Shriram Sapphire
2 & 3 BHK apartments by Shriram Properties Limited · Bommasandra, Bengaluru
Bommasandra, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Shriram Sapphire at a glance
- Possession (RERA)Nov 2028Karnataka RERA
- Construction61% built · on pace for Jul 2028RERA filing to 30 Sep 2026; estimate from average pace
- Homes booked414 of 414 (100%)RERA update · as on 30 Sep 2026
- RERA complaints (project)3 complaintsKarnataka RERA · as on 21 Oct 2026
- Approvals filed7 of 9 on RERAKarnataka RERA uploads · 21 Oct 2026
- Nearest metroDelta Electronics Bommasandra · 0.66 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 170 min at peak42.02 km straight line · estimate
- Nearest lakeKammasandra Lake · 94 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Shriram Sapphire is a residential project by Shriram Properties Limited in Bommasandra, Bengaluru with 414 homes, registered with Karnataka RERA. The completion date on RERA is 5 Nov 2028.
Facts collected on 21 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Shriram Sapphire buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Shriram Properties Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Shriram Sapphire buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 2 BHK, 3 BHK
- Carpet area
- 635 – 857 sq ft
- Towers
- 6
- Floors
- 8
- Total homes
- 414
- Land
- 5.65 acres
- Possession (RERA)
- Nov 2028
- Built (RERA update)
- 61%
Shriram Sapphire RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/310/PR/090224/006616
- Registered on
- 9 Feb 2024
- Promised completion
- 5 Nov 2028
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- 414 of 414 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| A | 7 | 1 | 84 |
| B | 7 | 1 | 70 |
| C | 7 | 1 | 62 |
| D | 8 | 1 | 72 |
| E | 7 | 1 | 56 |
| F | 7 | 1 | 70 |
A dash (—) means the filing did not state that value.
Summary in plain English
Shriram Sapphire is a residential project by Shriram Properties Limited in Bommasandra, Bengaluru South, with 414 homes across 6 towers. The project comprises 188 two-bedroom and 226 three-bedroom homes, with completion expected on 5 November 2028.
Written by AI from the RERA record above on 21 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 72.4% of land
- Water and power
- Water source filed with RERA: BoreWell,Local Authority
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- HDFC, BENGALURU - RICHMOND ROAD
- Building plan (RERA)
- BMRDA - Bangalore Metropolitan Region Development Authority · No. APA/CC/344/2023-24 · dated 10 Nov 2023
- Project cost declared to RERA
- ₹170 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- CCTV Surveillance
- Club House
- Outdoor Sports facility
- Swimming Pool
- Gym
- Parks
- Power Backup
- Water and Sanitation
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Shriram Sapphire location and address
- Address
- Sy.No-72, Bommasandra Village, Attibele-Hobli , Anekal Taluk, Bangalore-Urban , Bengaluru South , Bengaluru Urban, Karnataka - 560099
- Village (RERA)
- Bommasandra
- Locality
- Bommasandra
- PIN code
- 560099
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.82297, 77.69317
Distances to landmarks
Not found in public records yet: landmarksAbout Bommasandra
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 4.26 km | approx. 17 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 11.28 km | approx. 46 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 18.94 km | approx. 77 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 21.85 km | approx. 88 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 26.27 km | approx. 106 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 42.02 km | approx. 170 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 13Schools and colleges9 schools, 3 colleges, 1 kindergartens
- 16Hospitals and clinics8 hospitals, 8 clinics
Nearest schools and colleges
- Glow Montessori Centre · 1.09 km
- St. Augustine School · 1.11 km
- Government Higher Primary School · 1.19 km
Nearest hospitals and clinics
- Sri Sai Clinic · 0.83 km
- Anjaneya Homeo Care · 0.9 km
- Yashaayu Multi Speciality Ayurveda and Panchakarma Centre · 1.33 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Delta Electronics Bommasandra (ಡೆಲ್ಟಾ ಎಲೆಕ್ಟ್ರಾನಿಕ್ಸ್ ಬೊಮ್ಮಸಂದ್ರ)Open now — nearest operating metro station0.66 km
- Heelalige (ಹೀಲಲಿಗೆ ರೈಲು ನಿಲ್ದಾಣ)Nearest railway station2.22 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Kammasandra Lake, 94 m from the project’s RERA map point.
The site may be next to the lake. The RERA point is one approximate spot and the site boundary is not published as a shape — check the approved plan for the lake buffer.
- Kammasandra Lake on OpenStreetMap (opens in a new tab) (ಕಮ್ಮಸಂದ್ರ ಕೆರೆ)94 m
- Andapura Lake on OpenStreetMap (opens in a new tab) 867 m
- Heelalige Lake on OpenStreetMap (opens in a new tab) 1,034 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Shriram Sapphire floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Floor plans9 pages

Engineer-7-All Sanction Plans Floor PlansFiled 24 Jan 2024 · Full PDF on RERA
Approved layout plan2 files

Approved Layout PlanFull PDF on RERA 
Existing Layout PlanFull PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 2 BHK | 635 – 710 sq ft | 188 |
| 3 BHK | 669 – 857 sq ft | 226 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Shriram Sapphire possession date and construction status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-14.
By tower (Q2 2026-27)
Units sold and unsold, from RERA (Q2 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 2 BHK | 188 | 188 | 0 |
| 3 BHK | 226 | 226 | 0 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 1 Dec 2023Project start date given to RERA
- 9 Feb 2024Registered with Karnataka RERA
- 5 Nov 2028Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Jul 2028 — about 3 months before the completion date on RERA (5 Nov 2028).
At the pace between the 4 quarterly filings we have (50% → 61% in 9 months), it would be around May 2029 — about 7 months after the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 14 Oct 2026 | 61% | 414 of 414 |
| Q1 2026-27to 30 Jun 2026 | 13 Jul 2026 | 56% | 414 of 414 |
| Q4 2025-26to 31 Mar 2026 | 14 Apr 2026 | 53% | 414 of 414 |
| Q3 2025-26to 31 Dec 2025 | 6 Feb 2026 | 50% | 414 of 414 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 61% ÷ 34 months (1 Dec 2023 to 30 Sep 2026) = 1.8% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 39 ÷ 1.8 = 21.7 months → Jul 2028. This is an estimate, not a date from the builder or RERA.
Pace between filings = (61% − 50%) ÷ 9 months = 1.2% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-14.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
16 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Building plan | BMRDA - Bangalore Metropolitan Region Development Authority · No. APA/CC/344/2023-24 · dated 2023-11-10 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion | Special Deputy Commissioner Bangalore District · No. ALN(A)(A) SR 198-2006-07 · dated 2008-10-15 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Change of Land Use | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| District Magistrate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BMRDA - Bangalore Metropolitan Region Development Authority · No. APA/CC/344/2023-24 · dated 10 Nov 2023
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Pollution board consent · KSPCBNot on RERA yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 21 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Shriram Sapphire RERA complaints and orders
3 complaints as on Source (rera.karnataka.gov.in) (opens in a new tab)
| Complaint ref | Filed | Subject | Status | Source |
|---|---|---|---|---|
| 01171/2025 | 15 Sep 2025 | The Builder Is Raising Demand for Payment without following the Signed Sale AGreement and Charging Interest unfairly | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00497/2025 | 17 Mar 2025 | Refund the entire booking amount of Rs. 6,17,999/- paid towards the booking of Apartment No. A.05.03 with interest on the said booking amount as per RERA act | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00405/2024 | 22 Apr 2024 | Paid 4 Lakh at EOI, Requested for Refund | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Shriram Properties Limited
- Promoter type
- Company
- Projects on this site
- 4
- RERA complaints against promoter
- 123
- Company number (CIN)
- U72200TN2000PLC044560
From Karnataka RERA, as collected so far (21 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Shriram Properties Limited’s RERA recordShriram Properties Limited delivery record
- 4Projects in Bengaluru on RERA4 approved registrations under Shriram Properties Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 1,092Homes registeredAs stated in each registrations.
- 123RERA complaints13 open, 110 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 112.6Complaints per 1,000 homes123 complaints ÷ 1,092 homes in its 4 registrations on Karnataka RERA in Bengaluru.
What the complaints are about
123 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Nov 2023
- 14 Oct 2026Quarterly update filed for Q2 2026-27: 61% built, 414 of 414 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 13 Jul 2026Quarterly update filed for Q1 2026-27: 56% built, 414 of 414 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Apr 2026Quarterly update filed for Q4 2025-26: 53% built, 414 of 414 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 6 Feb 2026Quarterly update filed for Q3 2025-26: 50% built, 414 of 414 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Sep 2025Complaint 01171/2025 filed with RERA: “The Builder Is Raising Demand for Payment without following the Signed Sale AGreement and Charging Interest unfairly” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 17 Mar 2025Complaint 00497/2025 filed with RERA: “Refund the entire booking amount of Rs. 6,17,999/- paid towards the booking of Apartment No. A.05.03 with interest on the said booking amount as per RERA act” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 22 Apr 2024Complaint 00405/2024 filed with RERA: “Paid 4 Lakh at EOI, Requested for Refund” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 9 Feb 2024Registered with Karnataka RERA (PRM/KA/RERA/1251/310/PR/090224/006616); completion date 5 Nov 2028 Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Dec 2023Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 10 Nov 2023Building plan approved by BMRDA - Bangalore Metropolitan Region Development Authority (No. APA/CC/344/2023-24) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Shriram Sapphire FAQs
What is Shriram Sapphire and where is it located?
Shriram Sapphire is a residential project in Bommasandra, Bengaluru South, PIN code 560099, developed by Shriram Properties Limited.
How many homes does Shriram Sapphire have?
The project has 414 homes across 6 towers, each up to 8 floors.
What home types are available in Shriram Sapphire?
The project offers 188 two-bedroom homes with carpet area from 635 to 710 sq ft, and 226 three-bedroom homes with carpet area from 669 to 857 sq ft.
When will Shriram Sapphire be completed?
The completion date on RERA is 5 November 2028.
What is the construction progress of Shriram Sapphire?
As of Q2 2026-27 (quarter ended 30 September 2026), the project is 61% complete.
How many homes in Shriram Sapphire are booked?
As of Q2 2026-27, all 414 homes are in the booking table and booked.
What is the RERA registration number for Shriram Sapphire?
The RERA registration number is PRM/KA/RERA/1251/310/PR/090224/006616, registered on 9 February 2024.
Are there RERA complaints on Shriram Sapphire?
There are 3 RERA complaints on this project.
What is the track record of Shriram Properties Limited?
The builder has 8 projects in our Bengaluru RERA records and 123 RERA complaints against it across all projects.
Who is the escrow bank for Shriram Sapphire?
HDFC is the escrow bank for this project.
Written by AI from the RERA record above on 21 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Shriram Sapphire
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Shriram Properties Limited? Review the builder.
Reviews of Shriram Properties Limited by verified buyers
No verified reviews of Shriram Properties Limited yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Sowmya SkylaSowmya Infra Projects | 0.6 km | 68 | Dec 2026 | 91% | 0 | Not collected |
| SGK Sai Sonna KodumSGK Infra And Developers | 0.6 km | 64 | Jun 2027extended | 90% | 0 | Not collected |
| Vasuki VallabhaSri Lakshmi Vallabha Constructions | 0.9 km | 32 | Dec 2027 | 88% | 0 | Not collected |
| VaradSatyam Builders & Developers | 1.1 km | 91 | Dec 2027 | 83% | 0 | Not collected |
| A B AnanthaAmaravathi Builders | 1.2 km | 32 | Jan 2027 | 84% | 0 | Not collected |
| Navakruthi Garden BayV Rajagopal Reddy | 1.2 km | 96 | Dec 2028 | 75% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 21 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/310/PR/090224/006616.
- RERA record last checked: 21 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 21 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Bommasandra
Bommasandra, Electronic City Phase 2Under constructionRERA registeredBuyers’ group openVasuki Vallabha
by Sri Lakshmi Vallabha Constructions
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 854 – 1,174 sq ft
- Dec 2027
32 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Vasuki Vallabha
Andapura, BommasandraUnder constructionRERA registeredBuyers’ group openNavakruthi Garden Bay
by V Rajagopal Reddy
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 712 – 1,079 sq ft
- Dec 2028
96 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Navakruthi Garden Bay
Andhapura, BommasandraUnder constructionRERA registeredBuyers’ group openMahendra Solterra Aarya Phase-2
by Mahendra Homes
Price: Price on requestGet brochure & price →
- 3 BHK
- 867 – 1,289 sq ft
- Dec 2030
522 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Mahendra Solterra Aarya Phase-2