Sidvin Serenity
30×40, 30×50 plots by Sidvin Urban Developers · M Hosahalli, near Hoskote, Bengaluru
M Hosahalli, near Hoskote, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- plotted
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Sidvin Serenity at a glance
- Completion (RERA)Dec 2027Karnataka RERA
- Construction38% built · on pace for Jul 2028 6 mo after RERA dateRERA filing to 30 Sep 2026; estimate from average pace
- RERA complaints (project)None listedKarnataka RERA · as on 16 Oct 2026
- Approvals filed3 of 9 on RERAKarnataka RERA uploads · 16 Oct 2026
- Nearest metroWhitefield (Kadugodi) · 12.02 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 94 min at peak23.15 km straight line · estimate
- Nearest lakeUnnamed lake · 414 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Sidvin Serenity is a plotted development by Sidvin Urban Developers in M Hosahalli, Bengaluru with 165 plots, registered with Karnataka RERA. The completion date on RERA is 31 Dec 2027.
Facts collected on 16 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the developer pays us a commission.
Sidvin Serenity buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Sidvin Urban Developers for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the developer offers and book directly with the developer if you want to. Free for buyers. If you book through us, the developer pays us a commission.
- Gathering buyers
- Talking to the developer
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, plot size and timeline with us on a call; developers negotiate with them. Joining is free and never obliges you to buy.
Join the Sidvin Serenity buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: plot sizes, approval, land and completion
- Plot sizes (feet)
- 30×40, 30×50
- Plot area
- 731 – 1,752 sq ft
- Total plots
- 165
- Layout approved by
- BMRDA
- Land
- Not found in public records yet: land area
- Land conversion orders
- 5
- Completion (RERA)
- Dec 2027
- Development (RERA update)
- 38%
Plot sizes (RERA filing)
| Size (feet) | Area | Plots |
|---|---|---|
| 30×40 | 1,200 sq ft | 118 |
| 30×50 | 1,500 sq ft | 10 |
| Odd-sized (irregular) | varies | 37 |
Sizes as filed with RERA, converted from metres to feet (9.14 m = 30 ft, 12.19 m = 40 ft). Ask the developer which plots are still unsold.
Approving authority as filed: BMRDA - Bangalore Metropolitan Region Development Authority.
Land conversion orders (RERA filing)
| Survey no. | Converted for | Order | By |
|---|---|---|---|
| 62/2 | Residential | No. APP 732270, 22 Jan 2025 | DC Office, Bangalore Rural |
| 63/1 | Residential | No. APP732268, 22 Jan 2025 | DC Office, Bangalore Rural |
| 63/2 | Residential | No. APP732260, 22 Jan 2025 | DC Office, Bangalore Rural |
| 63/3 | Residential | No. APP732267, 22 Jan 2025 | DC Office, Bangalore Rural |
| 63/4 | Residential | No. APP732266, 22 Jan 2025 | DC Office, Bangalore Rural |
RERA does not cover each plot’s khata. Ask the developer for the khata and title documents and have a lawyer check them before paying an advance.
Sidvin Serenity RERA number and registration details
- RERA number
- PRM/KA/RERA/1250/304/PR/141125/008254
- Registered on
- 14 Nov 2025
- Promised completion
- 31 Dec 2027
- Extended to
- No extension recorded
- RERA status
- Under construction
- Plots booked
- Not found in public records yet: plots booked
- Price
- Not found in public records yet: price
- Project type
- Plotted
Summary in plain English
Sidvin Serenity is a plotted layout in M Hosahalli, Hosakote taluk, Bengaluru Rural district, developed by Sidvin Urban Developers. The project has 165 plots across two standard sizes (30×40 and 30×50 feet) and odd-sized plots. The layout is expected to be completed by 31 December 2027.
Written by AI from the RERA record above on 17 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, loans, escrow and other details
- Open space
- Not found in public records yet: open space
- Water and power
- Water source filed with RERA: BoreWell,Local Authority
- Plot loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- HDFC, HOSKOTE
- Building plan (RERA)
- BMRDA - Bangalore Metropolitan Region Development Authority · No. HPA/LAO/67/2024-25 · dated 24 Jun 2025
- Project cost declared to RERA
- ₹27.28 Cr
Amenities
Sidvin Serenity location and address
- Address
- SY NO 62/2,63/1,63/2,63/3 And 63/4, M HOSAHALLI VILLAGE , JADIGENAHALLI HOBLI, HOSKOTE TALUK , Hosakote , Bengaluru Rural, Karnataka - 562114
- Village (RERA)
- M Hosahalli
- Locality
- Near HoskoteAlso known as Hosakote
- PIN code
- 562114
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.05117, 77.85318
Distances to landmarks
Not found in public records yet: landmarksAbout M Hosahalli
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 14.36 km | approx. 58 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 23.15 km | approx. 94 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 23.41 km | approx. 95 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 25.28 km | approx. 102 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 30.3 km | approx. 123 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 31.78 km | approx. 129 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 2Schools and colleges1 schools, 1 colleges, 0 kindergartens
- 1Hospitals and clinics1 hospitals, 0 clinics
Nearest schools and colleges
- Thakshashila Vidya Kendra · 0.77 km
- Moraji Desai Residential PU College · 0.9 km
Nearest hospitals and clinics
- Jadigenahalli Hospital · 0.62 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Whitefield (Kadugodi) (ವೈಟ್ಫೀಲ್ಡ್ (ಕಾಡುಗೋಡಿ))Open now — nearest operating metro station12.02 km
- Devangonthi (ದೇವನಗೊಂದಿ)Nearest railway station7.71 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 414 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) (ಜಡಿಗೇನಹಳ್ಳಿ ಕೆರೆ)414 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,977 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Sidvin Serenity layout plan and plot types as filed
Documents the developer uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Brochure10 pages

BrochureFull PDF on RERA 






Approved building plan4 pages

Sanction PlanFiled 12 Nov 2025 · Full PDF on RERA
Approved layout plan

Approved Layout Plan/Demarcation PlanFull PDF on RERA
| Plot type (as filed) | Area | Plots |
|---|---|---|
| Plot 9.14 m × 12.19 m | — | 118 |
| Plot 9.14 m × 15.24 m | — | 10 |
| Odd-shaped plots | — | 37 |
Plot types and counts as filed with Karnataka RERA.
We have not collected the layout plan drawing; the developer’s sales team can share it.
Sidvin Serenity completion date and development status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
Timeline
- 1 Sep 2025Project start date given to RERA
- 14 Nov 2025Registered with Karnataka RERA
- 31 Dec 2027Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Jul 2028 — about 6 months after the completion date on RERA (31 Dec 2027).
At the pace between the 4 quarterly filings we have (15% → 38% in 9 months), it would be around Oct 2028 — about 9 months after the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Developed | Plots booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 15 Oct 2026 | 38% | — |
| Q1 2026-27to 30 Jun 2026 | 15 Jul 2026 | 32% | — |
| Q4 2025-26to 31 Mar 2026 | 15 Apr 2026 | 26% | — |
| Q3 2025-26to 31 Dec 2025 | 16 Feb 2026 | 15% | — |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 38% ÷ 12.9 months (1 Sep 2025 to 30 Sep 2026) = 2.9% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 62 ÷ 2.9 = 21.1 months → Jul 2028. This is an estimate, not a date from the builder or RERA.
Pace between filings = (38% − 15%) ÷ 9 months = 2.6% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Layout plan | BMRDA - Bangalore Metropolitan Region Development Authority · No. HPA/LAO/67/2024-25 · dated 2025-06-24 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (5 orders) | DC Office, Bangalore Rural · No. APP 732270 and 4 more · dated 2025-01-22 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan/Demarcation Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| NOC from ESCOMs | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| NOC for Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BMRDA - Bangalore Metropolitan Region Development Authority · No. HPA/LAO/67/2024-25 · dated 24 Jun 2025
- Commencement certificate · Permission to start buildingNot on RERA yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBNot on RERA yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 16 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Sidvin Serenity RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Sidvin Urban Developers
- Promoter type
- Partnership Firm
- Projects on this site
- 1
- RERA complaints against promoter
- 0
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (16 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Sidvin Urban Developers’s RERA recordSidvin Urban Developers delivery record
- 1Projects in Bengaluru on RERA1 approved registration under Sidvin Urban Developers in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 165Plots registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 plots0 complaints ÷ 165 plots in its 1 registration on Karnataka RERA in Bengaluru.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Jun 2025
- 15 Oct 2026Quarterly update filed for Q2 2026-27: 38% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Quarterly update filed for Q1 2026-27: 32% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Quarterly update filed for Q4 2025-26: 26% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 16 Feb 2026Quarterly update filed for Q3 2025-26: 15% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Nov 2025Registered with Karnataka RERA (PRM/KA/RERA/1250/304/PR/141125/008254); completion date 31 Dec 2027 Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Sep 2025Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 24 Jun 2025Building plan approved by BMRDA - Bangalore Metropolitan Region Development Authority (No. HPA/LAO/67/2024-25) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Plot loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
Sidvin Serenity FAQs
What is the RERA registration number for Sidvin Serenity?
The project is registered on RERA as PRM/KA/RERA/1250/304/PR/141125/008254.
How many plots are in Sidvin Serenity?
Sidvin Serenity has 165 plots in total: 118 plots of 30×40 feet (1,200 sq ft), 10 plots of 30×50 feet (1,500 sq ft), and 37 odd-sized plots.
What are the plot sizes available in Sidvin Serenity?
The project offers plots of 30×40 feet (1,200 sq ft) and 30×50 feet (1,500 sq ft), along with 37 odd-sized plots.
When will Sidvin Serenity be completed?
The project completion date on RERA is 31 December 2027.
Who approved the layout for Sidvin Serenity?
The layout was approved by BMRDA (Bengaluru Metropolitan Region Development Authority).
How many land conversion orders were issued for Sidvin Serenity?
5 land conversion orders were issued for the project.
What is the current development progress of Sidvin Serenity?
As of Q2 2026-27 (ended 30 September 2026), the layout development is 38 percent complete.
Are there any RERA complaints against Sidvin Serenity or the developer?
There are no RERA complaints against this project or against Sidvin Urban Developers across all their projects.
Where is Sidvin Serenity located?
The project is in M Hosahalli, Hosakote taluk, Bengaluru Rural district, PIN code 562114.
Is this the only Sidvin Urban Developers project on RERA?
Yes, Sidvin Serenity is the only project by Sidvin Urban Developers in our Bengaluru RERA records.
Written by AI from the RERA record above on 17 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Sidvin Serenity
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a plot from Sidvin Urban Developers? Review the developer.
Reviews of Sidvin Urban Developers by verified buyers
No verified reviews of Sidvin Urban Developers yet. If you bought a plot from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the developer may reply.
Similar projects within 5 km
| Project | Distance | Plots | Completion (RERA) | Developed | Complaints | Price |
|---|---|---|---|---|---|---|
| Windsor Township -Phase - 3Windsor Gardens Private Limited | 1.4 km | 50 | Jul 2023extended | — | 0 | Not collected |
| Terra VerdantRanjitha N | 3.6 km | 16 | Dec 2029 | — | 0 | Not collected |
| MizarNagarjuna Structural Corporation Private Limited | 4.1 km | 44 | Dec 2029 | 50% | 0 | Not collected |
| Carpe DiemVijayasri Vijetha Infra Projects | 4.2 km | 125 | Dec 2027 | 100% | 0 | Not collected |
| AlcorNagarjuna Structural Corporation Private Limited | 4.2 km | 71 | Dec 2029 | 70% | 0 | Not collected |
| JR EastfieldsJR Housing Developers Pvt Ltd | 4.6 km | 389 | Aug 2026 | 100% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the developer’s own website where we found one.
Sources and last checked dates
Collected on 16 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1250/304/PR/141125/008254.
- RERA record last checked: 16 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 16 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the developer’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects nearby
- Jadigenahalli, near Hoskote© Esri, Maxar, Earthstar GeographicsReady to moveRERA registeredBuyers’ group open
Windsor Township -Phase - 3
by Windsor Gardens
Price: Price on requestGet brochure & price →
- Plot sizes not found
- 10,839 – 20,268 sq ft plots
- Approved by BMRDA
- Jul 2023 (extended)
50 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Windsor Township -Phase - 3
Jinnagara, near HoskoteUnder constructionRERA registeredBuyers’ group openTerra Verdant
by Ranjitha N
Price: Price on requestGet brochure & price →
- 40×60
- 1,379 – 2,400 sq ft plots
- Approved by Hospete Urban Development Authority
- Dec 2029
16 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Terra Verdant
Kolathuru, HoskoteUnder constructionRERA registeredBuyers’ group openMizar
by Nagarjuna Structural Corporation
Price: Price on requestGet brochure & price →
- 30×50
- 743 – 3,198 sq ft plots
- Approved by Hospete Urban Development Authority
- Dec 2029
44 plots
Be one of the first 10 buyers in this groupFounding members — it’s free