Shriram Southern Crest

1, 2 & 3 BHK apartments by Shriprop Projects Private Limited · Jaranganahalli, JP Nagar, Bengaluru

Jaranganahalli, JP Nagar, BengaluruOpen on Google Maps (opens in a new tab)

  • Under construction
  • RERA registered
  • RERA not updated: completion promised Oct 2026; no extension or completion filed
  • residential

by Shriprop Projects Private Limited

Price: Price on request

Get brochure, floor plans & price

Brochure, floor plans and price list for Shriram Southern Crest

Builders share their brochure, floor plans and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Project summary

Shriram Southern Crest is a residential project by Shriprop Projects Private Limited in Jaranganahalli, Bengaluru with 826 homes, registered with Karnataka RERA. The completion date on RERA is 21 Oct 2026. It is registered in 2 phases.

Facts collected on 15 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.

Shriram Southern Crest buyers’ group: join to ask for a group price

No one has joined yet. Be one of the first 10 buyers in this group — the founding members.

Join free. When enough buyers have joined, our agent partner asks Shriprop Projects Private Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.

  1. Gathering buyers
  2. Talking to the builder
  3. Group offer
  4. Group site visit
  5. Booking

0 buyers have joined · 0 committed

Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.

Join the Shriram Southern Crest buyers’ groupHow group buying works

See it for yourself

Visit the site with our team, or get a call to clear your questions. Free, no obligation.

Key facts: home types, towers, land and possession

Updated on 15 Oct 2026
Home types
1 BHK, 2 BHK, 3 BHK
Carpet area
694 – 2,406 sq ft
Towers
7
Floors
18
Total homes
826
Land
7.45 acres
Possession (extended)
Oct 2026
Built (RERA update)
Not found in public records yet: construction progress

Shriram Southern Crest RERA number and registration details

RERA number
PRM/KA/RERA/1251/310/PR/171014/000364
Registered on
14 Oct 2017
Promised completion
21 Jan 2025
Extended to
21 Oct 2026
RERA status
New launch
Homes booked
Not found in public records yet: homes booked
Price
Not found in public records yet: price
Project type
Residential

2 RERA registrations (one per phase) are shown together on this page; dates above are the latest across phases.

Phases and RERA numbers

PhaseRERA numberPromised completionHomesStatusSource
Main registrationPRM/KA/RERA/1251/310/PR/171014/00036430 Jun 2021Extended to 30 Mar 2023676Under constructionSource (rera.karnataka.gov.in) (opens in a new tab)
Phase -2PRM/KA/RERA/1251/310/PR/200310/00333121 Jan 2025Extended to 21 Oct 2026150New launchSource (rera.karnataka.gov.in) (opens in a new tab)

Towers and blocks (RERA filing)

TowerPhaseFloorsBasementsHomes
AMain registration173140
BMain registration16358
CMain registration173140
Tower APhase -21838
Tower BPhase -21838
Tower CPhase -21838
Tower DPhase -217051

A dash (—) means the filing did not state that value.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Summary in plain English

Shriram Southern Crest is a residential project by Shriprop Projects Private Limited in Jaranganahalli, Bengaluru South. The project has 826 homes across 2 registrations: the main registration with 676 homes in 3 towers (completion date 30 March 2023) and Phase 2 with 150 homes in 4 towers (completion date 21 October 2026).

Written by AI from the RERA record above on 13 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.

Open space, home loans, escrow and other details

Open space
Not found in public records yet: open space
Water and power
Not found in public records yet: water and power
Home loans: approved banks
Not found in public records yet: bank approvals
Payment plans
Not found in public records yet: payment plans
Maintenance
Not found in public records yet: maintenance
Car parking
Not found in public records yet: car parking charge
Escrow bank (RERA) · Main registration
YES BANK, Kasturba Road, Bangalore
Escrow bank (RERA) · Phase -2
YES BANK, Kasturba Road, Bangalore

Amenities

Not found in public records yet: amenities

Shriram Southern Crest location and address

Address
Sy. Nos. 39, 40, 41 & 42/3A, Municipal No.243/254/41, 1 to 9/83/93 to 101 of Jaranganahalli Village, Uttarahalli Hobli, Bangalore South Taluk, Bangalore District, Karnataka
Village (RERA)
Jaranganahalli
Locality
JP NagarAlso known as J P Nagar, Jayaprakash Nagar
PIN code
560020
City
Bengaluru
State
Karnataka
Coordinates
12.90562, 77.57202

Distances to landmarks

Not found in public records yet: landmarks

About JP Nagar

Not found in public records yet: locality facts

Commute times to tech parks and the airport

As on 5 Oct 2026
ToStraight linePeak-hour drive (estimate)
KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab)8.07 kmapprox. 33 min
Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab)11.84 kmapprox. 48 min
Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab)12.01 kmapprox. 49 min
Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab)16.67 kmapprox. 68 min
ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab)20.14 kmapprox. 82 min
Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab)35.81 kmapprox. 145 min
How we calculate

Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.

Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.

Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this

Schools and hospitals nearby

As on 5 Oct 2026

Within 2 km

  • 61Schools and colleges44 schools, 10 colleges, 7 kindergartens
  • 75Hospitals and clinics39 hospitals, 36 clinics

Nearest schools and colleges

  • Shreyas School Jaraganahalli, Jaragana Halli 1 · 0.31 km
  • New Era Primary & High School · 0.39 km
  • Aswad Day Care · 0.43 km

Nearest hospitals and clinics

  • R.R. Hospital and Trauma Centre · 0.21 km
  • Bengaluru City Hospital · 0.26 km
  • Banashankari Heart Clinic · 0.46 km

Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Nearest metro station and railway

As on 5 Oct 2026
  • Jaya Prakash Nagar (ಜೆಪಿ ನಗರ)Open now — nearest operating metro station0.24 km
  • Nayandahalli (ನಾಯಂಡಹಳ್ಳಿ)Nearest railway station6.79 km

Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Lake and lake-buffer check

As on 5 Oct 2026

The nearest mapped lake is Sarakki Kere, 779 m from the project’s RERA map point.

The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.

The buffer rule

Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.

Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this

Satellite time-lapse of the site

Satellite photos load when you scroll to them.

Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.

Sources:Source (livingatlas.arcgis.com) (opens in a new tab)

Shriram Southern Crest home types and carpet areas

Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.

Get brochure, floor plans & price

Brochure, floor plans and price list for Shriram Southern Crest

Builders share their brochure, floor plans and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Home typeCarpet areaHomes
1 BHK694 sq ft2
2 + study970 – 994 sq ft119
2 BHK892 sq ft142
3 + study1,340 sq ft36
3 BHK1,219 sq ft104
Apartments1,000 – 1,083 sq ft413
Penthouse1,760 – 2,406 sq ft10

Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).

We have not collected floor-plan drawings; the builder’s sales team can share them.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Shriram Southern Crest possession date and construction status

  • Phase -2100%

    as on · 75 of 150 homes booked

Timeline

  1. 14 Jan 2017Main registration: Project start date given to RERA
  2. 14 Oct 2017Main registration: Registered with Karnataka RERA
  3. 22 Jan 2020Phase -2: Project start date given to RERA
  4. 10 Mar 2020Phase -2: Registered with Karnataka RERA
  5. 30 Jun 2021Main registration: Completion date given at registration
  6. 30 Mar 2022Main registration: Covid Extension: completion date moved to this date
  7. 30 Mar 2023Main registration: Section 6 Extension: completion date moved to this date
  8. 21 Jan 2025Phase -2: Completion date given at registration
  9. 21 Oct 2025Phase -2: Covid Extension: completion date moved to this date
  10. 21 Oct 2026Phase -2: Section 6 Extension: completion date moved to this date

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Approvals and documents checklist

ApprovalAuthoritySource
Building plan (Main registration)BBMP - Bruhat Bengaluru Mahanagara PalikeSource (rera.karnataka.gov.in) (opens in a new tab)
Building plan (Phase -2)BBMP - Bruhat Bengaluru Mahanagara PalikeSource (rera.karnataka.gov.in) (opens in a new tab)

Documents uploaded to RERA (Main registration)

As on 15 Oct 2026
  • Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Commencement certificate · Permission to start buildingNot on RERA yet
  • Environment clearance · SEIAA KarnatakaNot on RERA yet
  • Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
  • Pollution board consent · KSPCBNot on RERA yet
  • Water and sewerage · BWSSBNot on RERA yet
  • Electricity · BESCOMNot on RERA yet
  • Height clearance · Airports Authority of IndiaNot on RERA yet
  • Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion

From the documents the promoter uploaded to Karnataka RERA, collected 15 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). Each phase is registered separately; this list is for the phase named above. The project page on RERA lists each upload.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Shriram Southern Crest RERA complaints and orders

20 complaints as on Source (rera.karnataka.gov.in) (opens in a new tab)

20 rows: rera complaints. Scroll inside the table to see them all.

Complaint refFiledSubjectStatusSource
00578/20253 Apr 2025Compensation for delay of 2 years six months in giving possession of the said flat no. A - 1401 as per clause 6 of the Construction AgreementDisposedSource (rera.karnataka.gov.in) (opens in a new tab)
00866/202410 Sep 2024Interest on Delay PeriodDisposedSource (rera.karnataka.gov.in) (opens in a new tab)
00816/202430 Aug 2024Refund and supportings for payment not being providedDisposedSource (rera.karnataka.gov.in) (opens in a new tab)
00793/202426 Aug 2024Interest on delay periodDisposedSource (rera.karnataka.gov.in) (opens in a new tab)
00779/202422 Aug 2024interest on delay period in handing over the resedential unitDisposedSource (rera.karnataka.gov.in) (opens in a new tab)
00736/202417 Aug 2024Interest on delay periodDisposedSource (rera.karnataka.gov.in) (opens in a new tab)
00734/202416 Aug 2024Interest on delay periodDisposedSource (rera.karnataka.gov.in) (opens in a new tab)
00538/20244 Jun 2024Delay in handing over the possession of our flat number C1408DisposedSource (rera.karnataka.gov.in) (opens in a new tab)
00518/202429 May 2024Delay in Delivery of FlatDisposedSource (rera.karnataka.gov.in) (opens in a new tab)
00490/202427 May 2024Delay in Handing over of our Flat No. C1407DisposedSource (rera.karnataka.gov.in) (opens in a new tab)
00125/202429 Jan 2024Refund of the booking amount with compensationDisposedSource (rera.karnataka.gov.in) (opens in a new tab)
01353/20235 Sep 2023Compensation for delay in handing over the flatDisposedSource (rera.karnataka.gov.in) (opens in a new tab)
01332/20234 Sep 2023Delay CompensationDisposedSource (rera.karnataka.gov.in) (opens in a new tab)
01292/202325 Aug 2023Compensation for Delay in handoverDisposedSource (rera.karnataka.gov.in) (opens in a new tab)
00048/202310 Jan 2023Non-Refund of amount paid as booking amountDisposedSource (rera.karnataka.gov.in) (opens in a new tab)
CMP/221112/001025412 Nov 2022paid 1 Lakh Rs for blocking the unit only.not signed any agreement with the companyDisposedSource (rera.karnataka.gov.in) (opens in a new tab)
CMP/221020/001012220 Oct 2022Interest not received from the builder for the delayed deliveryDisposedSource (rera.karnataka.gov.in) (opens in a new tab)
CMP/220819/000991619 Aug 2022Inordinate delay in Property handoverDisposedSource (rera.karnataka.gov.in) (opens in a new tab)
CMP/220609/00096089 Jun 2022Handover pending even post RERA deadline (after revision for Covid)DisposedSource (rera.karnataka.gov.in) (opens in a new tab)
CMP/220521/000950521 May 2022Delivery Date Expiry, No update on status and therefore incurred financial loss to buyer.DisposedSource (rera.karnataka.gov.in) (opens in a new tab)

Court and consumer cases

Not found in public records yet: court cases

We list case numbers, courts and outcomes only — never names of private individuals.

About Shriprop Projects Private Limited

Promoter type
Company
Projects on this site
1
RERA complaints against promoter
20
Company number (CIN)
U45202KA2008PTC046145

From Karnataka RERA, as collected so far (15 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.

Shriprop Projects Private Limited’s RERA record

Shriprop Projects Private Limited delivery record

As on 15 Oct 2026

What the complaints are about

  • Delay in possession or delay interest15
  • Refund of booking or other money3
  • Registration, sale deed or agreement1
  • Other1

20 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

What’s changed since Jan 2017

As on 15 Oct 2026
  1. 21 Oct 2026Phase -2: Completion date extended to 21 Oct 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
  2. 9 Jul 2026Phase -2: Quarterly update filed for Q1 2026-27: 100% built, 75 of 75 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  3. 13 Apr 2026Phase -2: Quarterly update filed for Q4 2025-26: 100% built, 75 of 75 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  4. 19 Feb 2026Phase -2: Quarterly update filed for Q3 2025-26: 100% built, 75 of 75 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  5. 3 Apr 2025Complaint 00578/2025 filed with RERA: “Compensation for delay of 2 years six months in giving possession of the said flat no. A - 1401 as per clause 6 of the Construction Agreement” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  6. 10 Sep 2024Complaint 00866/2024 filed with RERA: “Interest on Delay Period” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  7. 30 Aug 2024Complaint 00816/2024 filed with RERA: “Refund and supportings for payment not being provided” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  8. 26 Aug 2024Complaint 00793/2024 filed with RERA: “Interest on delay period” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  9. 22 Aug 2024Complaint 00779/2024 filed with RERA: “interest on delay period in handing over the resedential unit” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  10. 17 Aug 2024Complaint 00736/2024 filed with RERA: “Interest on delay period” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  11. 16 Aug 2024Complaint 00734/2024 filed with RERA: “Interest on delay period” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  12. 4 Jun 2024Complaint 00538/2024 filed with RERA: “Delay in handing over the possession of our flat number C1408” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  13. 29 May 2024Complaint 00518/2024 filed with RERA: “Delay in Delivery of Flat” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  14. 27 May 2024Complaint 00490/2024 filed with RERA: “Delay in Handing over of our Flat No. C1407” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  15. 29 Jan 2024Complaint 00125/2024 filed with RERA: “Refund of the booking amount with compensation” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  16. 5 Sep 2023Complaint 01353/2023 filed with RERA: “Compensation for delay in handing over the flat” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  17. 4 Sep 2023Complaint 01332/2023 filed with RERA: “Delay Compensation” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  18. 25 Aug 2023Complaint 01292/2023 filed with RERA: “Compensation for Delay in handover” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  19. 30 Mar 2023Main registration: Completion date extended to 30 Mar 2023 Source (rera.karnataka.gov.in) (opens in a new tab)
  20. 10 Jan 2023Complaint 00048/2023 filed with RERA: “Non-Refund of amount paid as booking amount” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  21. 12 Nov 2022Complaint CMP/221112/0010254 filed with RERA: “paid 1 Lakh Rs for blocking the unit only.not signed any agreement with the company” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  22. 20 Oct 2022Complaint CMP/221020/0010122 filed with RERA: “Interest not received from the builder for the delayed delivery” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  23. 19 Aug 2022Complaint CMP/220819/0009916 filed with RERA: “Inordinate delay in Property handover” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  24. 9 Jun 2022Complaint CMP/220609/0009608 filed with RERA: “Handover pending even post RERA deadline (after revision for Covid)” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  25. 21 May 2022Complaint CMP/220521/0009505 filed with RERA: “Delivery Date Expiry, No update on status and therefore incurred financial loss to buyer.” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  26. 10 Mar 2020Phase -2: Registered with Karnataka RERA (PRM/KA/RERA/1251/310/PR/200310/003331); completion date 21 Jan 2025 Source (rera.karnataka.gov.in) (opens in a new tab)
  27. 22 Jan 2020Phase -2: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
  28. 14 Oct 2017Main registration: Registered with Karnataka RERA (PRM/KA/RERA/1251/310/PR/171014/000364); completion date 30 Jun 2021 Source (rera.karnataka.gov.in) (opens in a new tab)
  29. 14 Jan 2017Main registration: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)

Newest first. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.

Home loan EMI calculator

No listed price found — enter one to try.

Example only — use your bank’s quote.

Monthly EMI
—
Down payment
—
Loan amount
—
Total interest
—

A calculation only, from the numbers you enter — not a loan offer.

All-in cost: GST, registration and other charges

The calculator loads when you scroll to it.

Assumptions
  • Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
  • GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
  • Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
  • Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
  • Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.

How we calculate this

Shriram Southern Crest FAQs

What is the completion date for Shriram Southern Crest?

The main registration has a completion date of 30 March 2023, with 2 extensions already granted. Phase 2 has a completion date of 21 October 2026, also with 2 extensions granted.

How many homes are in Shriram Southern Crest?

The project has 826 homes total: 676 homes in the main registration and 150 homes in Phase 2.

What home types are available in the main registration?

Home types include 1 BHK (694 sq ft carpet area), 2 BHK (892 sq ft), 3 BHK (1,219 sq ft), apartments (1,083 sq ft), 2 + Study (994 sq ft), 3 + Study (1,340 sq ft), and penthouses (1,760 to 2,406 sq ft).

What home types are available in Phase 2?

Phase 2 offers apartments (1,000 sq ft carpet area), 2 BHK (892 sq ft), 3 BHK (1,219 sq ft), 2 + Study (970 to 994 sq ft), and 3 + Study (1,340 sq ft).

What is the RERA registration number for Shriram Southern Crest?

The main registration number is PRM/KA/RERA/1251/310/PR/171014/000364 (registered 14 October 2017) and Phase 2 is PRM/KA/RERA/1251/310/PR/200310/003331 (registered 10 March 2020).

How many RERA complaints have been filed on Shriram Southern Crest?

There are 20 complaints on the project: 17 on the main registration and 3 on Phase 2.

What is the construction status of Phase 2?

As of Q1 2026-27 (quarter ended 30 June 2026), Phase 2 is 100% complete with 75 homes booked.

Where is Shriram Southern Crest located?

The project is in Jaranganahalli, Bengaluru South taluk, Bengaluru Urban district, PIN code 560020.

Does the project have an escrow account?

Yes, both the main registration and Phase 2 have escrow accounts with YES BANK.

How many other projects does Shriprop Projects Private Limited have on RERA records?

Shriprop Projects Private Limited has 1 other project on the Bengaluru RERA records, and 20 complaints have been filed against the builder across all projects.

Written by AI from the RERA record above on 13 Oct 2026. Answers use only that record; check them against the source before you decide.

Questions about Shriram Southern Crest

No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.

Bought a home from Shriprop Projects Private Limited? Review the builder.

Reviews of Shriprop Projects Private Limited by verified buyers

No verified reviews of Shriprop Projects Private Limited yet. If you bought a home from them, your review helps other buyers.

How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.

Similar projects within 5 km

ProjectDistanceHomesPossession (RERA)BuiltComplaintsPrice
Vaishnavi At-One Krishna BrindavanVaishnavi At-One Infrastructure LLP0.7 km359Jun 203028%0Not collected
AiekyaAvaneesh Ventures1.2 km18Dec 2027100%0Not collected
Adarsh Stratuss Phase 1M/s Adarsh Developers1.5 km108Nov 2025extended75%15Not collected
StraatosphereEverfine Buildcon LLP1.6 km32Nov 202846%0Not collected
Shiva SakthiShivashakthi Builders And Developers1.7 km56Mar 202745%0Not collected
MGR Windsor GardensSri Manjunatha Developers2 km36Dec 2025—0Not collected

Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sources and last checked dates

  1. Karnataka RERA — project register (search by the registration number) (opens in a new tab)

Collected on 15 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.

How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration numbers: PRM/KA/RERA/1251/310/PR/171014/000364, PRM/KA/RERA/1251/310/PR/200310/003331.

  • RERA record last checked: 15 Oct 2026
  • Last change in the record (registration, quarterly filing or complaint): 13 Oct 2026

How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error