Signature Tulips Uptown

30×40, 30×45 +6 more plots by M/S KVR Sowbhagya Properties · part Huskur, Budigere Cross, Bengaluru

part Huskur, Budigere Cross, BengaluruOpen on Google Maps (opens in a new tab)

  • Under construction
  • RERA registered
  • RERA not updated: completion promised May 2026; no extension or completion filed
  • plotted

by M/S KVR Sowbhagya Properties

Price: Price on request

Get brochure, layout plan & price

Brochure, layout plan and price list for Signature Tulips Uptown

Developers share their brochure, layout plan and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the developer pays us a commission. How we earn

Project summary

Signature Tulips Uptown is a plotted development by M/S KVR Sowbhagya Properties in part Huskur, Bengaluru with 182 plots, registered with Karnataka RERA. The completion date on RERA is 22 May 2026.

Facts collected on 17 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the developer pays us a commission.

Signature Tulips Uptown buyers’ group: join to ask for a group price

No one has joined yet. Be one of the first 10 buyers in this group — the founding members.

Join free. When enough buyers have joined, our agent partner asks M/S KVR Sowbhagya Properties for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the developer offers and book directly with the developer if you want to. Free for buyers. If you book through us, the developer pays us a commission.

  1. Gathering buyers
  2. Talking to the developer
  3. Group offer
  4. Group site visit
  5. Booking

0 buyers have joined · 0 committed

Committed buyers have confirmed their budget, plot size and timeline with us on a call; developers negotiate with them. Joining is free and never obliges you to buy.

Join the Signature Tulips Uptown buyers’ groupHow group buying works

See it for yourself

Visit the site with our team, or get a call to clear your questions. Free, no obligation.

Key facts: plot sizes, approval, land and completion

Updated on 17 Oct 2026
Plot sizes (feet)
30×40, 30×45, 30×50, 40×40 +4 more
Plot area
794 – 6,588 sq ft
Total plots
182
Layout approved by
BMRDA
Land
Not found in public records yet: land area
Land conversion orders
8
Completion (RERA)
May 2026
Development (RERA update)
Not found in public records yet: development progress

Plot sizes (RERA filing)

Size (feet)AreaPlots
30×401,200 sq ft6
30×451,350 sq ft8
30×501,500 sq ft58
40×401,600 sq ft1
40×451,800 sq ft3
30×601,800 sq ft1
40×502,000 sq ft9
40×602,400 sq ft9
Odd-sized (irregular)varies87

Sizes as filed with RERA, converted from metres to feet (9.14 m = 30 ft, 12.19 m = 40 ft). Ask the developer which plots are still unsold.

Approving authority as filed: BMRDA - Bangalore Metropolitan Region Development Authority.

Land conversion orders (RERA filing)

Survey no.Converted forOrderBy
6/1ResidentialNo. BDS:ALN(E)(B)SR.36/2007-08, 18 Nov 2008Deputy Commissioner Bangalore District
6/1ResidentialNo. BDS:ALN(E)(B)SR.34/2007-08, 19 Nov 2008Deputy Commissioner Bangalore District
7/1ResidentialNo. BDS:ALN(E)(B)SR.33/2007-08, 4 Nov 2008Deputy Commissioner Bangalore District
68/1ResidentialNo. BDS:ALN(E)(B)SR.35/2007-08, 19 Nov 2008Deputy Commissioner Bangalore District
43/1ResidentialNo. BDS:ALN(E)(B)SR.30/2007-08, 19 Nov 2008Deputy Commissioner Bangalore District
43/2ResidentialNo. BDS:ALN(E)(B)SR.29/2007-08, 19 Nov 2008Deputy Commissioner Bangalore District
43/5ResidentialNo. BDS:ALN(EBK)SR.03/2020-21, 19 Aug 2020Deputy Commissioner Bangalore District
45/1ResidentialNo. BDS:ALN(E)(B)SR.31/2007-08, 19 Nov 2008Deputy Commissioner Bangalore District

RERA does not cover each plot’s khata. Ask the developer for the khata and title documents and have a lawyer check them before paying an advance.

Signature Tulips Uptown RERA number and registration details

RERA number
PRM/KA/RERA/1251/446/PR/020923/006236
Registered on
2 Sep 2023
Promised completion
22 May 2026
Extended to
No extension recorded
RERA status
Under construction
Plots booked
Not found in public records yet: plots booked
Price
Not found in public records yet: price
Project type
Plotted

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Summary in plain English

Signature Tulips Uptown is a plotted layout of 182 plots developed by M/S KVR Sowbhagya Properties in Huskur, Bengaluru East. The layout is approved by BMRDA with 8 land conversion orders. Completion is scheduled for 22 May 2026.

Written by AI from the RERA record above on 7 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.

Open space, loans, escrow and other details

Open space
Not found in public records yet: open space
Water and power
Water source filed with RERA: BoreWell
Plot loans: approved banks
Not found in public records yet: bank approvals
Payment plans
Not found in public records yet: payment plans
Maintenance
Not found in public records yet: maintenance
Car parking
Not found in public records yet: car parking charge
Escrow bank (RERA)
Bank of Baroda, Indiranagar
Building plan (RERA)
BMRDA - Bangalore Metropolitan Region Development Authority · No. H.P.A/LAO/45-2021-22 · dated 22 May 2023
Project cost declared to RERA
₹44.69 Cr

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Amenities

Not found in public records yet: amenities

Signature Tulips Uptown location and address

Address
sy.no.6/1-part, 6/2, 7/1 and 7/2, 68/1, 69-part of Huskur Village, & sy.no.43/1, 43/2, 43/3, 43/4, 43/5, 44/4, 45/1 part of Bendiganahalli village , Bidarahalli Hobli, Bangalore East Taluk. , Bengaluru East , Bengaluru Urban, Karnataka - 560049
Village (RERA)
part Huskur
Locality
Budigere CrossAlso known as Budigere
PIN code
560049
City
Bengaluru
State
Karnataka
Coordinates
13.06591, 77.75902

Distances to landmarks

Not found in public records yet: landmarks

About Budigere Cross

Not found in public records yet: locality facts

Commute times to tech parks and the airport

As on 5 Oct 2026
ToStraight linePeak-hour drive (estimate)
ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab)9 kmapprox. 36 min
Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab)15.2 kmapprox. 62 min
Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab)16.12 kmapprox. 65 min
Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab)17.92 kmapprox. 73 min
KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab)22.73 kmapprox. 92 min
Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab)26.11 kmapprox. 106 min
How we calculate

Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.

Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.

Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this

Schools and hospitals nearby

As on 5 Oct 2026

Within 2 km

  • 3Schools and colleges3 schools, 0 colleges, 0 kindergartens
  • 0Hospitals and clinics0 hospitals, 0 clinics

Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Nearest metro station and railway

As on 5 Oct 2026
  • Whitefield (Kadugodi) (ವೈಟ್‌ಫೀಲ್ಡ್ (ಕಾಡುಗೋಡಿ))Open now — nearest operating metro station7.8 km
  • Whitefield (ವೈಟ್‌ಫೀಲ್ಡ್)Nearest railway station7.73 km

Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Lake and lake-buffer check

As on 5 Oct 2026

The nearest mapped lake is Hosakote lake, 695 m from the project’s RERA map point.

The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.

The buffer rule

Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.

Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this

Satellite time-lapse of the site

Satellite photos load when you scroll to them.

Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.

Sources:Source (livingatlas.arcgis.com) (opens in a new tab)

Signature Tulips Uptown layout plan and plot types as filed

Documents the developer uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.

Brochure

Approved building plan

Approved layout plan2 files

Plot type (as filed)AreaPlots
Odd size—87
Plot size 9.14 x 12.19 mtrs—6
Plot size 9.14 x 13.72 mtrs—8
Plot size 9.14 x 15.24 mtrs—58
Plot size 9.14 x 18.29 mtrs—1
Plot size 12.19 x 12.19 mtrs—1
Plot size 12.19 x 13.72 mtrs—3
Plot size 12.19 x 15.24 mtrs—9
Plot size 12.19 x 18.29 mtrs—9

Plot types and counts as filed with Karnataka RERA.

We have not collected the layout plan drawing; the developer’s sales team can share it.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Signature Tulips Uptown completion date and development status

Not found in public records yet: construction progress

Timeline

  1. 22 May 2023Project start date given to RERA
  2. 2 Sep 2023Registered with Karnataka RERA
  3. 22 May 2026Completion date given at registration

Approvals and documents checklist

20 rows: approvals. Scroll inside the table to see them all.

ApprovalAuthoritySource
Layout planBMRDA - Bangalore Metropolitan Region Development Authority · No. H.P.A/LAO/45-2021-22 · dated 2023-05-22Source (rera.karnataka.gov.in) (opens in a new tab)
Land conversion (8 orders)Deputy Commissioner Bangalore District · No. BDS:ALN(E)(B)SR.36/2007-08 and 7 more · dated 2020-08-19Source (rera.karnataka.gov.in) (opens in a new tab)
Commencement Certificatescan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Electricity Permission Letterscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Water Permission Letterscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Layout Planscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Building/Plotting Planscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Section Of Building/Infrastructure Plan of Plottingscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Change of Land Usescan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
District Magistratescan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Conversion Certificate under section 95 of the KLR Act 1964scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
ESCOM/Electricityscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KWSSB/Waterscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approval/NOC under section 109 of KLR Act 1961scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approval/NOC under section 14 of the KTCP Actscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Fire Force Departmentscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Airport Authority of Indiascan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KSPCBscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
SEIAAscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
NOC in case of building proposals abutting to neighbouring propertiesscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)

Documents uploaded to RERA

As on 17 Oct 2026
  • Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BMRDA - Bangalore Metropolitan Region Development Authority · No. H.P.A/LAO/45-2021-22 · dated 22 May 2023
  • Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion

From the documents the promoter uploaded to Karnataka RERA, collected 17 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Signature Tulips Uptown RERA complaints

No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)

Court and consumer cases

Not found in public records yet: court cases

We list case numbers, courts and outcomes only — never names of private individuals.

About M/S KVR Sowbhagya Properties

Promoter type
Partnership Firm
Projects on this site
1
RERA complaints against promoter
0
Company number (CIN)
Not found in public records yet: CIN

From Karnataka RERA, as collected so far (17 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.

M/S KVR Sowbhagya Properties’s RERA record

M/S KVR Sowbhagya Properties delivery record

As on 17 Oct 2026

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

What’s changed since May 2023

As on 17 Oct 2026
  1. 2 Sep 2023Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/020923/006236); completion date 22 May 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
  2. 22 May 2023Building plan approved by BMRDA - Bangalore Metropolitan Region Development Authority (No. H.P.A/LAO/45-2021-22) Source (rera.karnataka.gov.in) (opens in a new tab)
  3. 22 May 2023Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)

Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.

Plot loan EMI calculator

No listed price found — enter one to try.

Example only — use your bank’s quote.

Monthly EMI
—
Down payment
—
Loan amount
—
Total interest
—

A calculation only, from the numbers you enter — not a loan offer.

Signature Tulips Uptown FAQs

What are the plot sizes available in Signature Tulips Uptown?

The layout offers plots in various sizes: 30×50 ft (1,500 sq ft), 40×50 ft (2,000 sq ft), 40×60 ft (2,400 sq ft), 30×45 ft (1,350 sq ft), 30×40 ft (1,200 sq ft), 40×45 ft (1,800 ft), 40×40 ft (1,600 sq ft), and 30×60 ft (1,800 sq ft). There are also 87 odd-sized plots.

How many plots are in Signature Tulips Uptown?

The layout has a total of 182 plots.

Who approved the layout for Signature Tulips Uptown?

The layout is approved by BMRDA (Bangalore Metropolitan Region Development Authority).

How many land conversion orders does Signature Tulips Uptown have?

The project has 8 land conversion orders on record.

What is the RERA registration number for Signature Tulips Uptown?

The RERA registration number is PRM/KA/RERA/1251/446/PR/020923/006236, registered on 2 September 2023.

When is Signature Tulips Uptown scheduled to be completed?

The completion date is 22 May 2026.

Are there any RERA complaints against Signature Tulips Uptown?

There are no RERA complaints on record for this project or against the developer.

Where is Signature Tulips Uptown located?

The project is located in Huskur, Bengaluru East taluk, Bengaluru Urban district, PIN code 560049.

Who is the developer of Signature Tulips Uptown?

The developer is M/S KVR Sowbhagya Properties, a partnership firm.

Written by AI from the RERA record above on 7 Oct 2026. Answers use only that record; check them against the source before you decide.

Questions about Signature Tulips Uptown

No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.

Bought a plot from M/S KVR Sowbhagya Properties? Review the developer.

Reviews of M/S KVR Sowbhagya Properties by verified buyers

No verified reviews of M/S KVR Sowbhagya Properties yet. If you bought a plot from them, your review helps other buyers.

How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the developer may reply.

Similar projects within 5 km

ProjectDistancePlotsCompletion (RERA)DevelopedComplaintsPrice
Bren CosmoBREN Corporation Pvt Ltd0.7 km203Jan 2026100%1Not collected
MelroseArk Global Estates1 km79Jul 2026—0Not collected
Konig Fortune CountyKonig Homes1.2 km146Mar 202877%0Not collected
Sidvin Horizon By The LakeSidvin Developers Private Limited1.4 km29Jul 202778%0Not collected
Sidvin Horizen By The Lake 2VRK Ventures Private Limited1.4 km73Dec 202783%0Not collected
Sizzle East Coast Phase 4Harsha S2.3 km56Aug 2031—0Not collected

Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the developer’s own website where we found one.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sources and last checked dates

  1. Karnataka RERA — project register (search by the registration number) (opens in a new tab)

Collected on 17 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.

How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/446/PR/020923/006236.

  • RERA record last checked: 17 Oct 2026
  • Last change in the record (registration, quarterly filing or complaint): 2 Sep 2023

How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the developer’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error

More new projects in Budigere Cross

  • Nimbekaipura, Budigere Cross© Esri, Maxar, Earthstar GeographicsReady to moveRERA registeredBuyers’ group open

    Bren Cosmo

    by BREN Corporation

    Price: Price on requestGet brochure & price →

    • 30×50, 30×60, 40×60 +1 more
    • 600 – 21,263 sq ft plots
    • Approved by BDA
    • Jan 2026

    203 plots · 1 RERA complaint

    Be one of the first 10 buyers in this groupFounding members — it’s free

    Join group for Bren Cosmo
  • Melrose: Site photo filed with Karnataka RERANimbekaipura, Budigere CrossUnder constructionRERA registeredBuyers’ group open

    Melrose

    by Ark Global Estates

    Price: Price on requestGet brochure & price →

    • 20×40, 30×40, 30×50 +1 more
    • 799 – 2,713 sq ft plots
    • Approved by BDA
    • Jul 2026

    RERA not updated since promised Jul 2026 · 79 plots