City Phase 2, E-City Phase 2
- PIN code
- 562107
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.82759, 77.68994
Distances to landmarks
Not found in public records yet: landmarksAbout Electronic City Phase 2
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 3.66 km | approx. 15 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 10.73 km | approx. 43 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 18.54 km | approx. 75 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 21.23 km | approx. 86 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 25.67 km | approx. 104 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 41.52 km | approx. 168 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 13Schools and colleges9 schools, 3 colleges, 1 kindergartens
- 11Hospitals and clinics4 hospitals, 7 clinics
Nearest schools and colleges
- St. Augustine School · 0.49 km
- Glow Montessori Centre · 0.61 km
- Government Higher Primary School · 0.85 km
Nearest hospitals and clinics
- Sri Sai Clinic · 0.26 km
- Anjaneya Homeo Care · 0.59 km
- JJ Hospital · 0.94 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Delta Electronics Bommasandra (ಡೆಲ್ಟಾ ಎಲೆಕ್ಟ್ರಾನಿಕ್ಸ್ ಬೊಮ್ಮಸಂದ್ರ)Open now — nearest operating metro station0.93 km
- Heelalige (ಹೀಲಲಿಗೆ ರೈಲು ನಿಲ್ದಾಣ)Nearest railway station2.79 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Kammasandra Lake, 120 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Kammasandra Lake on OpenStreetMap (opens in a new tab) (ಕಮ್ಮಸಂದ್ರ ಕೆರೆ)120 m
- Andapura Lake on OpenStreetMap (opens in a new tab) 1,354 m
- Hebbagodi Lake on OpenStreetMap (opens in a new tab) (ಹೆಬ್ಬಗೋಡಿ ಕೆರೆ)1,591 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
SGK Sai Sonna Kodum floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Floor plans5 files

Typical Floor PlanFiled 13 Sep 2024 · Full PDF on RERA 
Area Development Plan Of Project AreaFull PDF on RERA 
Ground Floor planFiled 13 Sep 2024 · Full PDF on RERA 
Approved Building/Plotting PlanFull PDF on RERA 
Basement Floor planFiled 13 Sep 2024 · Full PDF on RERA
Approved layout plan3 files

Approved Layout PlanFull PDF on RERA 
Existing Layout PlanFull PDF on RERA 
CDP DEMARCATION.pdfFull PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 2 BHK | 587 – 636 sq ft | 25 |
| 2 BHK flats | 610 sq ft | 25 |
| 3 BHK | 824 – 1,013 sq ft | 39 |
| 3 BHK flats | 887 sq ft | 39 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
SGK Sai Sonna Kodum possession date and construction status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
Units sold and unsold, from RERA (Q2 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 2 BHK | 25 | 22 | 3 |
| 3 BHK | 39 | 24 | 15 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 14 Feb 2024Project start date given to RERA
- 10 Dec 2024Registered with Karnataka RERA
- 30 Jun 2026Completion date given at registration
- 30 Jun 2027Section 6 Extension: completion date moved to this date
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Jan 2027 — about 5 months before the completion date on RERA (30 Jun 2027).
At the pace between the 4 quarterly filings we have (78% → 90% in 9 months), it would be around May 2027 — about 1 month before the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 15 Oct 2026 | 90% | 46 of 64 |
| Q1 2026-27to 30 Jun 2026 | 15 Jul 2026 | 82% | 36 of 64 |
| Q4 2025-26to 31 Mar 2026 | 15 Apr 2026 | 82% | 23 of 64 |
| Q3 2025-26to 31 Dec 2025 | 19 Feb 2026 | 78% | 15 of 64 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 90% ÷ 31.5 months (14 Feb 2024 to 30 Sep 2026) = 2.9% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 10 ÷ 2.9 = 3.5 months → Jan 2027. This is an estimate, not a date from the builder or RERA.
Pace between filings = (90% − 78%) ÷ 9 months = 1.3% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
12 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Building plan | Local Planing Authority · No. 1038/23-24 · dated 2024-02-14 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (2 orders) | Deputy Commissioner Bangalore Urban District · No. ALN(A)(A)SR 69/2022-23 and 1 more · dated 2022-06-29 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — Local Planing Authority · No. 1038/23-24 · dated 14 Feb 2024
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 20 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
SGK Sai Sonna Kodum RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About SGK Infra And Developers
- Promoter type
- Partnership Firm
- Projects on this site
- 1
- RERA complaints against promoter
- 0
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (20 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
SGK Infra And Developers’s RERA recordSGK Infra And Developers delivery record
- 1Projects in Bengaluru on RERA1 approved registration under SGK Infra And Developers in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 64Homes registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 homes0 complaints ÷ 64 homes in its 1 registration on Karnataka RERA in Bengaluru.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Feb 2024
- 30 Jun 2027Completion date extended to 30 Jun 2027 Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Oct 2026Quarterly update filed for Q2 2026-27: 90% built, 46 of 64 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Quarterly update filed for Q1 2026-27: 82% built, 36 of 64 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Quarterly update filed for Q4 2025-26: 82% built, 23 of 64 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 19 Feb 2026Quarterly update filed for Q3 2025-26: 78% built, 15 of 64 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 10 Dec 2024Registered with Karnataka RERA (PRM/KA/RERA/1251/308/PR/101224/007280); completion date 30 Jun 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Feb 2024Building plan approved by Local Planing Authority (No. 1038/23-24) Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Feb 2024Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
SGK Sai Sonna Kodum FAQs
What is the RERA registration number for SGK Sai Sonna Kodum?
The RERA registration number is PRM/KA/RERA/1251/308/PR/101224/007280, registered on 10 December 2024.
What are the home types in SGK Sai Sonna Kodum?
The project has 3 BHK flats (39 homes, 887 carpet area sq ft), 2 BHK flats (25 homes, 610 carpet area sq ft), 2 BHK homes (25 homes, 587 to 636 carpet area sq ft), and 3 BHK homes (39 homes, 824 to 1,013 carpet area sq ft).
When is the completion date for SGK Sai Sonna Kodum?
The RERA completion date is 30 June 2027. The original completion date was 30 June 2026, extended under Section 6.
How many homes are in SGK Sai Sonna Kodum?
The project has 64 homes in total.
What is the construction progress of SGK Sai Sonna Kodum?
As of Q2 2026-27 (quarter ended 30 September 2026), construction is 90 per cent complete with 46 homes booked out of 64.
Where is SGK Sai Sonna Kodum located?
The project is in Kammasandra, Anekal taluk, Bengaluru Urban district, PIN code 562107.
Are there any RERA complaints on SGK Sai Sonna Kodum?
There are no RERA complaints filed on this project.
What is SGK Infra And Developers' record on RERA?
SGK Infra And Developers has no RERA complaints against any of their projects and has 1 project in the Bengaluru RERA records.
What is the land area of SGK Sai Sonna Kodum?
The project land area is 3,035 sq m.
Which bank holds the escrow for SGK Sai Sonna Kodum?
The escrow bank for the project is Union Bank of India.
Written by AI from the RERA record above on 20 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about SGK Sai Sonna Kodum
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from SGK Infra And Developers? Review the builder.
Reviews of SGK Infra And Developers by verified buyers
No verified reviews of SGK Infra And Developers yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Sowmya SkylaSowmya Infra Projects | 0.4 km | 68 | Dec 2026 | 91% | 0 | Not collected |
| A B AnanthaAmaravathi Builders | 0.5 km | 32 | Jan 2027 | 84% | 0 | Not collected |
| Vasuki VallabhaSri Lakshmi Vallabha Constructions | 0.6 km | 32 | Dec 2027 | 88% | 0 | Not collected |
| Shriram SapphireShriram Properties Limited | 0.6 km | 414 | Nov 2028 | 61% | 3 | Not collected |
| HSK Urban LivingHSK Developers | 0.7 km | 160 | Mar 2027extended | 94% | 1 | Not collected |
| VaradSatyam Builders & Developers | 0.8 km | 91 | Dec 2027 | 83% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 20 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/308/PR/101224/007280.
- RERA record last checked: 20 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 20 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Electronic City Phase 2
Kammasandra, Electronic City Phase 2Under constructionRERA registeredBuyers’ group openSowmya Skyla
by Sowmya Infra
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 720 – 1,044 sq ft
- Dec 2026
68 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Sowmya Skyla
Kammasandra, Electronic City Phase 2Under constructionRERA registeredBuyers’ group openA B Anantha
by Amaravathi Builders
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 695 – 1,075 sq ft
- Jan 2027
32 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for A B Anantha
Bommasandra, Electronic City Phase 2Under constructionRERA registeredBuyers’ group openVasuki Vallabha
by Sri Lakshmi Vallabha Constructions
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 854 – 1,174 sq ft
- Dec 2027
32 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Vasuki Vallabha