Windsor Township -Phase - 3
Plots by Windsor Gardens Private Limited · Jadigenahalli, near Hoskote, Bengaluru
Jadigenahalli, near Hoskote, BengaluruOpen on Google Maps (opens in a new tab)
- Completion filed with RERA
- RERA registered
- plotted
Plots still available: 50 of 50 plots were unsold when the developer filed completion with RERA (28 Apr 2026). Some may have sold since — join the group and we’ll ask the developer what is left and for a group price.
by Windsor Gardens Private Limited
Price: Price on request
Windsor Township -Phase - 3 at a glance
- Completion (RERA)Jul 2023 ExtendedWas Jul 2022 · Karnataka RERA
- RERA complaints (project)None listedKarnataka RERA · as on 4 Oct 2026
- Approvals filed4 of 9 on RERAKarnataka RERA uploads · 4 Oct 2026
- Nearest metroWhitefield (Kadugodi) · 11.36 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 88 min at peak21.8 km straight line · estimate
- Nearest lakeUnnamed lake · 553 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Windsor Township -Phase - 3 is a plotted development by Windsor Gardens Private Limited in Jadigenahalli, Bengaluru with 50 plots, registered with Karnataka RERA. The completion date on RERA is 30 Jul 2023.
Facts collected on 4 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the developer pays us a commission.
Windsor Township -Phase - 3 buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Windsor Gardens Private Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the developer offers and book directly with the developer if you want to. Free for buyers. If you book through us, the developer pays us a commission.
- Gathering buyers
- Talking to the developer
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, plot size and timeline with us on a call; developers negotiate with them. Joining is free and never obliges you to buy.
Join the Windsor Township -Phase - 3 buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: plot sizes, approval, land and completion
- Plot sizes (feet)
- Not found in public records yet: plot sizes
- Plot area
- 10,839 – 20,268 sq ft
- Total plots
- 50
- Layout approved by
- BMRDA
- Land
- Not found in public records yet: land area
- Land conversion orders
- None listed
- Completion (extended)
- Jul 2023
- Development (RERA update)
- Not found in public records yet: development progress
Approving authority as filed: BMRDA - Bangalore Metropolitan Region Development Authority.
Windsor Township -Phase - 3 RERA number and registration details
- RERA number
- PRM/KA/RERA/1250/304/PR/140622/004976
- Registered on
- 14 Jun 2022
- Promised completion
- 30 Jul 2022
- Extended to
- 30 Jul 2023
- RERA status
- Completed
- Plots booked
- Not found in public records yet: plots booked
- Price
- Not found in public records yet: price
- Project type
- Plotted
Summary in plain English
Windsor Township – Phase 3 is a plotted layout by Windsor Gardens Private Limited in Jadigenahalli, Hosakote, Bengaluru Rural. The project has 50 plots and was registered on RERA on 14 June 2022 with a completion date of 30 July 2023.
Written by AI from the RERA record above on 7 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, loans, escrow and other details
- Open space
- Not found in public records yet: open space
- Water and power
- Water source filed with RERA: BoreWell,Local Authority
- Plot loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- IDFC FIRST BANK, JAYANAGAR
- Building plan (RERA)
- BMRDA - Bangalore Metropolitan Region Development Authority · No. LAO/37/2019-2020 · dated 20 Jul 2020
- Project cost declared to RERA
- ₹10.51 Cr
Amenities
Windsor Township -Phase - 3 location and address
- Address
- Sy No. 208/2 & 208/3, Jadigenahalli Village & Hobli, , Hoskote Taluk, , Hosakote , Bengaluru Rural, Karnataka - 562114
- Village (RERA)
- Jadigenahalli
- Locality
- Near HoskoteAlso known as Hosakote
- PIN code
- 562114
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.05731, 77.84160
Distances to landmarks
Not found in public records yet: landmarksAbout Jadigenahalli
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 13.66 km | approx. 55 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 21.8 km | approx. 88 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 22.86 km | approx. 93 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 24.04 km | approx. 97 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 29.99 km | approx. 121 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 30.76 km | approx. 125 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 2Schools and colleges1 schools, 1 colleges, 0 kindergartens
- 1Hospitals and clinics1 hospitals, 0 clinics
Nearest schools and colleges
- Moraji Desai Residential PU College · 0.69 km
- Thakshashila Vidya Kendra · 0.82 km
Nearest hospitals and clinics
- Mother and Child Hospital · 1.79 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Whitefield (Kadugodi) (ವೈಟ್ಫೀಲ್ಡ್ (ಕಾಡುಗೋಡಿ))Open now — nearest operating metro station11.36 km
- Devangonthi (ದೇವನಗೊಂದಿ)Nearest railway station8.1 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 553 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 553 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) (ಜಡಿಗೇನಹಳ್ಳಿ ಕೆರೆ)1,627 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Windsor Township -Phase - 3 layout plan and plot types as filed
Layout plan and brochure not published? The developer shares them only on request. We’ll get the brochure, layout plan and current price list for you, free.
Get brochure, layout plan & price| Plot type (as filed) | Area | Plots |
|---|---|---|
| Plots | — | 50 |
Plot types and counts as filed with Karnataka RERA.
We have not collected the layout plan drawing; the developer’s sales team can share it.
Windsor Township -Phase - 3 completion date and development status
Timeline
- 3 May 2021Project start date given to RERA
- 14 Jun 2022Registered with Karnataka RERA
- 30 Jul 2022Completion date given at registration
- 30 Jul 2023Section 6 Extension: completion date moved to this date
- 28 Apr 2026Promoter applied to RERA for completion
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Layout plan | BMRDA - Bangalore Metropolitan Region Development Authority · No. LAO/37/2019-2020 · dated 2020-07-20 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Change of Land Use | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BMRDA - Bangalore Metropolitan Region Development Authority · No. LAO/37/2019-2020 · dated 20 Jul 2020
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBNot on RERA yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 4 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Windsor Township -Phase - 3 RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Windsor Gardens Private Limited
- Promoter type
- Company
- Projects on this site
- 1
- RERA complaints against promoter
- 0
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (4 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Windsor Gardens Private Limited’s RERA recordWindsor Gardens Private Limited delivery record
- 1Projects in Bengaluru on RERA1 approved registration under Windsor Gardens Private Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 50Plots registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 plots0 complaints ÷ 50 plots in its 1 registration on Karnataka RERA in Bengaluru.
- 1Completion filed on RERARegistrations where the promoter applied to RERA for completion; 0 with an occupancy certificate on RERA.
- 0 of 1Filed by the date given at registrationMedian gap 44.9 months (on-time ones count as 0). The completion application can come after handover, so this is an upper bound on lateness.
Completion filed on RERA
| Project | Date at registration | Completion filed | Gap |
|---|---|---|---|
| Windsor Township -Phase - 3 | 30 Jul 2022extended to 30 Jul 2023 | 28 Apr 2026 | 45 months after |
Measured against the completion date given at registration; many projects had RERA extensions (including the COVID-period extension), shown under the date.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Jul 2020
- 28 Apr 2026Promoter applied to RERA for completion Source (rera.karnataka.gov.in) (opens in a new tab)
- 30 Jul 2023Completion date extended to 30 Jul 2023 Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Jun 2022Registered with Karnataka RERA (PRM/KA/RERA/1250/304/PR/140622/004976); completion date 30 Jul 2022 Source (rera.karnataka.gov.in) (opens in a new tab)
- 3 May 2021Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 20 Jul 2020Building plan approved by BMRDA - Bangalore Metropolitan Region Development Authority (No. LAO/37/2019-2020) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Plot loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
Windsor Township -Phase - 3 FAQs
How many plots are in Windsor Township – Phase 3?
The project has 50 plots.
What is the RERA registration number for Windsor Township – Phase 3?
The RERA registration number is PRM/KA/RERA/1250/304/PR/140622/004976.
What is the completion date for Windsor Township – Phase 3?
The completion date on RERA is 30 July 2023.
Has the completion date been extended?
Yes, the completion date was extended under Section 6 Extension to 30 July 2023.
Who approved the layout for Windsor Township – Phase 3?
The layout was approved by BMRDA.
Where is Windsor Township – Phase 3 located?
The project is in Jadigenahalli, Hosakote taluk, Bengaluru Rural district, PIN code 562114.
Are there any RERA complaints on Windsor Township – Phase 3?
No RERA complaints have been filed on this project.
How many RERA complaints are there against Windsor Gardens Private Limited?
There are no RERA complaints against the developer across all projects.
How many other projects does Windsor Gardens Private Limited have on RERA record?
The developer has 2 projects in total on the Bengaluru RERA record.
Who is the escrow bank for Windsor Township – Phase 3?
IDFC FIRST BANK is the escrow bank for this project.
Written by AI from the RERA record above on 7 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Windsor Township -Phase - 3
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a plot from Windsor Gardens Private Limited? Review the developer.
Reviews of Windsor Gardens Private Limited by verified buyers
No verified reviews of Windsor Gardens Private Limited yet. If you bought a plot from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the developer may reply.
Similar projects within 5 km
| Project | Distance | Plots | Completion (RERA) | Developed | Complaints | Price |
|---|---|---|---|---|---|---|
| Sidvin SerenitySidvin Urban Developers | 1.4 km | 165 | Dec 2027 | 38% | 0 | Not collected |
| MizarNagarjuna Structural Corporation Private Limited | 2.7 km | 44 | Dec 2029 | 50% | 0 | Not collected |
| Carpe DiemVijayasri Vijetha Infra Projects | 2.8 km | 125 | Dec 2027 | 100% | 0 | Not collected |
| AlcorNagarjuna Structural Corporation Private Limited | 2.9 km | 71 | Dec 2029 | 70% | 0 | Not collected |
| Ruby Sizzle HeritageSS Ruby Developers | 3.2 km | 377 | Sep 2030 | — | 0 | Not collected |
| Terra VerdantRanjitha N | 3.2 km | 16 | Dec 2029 | — | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the developer’s own website where we found one.
Sources and last checked dates
Collected on 4 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1250/304/PR/140622/004976.
- RERA record last checked: 4 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 14 Jun 2022
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the developer’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects nearby
M Hosahalli, near HoskoteUnder constructionRERA registeredBuyers’ group openSidvin Serenity
by Sidvin Urban
Price: Price on requestGet brochure & price →
- 30×40, 30×50
- 731 – 1,752 sq ft plots
- Approved by BMRDA
- Dec 2027
165 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Sidvin Serenity
Kolathuru, HoskoteUnder constructionRERA registeredBuyers’ group openMizar
by Nagarjuna Structural Corporation
Price: Price on requestGet brochure & price →
- 30×50
- 743 – 3,198 sq ft plots
- Approved by Hospete Urban Development Authority
- Dec 2029
44 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Mizar
Kolaturu, HoskoteUnder constructionRERA registeredBuyers’ group openCarpe Diem
by Vijayasri Vijetha Infra
Price: Price on requestGet brochure & price →
- 30×40, 30×45, 30×50 +2 more
- 1,138 – 2,658 sq ft plots
- Approved by Hoskote Planning Authority
- Dec 2027
125 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Carpe Diem