sipani Royal Heritage
1, 2 & 3 BHK apartments by sipani properties pvt ltd · Iggalur, Chandapura–Attibele, Bengaluru
Iggalur, Chandapura–Attibele, Bengaluru
- Under construction
- RERA registered
- RERA not updated: completion promised Sep 2026; no extension or completion filed
- residential
Price: Price on request
A Legacy in Every Detail - Heritage-inspired design Artist’s impression · © sipani properties pvt ltd · Source ↗ (opens in a new tab)
sipani Royal Heritage at a glance
- Possession (RERA)Sep 2026 Date passedWas Dec 2022 · Karnataka RERA
- Construction93% built · on pace for Feb 2027 5 mo after RERA dateRERA filing to 30 Jun 2026 (Phase-I); estimate from average pace
- RERA complaints (project)5 complaintsKarnataka RERA · as on 14 Oct 2026
- Approvals filed1 of 9 on RERAKarnataka RERA uploads · 14 Oct 2026
Project summary
sipani Royal Heritage is a residential project by sipani properties pvt ltd in Iggalur, Bengaluru with 2,344 homes, registered with Karnataka RERA. The completion date on RERA is 30 Sep 2026. It is registered in 2 phases.
Not in the RERA record we collected yet: map location. This page fills in as the record is collected.
Facts collected on 14 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
sipani Royal Heritage buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks sipani properties pvt ltd for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the sipani Royal Heritage buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 1 BHK, 2 BHK, 2.5 BHK, 3 BHK
- Carpet area
- 393 – 832 sq ft
- Towers
- 14
- Floors
- 14
- Total homes
- 2,344
- Land
- 12.28 acres
- Possession (extended)
- Sep 2026
- Built (RERA update)
- Not found in public records yet: construction progress
sipani Royal Heritage RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/308/PR/180328/002366
- Registered on
- 28 Mar 2018
- Promised completion
- 31 Dec 2022
- Extended to
- 30 Sep 2026
- RERA status
- New launch
- Homes booked
- Not found in public records yet: homes booked
- Price
- Not found in public records yet: price
- Project type
- Residential
2 RERA registrations (one per phase) are shown together on this page; dates above are the latest across phases.
Phases and RERA numbers
| Phase | RERA number | Promised completion | Homes | Status | Source |
|---|---|---|---|---|---|
| Phase-I | PRM/KA/RERA/1251/308/PR/180328/002366 | 30 Sep 2021Extended to 30 Sep 2026 | 1,913 | New launch | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Phase-II | PRM/KA/RERA/1251/308/PR/180519/001752 | 31 Dec 2022Extended to 30 Jun 2026 | 431 | New launch | Source (rera.karnataka.gov.in) (opens in a new tab) |
Towers and blocks (RERA filing)
14 rows: towers. Scroll inside the table to see them all.
| Tower | Phase | Floors | Basements | Homes |
|---|---|---|---|---|
| A WING | Phase-I | 14 | 1 | 98 |
| B wing | Phase-I | 14 | 1 | 98 |
| C Wing | Phase-I | 14 | 1 | 98 |
| D wing | Phase-I | 14 | 1 | 98 |
| E Wing | Phase-I | 14 | 1 | 98 |
| F Wing | Phase-I | 14 | 1 | 98 |
| G wing | Phase-I | 14 | 1 | 98 |
| H wing | Phase-I | 14 | 1 | 98 |
| I wing | Phase-I | 14 | 1 | 98 |
| J wing | Phase-I | 14 | 1 | 98 |
| K | Phase-II | 14 | 1 | 56 |
| L | Phase-II | 14 | 1 | 56 |
| M | Phase-II | 14 | 1 | 56 |
| N | Phase-II | 14 | 1 | 56 |
A dash (—) means the filing did not state that value.
Summary in plain English
Sipani Royal Heritage is a residential project by Sipani Properties Pvt Ltd in Iggalur, Anekal taluk, with 2,344 homes across two phases and 14 towers. Phase-I completion date on RERA is 30 September 2026 and Phase-II completion date is 30 June 2026.
Written by AI from the RERA record above on 5 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- Not found in public records yet: open space
- Water and power
- Not found in public records yet: water and power
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA) · Phase-I
- HDFC, kasturba road
- Escrow bank (RERA) · Phase-II
- HDFC, kasturba road
Amenities
sipani Royal Heritage location and address
- Address
- Sy No. 78/2,78/3, of Iggalur village , sy No 308 & 309m site No. 7 of Marsur village, kasaba Hobli, Anekal Taluk, Bangalore -560099
- Village (RERA)
- Iggalur
- Locality
- Chandapura–AttibeleAlso known as Chandapura, Attibele
- PIN code
- 560095
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- Not found in public records yet: coordinates
Distances to landmarks
Not found in public records yet: landmarksAbout Chandapura–Attibele
Not found in public records yet: locality factssipani Royal Heritage home types and carpet areas
Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.
Get brochure, floor plans & price| Home type | Carpet area | Homes |
|---|---|---|
| 1 & 2 BHK units | 609 sq ft | 933 |
| 1 BHK- type-1 | 393 sq ft | 100 |
| 1 BHK- type-1 + terrace | 393 sq ft | 12 |
| 2 , 2.5 & 3 BHK units | 832 sq ft | 207 |
| 2 BHK- type-2 | 567 sq ft | 174 |
| 2 BHK- type-2 + terrace | 567 sq ft | 20 |
| 2 BHK- type-3 | 561 sq ft | 56 |
| 2 BHK- type-4 | 591 sq ft | 92 |
| 2 BHK- type-4 + terrace | 591 sq ft | 20 |
| 2 BHK- type-4a | 604 sq ft | 48 |
| 2 BHK- type-4a + terrace | 604 sq ft | 8 |
| 2 BHK- type-5 | 631 sq ft | 304 |
| 2 BHK- type-5 + terrace | 631 sq ft | 32 |
| 2 BHK- type-5a | 617 sq ft | 104 |
| 2 BHK- type-5a + terrace | 617 sq ft | 8 |
| 2 BHK- type-5b | 655 sq ft | 56 |
| 2 BHK- type-5c | 667 sq ft | 4 |
| 2 BHK- type-5d | 655 sq ft | 1 |
| 2 BHK- type-7a | 819 sq ft | 13 |
| 2.5 BHK- type-6 | 780 sq ft | 28 |
| 2.5 BHK- type-06 | 780 sq ft | 28 |
| 3 BHK- type-5 | 567 sq ft | 2 |
| 3 BHK- type-7 | 831 sq ft | 26 |
| 3 BHK- type-07 | 831 sq ft | 54 |
| 3 BHK- type-7a | 819 sq ft | 14 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
sipani Royal Heritage possession date and construction status
Timeline
- 15 Nov 2017Phase-I: Project start date given to RERA
- 1 Feb 2018Phase-II: Project start date given to RERA
- 28 Mar 2018Phase-I: Registered with Karnataka RERA
- 19 May 2018Phase-II: Registered with Karnataka RERA
- 30 Sep 2021Phase-I: Completion date given at registration
- 30 Jun 2022Phase-I: Covid Extension: completion date moved to this date
- 31 Dec 2022Phase-II: Completion date given at registration
- 30 Jun 2023Phase-I: Section 6 Extension: completion date moved to this date
- 30 Sep 2023Phase-II: Covid Extension: completion date moved to this date
- 30 Sep 2024Phase-II: Section 6 Extension: completion date moved to this date
- 30 Jun 2026Phase-II: Further Extension: completion date moved to this date
- 30 Sep 2026Phase-I: Further Extension: completion date moved to this date
Construction pace from RERA quarterly filings (Phase-I)
At the average pace so far, construction would reach 100% around Feb 2027 — about 5 months after the completion date on RERA (30 Sep 2026).
This project has 2 RERA registrations; the chart uses Phase-I, the one with the most quarterly filings.
- Filed on RERA
- Average pace since start
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q1 2026-27to 30 Jun 2026 | 24 Jul 2026 | 93% | 13 of 6,869 |
| Q4 2025-26to 31 Mar 2026 | 15 Apr 2026 | 91% | 19 of 6,869 |
| Q3 2025-26to 31 Dec 2025 | 16 Jan 2026 | 95% | 20 of 6,869 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 93% ÷ 103.4 months (15 Nov 2017 to 30 Jun 2026) = 0.9% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Jun 2026 + 7 ÷ 0.9 = 7.8 months → Feb 2027. This is an estimate, not a date from the builder or RERA.
Pace between filings = (93% − 95%) ÷ 5.9 months = -0.3% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Building plan (Phase-I) | BMRDA - Bangalore Metropolitan Region Development Authority | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Building plan (Phase-II) | BMRDA - Bangalore Metropolitan Region Development Authority | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA (Phase-I)
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Commencement certificate · Permission to start buildingNot on RERA yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBNot on RERA yet
- Water and sewerage · BWSSBNot on RERA yet
- Electricity · BESCOMNot on RERA yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 14 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). Each phase is registered separately; this list is for the phase named above. The project page on RERA lists each upload.
sipani Royal Heritage RERA complaints and orders
5 complaints as on Source (rera.karnataka.gov.in) (opens in a new tab)
| Complaint ref | Filed | Subject | Status | Source |
|---|---|---|---|---|
| 00621/2025 | 11 Apr 2025 | Sipani Properties is denying registration of the apartment that I booked in Sipani Royal Heritage | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00232/2025 | 30 Jan 2025 | Extra maintenence charges with penalty | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220119/0008828 | 19 Jan 2022 | Delivery date exceeds as per agreement | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/200701/0006099 | 1 Jul 2020 | Booking Amount Not Refunded | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/200624/0006069 | 24 Jun 2020 | Pre-emi refund | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About sipani properties pvt ltd
- Promoter type
- Company
- Projects on this site
- 2
- RERA complaints against promoter
- 9
- Company number (CIN)
- U70102KA1997PTC023041
From Karnataka RERA, as collected so far (14 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
sipani properties pvt ltd’s RERA recordsipani properties pvt ltd delivery record
- 2Projects in Bengaluru on RERA3 approved registrations under sipani properties pvt ltd in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 3,115Homes registeredAs stated in each registrations.
- 9RERA complaints3 open, 6 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 2.9Complaints per 1,000 homes9 complaints ÷ 3,115 homes in its 3 registrations on Karnataka RERA in Bengaluru.
What the complaints are about
9 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Nov 2017
- 30 Sep 2026Phase-I: Completion date extended to 30 Sep 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
- 24 Jul 2026Phase-I: Quarterly update filed for Q1 2026-27: 93% built, 13 of 6,869 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 30 Jun 2026Phase-II: Completion date extended to 30 Jun 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Phase-I: Quarterly update filed for Q4 2025-26: 91% built, 19 of 6,869 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Phase-II: Quarterly update filed for Q4 2025-26: 91% built, 0 of 168 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 16 Jan 2026Phase-I: Quarterly update filed for Q3 2025-26: 95% built, 20 of 6,869 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Jan 2026Phase-II: Quarterly update filed for Q3 2025-26: 89% built, 1 of 224 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 11 Apr 2025Complaint 00621/2025 filed with RERA: “Sipani Properties is denying registration of the apartment that I booked in Sipani Royal Heritage” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 30 Jan 2025Complaint 00232/2025 filed with RERA: “Extra maintenence charges with penalty” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 19 Jan 2022Complaint CMP/220119/0008828 filed with RERA: “Delivery date exceeds as per agreement” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Jul 2020Complaint CMP/200701/0006099 filed with RERA: “Booking Amount Not Refunded” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 24 Jun 2020Complaint CMP/200624/0006069 filed with RERA: “Pre-emi refund” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 19 May 2018Phase-II: Registered with Karnataka RERA (PRM/KA/RERA/1251/308/PR/180519/001752); completion date 31 Dec 2022 Source (rera.karnataka.gov.in) (opens in a new tab)
- 28 Mar 2018Phase-I: Registered with Karnataka RERA (PRM/KA/RERA/1251/308/PR/180328/002366); completion date 30 Sep 2021 Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Feb 2018Phase-II: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Nov 2017Phase-I: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
sipani Royal Heritage FAQs
What is the RERA registration number for Sipani Royal Heritage?
Phase-I is registered as PRM/KA/RERA/1251/308/PR/180328/002366 and Phase-II is registered as PRM/KA/RERA/1251/308/PR/180519/001752.
How many homes are in Sipani Royal Heritage?
Phase-I has 1,913 homes and Phase-II has 431 homes, for a total of 2,344 homes.
What home types are available in Sipani Royal Heritage?
Phase-I offers 1 BHK, 2 BHK and 3 BHK units with carpet areas from 393 sq ft to 631 sq ft. Phase-II offers 2 BHK, 2.5 BHK and 3 BHK units with carpet areas from 655 sq ft to 832 sq ft.
When will Sipani Royal Heritage be completed?
Phase-I completion date on RERA is 30 September 2026. Phase-II completion date on RERA is 30 June 2026.
What extensions have been granted for Sipani Royal Heritage?
Phase-I has been extended three times: Covid Extension to 30 June 2022, Section 6 Extension to 30 June 2023, and Further Extension to 30 September 2026. Phase-II has been extended three times: Covid Extension to 30 September 2023, Section 6 Extension to 30 September 2024, and Further Extension to 30 June 2026.
What is the construction progress of Sipani Royal Heritage?
As of Q1 2026-27 (quarter ended 30 June 2026), Phase-I is 93% complete. As of Q4 2025-26 (quarter ended 31 March 2026), Phase-II is 91% complete.
How many homes have been booked in Sipani Royal Heritage?
In Phase-I, 13 homes have been booked as of Q1 2026-27. In Phase-II, no homes have been booked as of Q4 2025-26.
How many RERA complaints are there for Sipani Royal Heritage?
There are 5 RERA complaints on this project: 4 on Phase-I and 1 on Phase-II.
Where is Sipani Royal Heritage located?
The project is in Iggalur, Anekal taluk, Bengaluru Urban district, PIN code 560095.
What is the builder's track record?
Sipani Properties Pvt Ltd has 6 projects in the Bengaluru RERA records and 9 RERA complaints across all its projects.
Written by AI from the RERA record above on 5 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about sipani Royal Heritage
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from sipani properties pvt ltd? Review the builder.
Reviews of sipani properties pvt ltd by verified buyers
No verified reviews of sipani properties pvt ltd yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Sources and last checked dates
Collected on 14 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration numbers: PRM/KA/RERA/1251/308/PR/180328/002366, PRM/KA/RERA/1251/308/PR/180519/001752.
- RERA record last checked: 14 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 24 Jul 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Chandapura–Attibele
Marasur, Chandapura–AttibeleUnder constructionRERA registeredBuyers’ group openLegacy
by Global Edifice Infra
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 679 – 1,033 sq ft
- May 2028
56 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Legacy
Manchenahalli, Chandapura–AttibeleUnder constructionRERA registeredBuyers’ group openShriram 107southeast - Phase 3
by Shriprop Living Space
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 463 – 635 sq ft
- Jan 2027
1,055 homes · 3 RERA complaints
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Shriram 107southeast - Phase 3
Madiwala, Chandapura–AttibeleReady to moveRERA registeredBuyers’ group openDS Max Sukruth
by DS Max Realty
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 552 – 879 sq ft
- Feb 2026
304 homes · 1 RERA complaint