Sidvin Horizon By The Lake
20×30 plots by Sidvin Developers Private Limited · Nimbekayipura, Budigere Cross, Bengaluru
Nimbekayipura, Budigere Cross, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- plotted
by Sidvin Developers Private Limited
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Sidvin Horizon By The Lake at a glance
- Completion (RERA)Jul 2027Karnataka RERA
- Construction78% built · on pace for Feb 2027RERA filing to 30 Sep 2026; estimate from average pace
- RERA complaints (project)None listedKarnataka RERA · as on 16 Oct 2026
- Approvals filed3 of 9 on RERAKarnataka RERA uploads · 16 Oct 2026
- Nearest metroWhitefield (Kadugodi) · 6.51 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 70 min at peak17.19 km straight line · estimate
- Nearest lakeNimbekaipura Lake · 115 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Sidvin Horizon By The Lake is a plotted development by Sidvin Developers Private Limited in Nimbekayipura, Bengaluru with 29 plots, registered with Karnataka RERA. The completion date on RERA is 31 Jul 2027.
Facts collected on 16 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the developer pays us a commission.
Sidvin Horizon By The Lake buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Sidvin Developers Private Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the developer offers and book directly with the developer if you want to. Free for buyers. If you book through us, the developer pays us a commission.
- Gathering buyers
- Talking to the developer
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, plot size and timeline with us on a call; developers negotiate with them. Joining is free and never obliges you to buy.
Join the Sidvin Horizon By The Lake buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: plot sizes, approval, land and completion
- Plot sizes (feet)
- 20×30
- Plot area
- 524 – 1,721 sq ft
- Total plots
- 29
- Layout approved by
- BDA
- Land
- Not found in public records yet: land area
- Land conversion orders
- 5
- Completion (RERA)
- Jul 2027
- Development (RERA update)
- 78%
Plot sizes (RERA filing)
| Size (feet) | Area | Plots |
|---|---|---|
| 20×30 | 600 sq ft | 7 |
| Odd-sized (irregular) | varies | 22 |
Sizes as filed with RERA, converted from metres to feet (9.14 m = 30 ft, 12.19 m = 40 ft). Ask the developer which plots are still unsold.
Approving authority as filed: BDA - Bangalore Development Authority.
Land conversion orders (RERA filing)
| Survey no. | Converted for | Order | By |
|---|---|---|---|
| SY NO 39/1 | Residential | No. APP No 708379, 18 Dec 2024 | Deputy Commissioner, Bangalore Urban |
| SY NO 39/2 | Residential | No. APP No 708385, 18 Dec 2024 | Deputy Commissioner, Bangalore Urban |
| SY NO 39/7 | Residential | No. APP No 708387, 18 Dec 2024 | Deputy Commissioner, Bangalore Urban |
| SY NO 39/8 | Residential | No. APP No 708386, 18 Dec 2024 | Deputy Commissioner, Bangalore Urban |
| SY NO 39/9 | Residential | No. APP NO 708389, 18 Dec 2024 | Deputy Commissioner, Bangalore Urban |
RERA does not cover each plot’s khata. Ask the developer for the khata and title documents and have a lawyer check them before paying an advance.
Sidvin Horizon By The Lake RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/446/PR/040925/008057
- Registered on
- 4 Sep 2025
- Promised completion
- 31 Jul 2027
- Extended to
- No extension recorded
- RERA status
- Under construction
- Plots booked
- Not found in public records yet: plots booked
- Price
- Not found in public records yet: price
- Project type
- Plotted
Summary in plain English
Sidvin Horizon By The Lake is a plotted layout by Sidvin Developers Private Limited in Nimbekayipura, Bengaluru East, with 29 plots. The layout is approved by BDA and has 5 land conversion orders. According to RERA, the completion date is 31 July 2027.
Written by AI from the RERA record above on 16 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, loans, escrow and other details
- Open space
- Not found in public records yet: open space
- Water and power
- Water source filed with RERA: BoreWell,Local Authority
- Plot loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- Canara Bank, HOSKOTE
- Building plan (RERA)
- BDA - Bangalore Development Authority · No. BDA/TPA/PRL/1060/2024-25 · dated 29 May 2025
- Project cost declared to RERA
- ₹10.7 Cr
Amenities
Sidvin Horizon By The Lake location and address
- Address
- SY NO 39/1,39/2,39/7,39/8 nd 39/9 of Nimbekayipura Village , Bidarahalli Hobli,Bangalore East Taluk , Bengaluru East , Bengaluru Urban, Karnataka - 560049
- Village (RERA)
- Nimbekayipura
- Locality
- Budigere CrossAlso known as Budigere
- PIN code
- 560049
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.05424, 77.75512
Distances to landmarks
Not found in public records yet: landmarksAbout Budigere Cross
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 7.64 km | approx. 31 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 14.67 km | approx. 59 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 16.58 km | approx. 67 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 17.19 km | approx. 70 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 21.81 km | approx. 88 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 24.76 km | approx. 100 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 8Schools and colleges8 schools, 0 colleges, 0 kindergartens
- 0Hospitals and clinics0 hospitals, 0 clinics
Nearest schools and colleges
- Vibgyor School Kadugodi · 1.09 km
- National Public School ITPL · 1.61 km
- One World International School · 1.68 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Whitefield (Kadugodi) (ವೈಟ್ಫೀಲ್ಡ್ (ಕಾಡುಗೋಡಿ))Open now — nearest operating metro station6.51 km
- Whitefield (ವೈಟ್ಫೀಲ್ಡ್)Nearest railway station6.47 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Nimbekaipura Lake, 115 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Nimbekaipura Lake on OpenStreetMap (opens in a new tab) 115 m
- Konadasapura lake on OpenStreetMap (opens in a new tab) 647 m
- Katamanallur Lake on OpenStreetMap (opens in a new tab) 888 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Sidvin Horizon By The Lake layout plan and plot types as filed
Documents the developer uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Brochure

BrochureFull PDF on RERA
Approved layout plan2 files

Approved Layout Plan/Demarcation PlanFull PDF on RERA 
sidvin financial reports_compressed (1).pdfFull PDF on RERA
| Plot type (as filed) | Area | Plots |
|---|---|---|
| 9.14 mtrs x 6.10 mtrs | — | 7 |
| Odd-shaped plots | — | 22 |
Plot types and counts as filed with Karnataka RERA.
We have not collected the layout plan drawing; the developer’s sales team can share it.
Sidvin Horizon By The Lake completion date and development status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
Timeline
- 1 Jul 2025Project start date given to RERA
- 4 Sep 2025Registered with Karnataka RERA
- 31 Jul 2027Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Feb 2027 — about 6 months before the completion date on RERA (31 Jul 2027).
At the pace between the 4 quarterly filings we have (40% → 78% in 9 months), it would be around Mar 2027 — about 5 months before the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Developed | Plots booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 15 Oct 2026 | 78% | — |
| Q1 2026-27to 30 Jun 2026 | 15 Jul 2026 | 72% | — |
| Q4 2025-26to 31 Mar 2026 | 15 Apr 2026 | 57% | — |
| Q3 2025-26to 31 Dec 2025 | 31 Mar 2026 | 40% | — |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 78% ÷ 15 months (1 Jul 2025 to 30 Sep 2026) = 5.2% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 22 ÷ 5.2 = 4.2 months → Feb 2027. This is an estimate, not a date from the builder or RERA.
Pace between filings = (78% − 40%) ÷ 9 months = 4.2% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Layout plan | BDA - Bangalore Development Authority · No. BDA/TPA/PRL/1060/2024-25 · dated 2025-05-29 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (5 orders) | Deputy Commissioner, Bangalore Urban · No. APP No 708379 and 4 more · dated 2024-12-18 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan/Demarcation Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| NOC from ESCOMs | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| NOC for Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BDA - Bangalore Development Authority · No. BDA/TPA/PRL/1060/2024-25 · dated 29 May 2025
- Commencement certificate · Permission to start buildingNot on RERA yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBNot on RERA yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 16 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Sidvin Horizon By The Lake RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Sidvin Developers Private Limited
- Promoter type
- Company
- Projects on this site
- 1
- RERA complaints against promoter
- 0
- Company number (CIN)
- U45400KA2013PTC070369
From Karnataka RERA, as collected so far (16 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Sidvin Developers Private Limited’s RERA recordSidvin Developers Private Limited delivery record
- 1Projects in Bengaluru on RERA1 approved registration under Sidvin Developers Private Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 29Plots registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 plots0 complaints ÷ 29 plots in its 1 registration on Karnataka RERA in Bengaluru.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since May 2025
- 15 Oct 2026Quarterly update filed for Q2 2026-27: 78% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Quarterly update filed for Q1 2026-27: 72% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Quarterly update filed for Q4 2025-26: 57% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 31 Mar 2026Quarterly update filed for Q3 2025-26: 40% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 4 Sep 2025Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/040925/008057); completion date 31 Jul 2027 Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Jul 2025Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 29 May 2025Building plan approved by BDA - Bangalore Development Authority (No. BDA/TPA/PRL/1060/2024-25) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Plot loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
Sidvin Horizon By The Lake FAQs
What is Sidvin Horizon By The Lake?
It is a plotted layout in Nimbekayipura, Bengaluru East with 29 plots, developed by Sidvin Developers Private Limited.
How many plots are in this layout?
The layout has 29 plots in total.
What are the plot sizes available?
7 plots are 20×30 feet (600 sq ft each). The remaining 22 plots are odd-sized; their dimensions are not in the RERA record.
What is the RERA registration number for Sidvin Horizon By The Lake?
The project is registered as PRM/KA/RERA/1251/446/PR/040925/008057, registered on 4 September 2025.
When is the layout expected to be completed?
According to RERA, the completion date is 31 July 2027.
Which authority approved this layout?
The layout was approved by BDA (Bangalore Development Authority).
How many land conversion orders are there for this project?
There are 5 land conversion orders for this layout.
What is the development progress of the layout?
As of 30 September 2026 (Q2 2026-27), the layout is 78% developed.
Are there any RERA complaints against this project or developer?
There are no RERA complaints on this project or against Sidvin Developers Private Limited.
What other projects does the developer have on RERA record?
Sidvin Developers Private Limited has 3 projects in the Bengaluru RERA records.
Written by AI from the RERA record above on 16 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Sidvin Horizon By The Lake
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a plot from Sidvin Developers Private Limited? Review the developer.
Reviews of Sidvin Developers Private Limited by verified buyers
No verified reviews of Sidvin Developers Private Limited yet. If you bought a plot from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the developer may reply.
Similar projects within 5 km
| Project | Distance | Plots | Completion (RERA) | Developed | Complaints | Price |
|---|---|---|---|---|---|---|
| Sidvin Horizen By The Lake 2VRK Ventures Private Limited | 0.1 km | 73 | Dec 2027 | 83% | 0 | Not collected |
| MelroseArk Global Estates | 0.5 km | 79 | Jul 2026 | — | 0 | Not collected |
| Bren CosmoBREN Corporation Pvt Ltd | 0.7 km | 203 | Jan 2026 | 100% | 1 | Not collected |
| Signature Tulips UptownM/S KVR Sowbhagya Properties | 1.4 km | 182 | May 2026 | — | 0 | Not collected |
| Konig Fortune CountyKonig Homes | 2.5 km | 146 | Mar 2028 | 77% | 0 | Not collected |
| Sidvin SymphonyAvyanhp Sharayu | 3 km | 157 | Mar 2026 | 100% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the developer’s own website where we found one.
Sources and last checked dates
Collected on 16 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/446/PR/040925/008057.
- RERA record last checked: 16 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 16 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the developer’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Budigere Cross
Nimbekayipura, Budigere CrossUnder constructionRERA registeredBuyers’ group openSidvin Horizen By The Lake 2
by VRK Ventures
Price: Price on requestGet brochure & price →
- 30×50, 30×60
- 1,085 – 2,841 sq ft plots
- Approved by BDA
- Dec 2027
73 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Sidvin Horizen By The Lake 2
Nimbekaipura, Budigere CrossUnder constructionRERA registeredBuyers’ group openMelrose
by Ark Global Estates
Price: Price on requestGet brochure & price →
- 20×40, 30×40, 30×50 +1 more
- 799 – 2,713 sq ft plots
- Approved by BDA
- Jul 2026
RERA not updated since promised Jul 2026 · 79 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Melrose- Nimbekaipura, Budigere Cross© Esri, Maxar, Earthstar GeographicsReady to moveRERA registeredBuyers’ group open
Bren Cosmo
by BREN Corporation
Price: Price on requestGet brochure & price →
- 30×50, 30×60, 40×60 +1 more
- 600 – 21,263 sq ft plots
- Approved by BDA
- Jan 2026
203 plots · 1 RERA complaint
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Bren Cosmo