Skyline Haven
2 & 3 BHK apartments by sv infra homes · Bandenallasandra, near Electronic City Phase 2, Bengaluru
Bandenallasandra, near Electronic City Phase 2, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Skyline Haven at a glance
- Possession (RERA)Jan 2028Karnataka RERA
- Construction97% built · on pace for Jul 2026RERA filing to 30 Jun 2026; estimate from average pace
- RERA complaints (project)None listedKarnataka RERA · as on 21 Oct 2026
- Approvals filed5 of 9 on RERAKarnataka RERA uploads · 21 Oct 2026
- Nearest metroDelta Electronics Bommasandra · 5.17 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 186 min at peak45.97 km straight line · estimate
- Nearest lakeKyalasanahalli Lake · 1,378 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Skyline Haven is a residential project by sv infra homes in Bandenallasandra, Bengaluru with 88 homes, registered with Karnataka RERA. The completion date on RERA is 31 Jan 2028.
Facts collected on 21 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Skyline Haven buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks sv infra homes for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Skyline Haven buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 2 BHK, 3 BHK
- Carpet area
- 583 – 770 sq ft
- Towers
- 1
- Floors
- 3
- Total homes
- 88
- Land
- 1.05 acres
- Possession (RERA)
- Jan 2028
- Built (RERA update)
- 97%
Skyline Haven RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/308/PR/270924/007096
- Registered on
- 27 Sep 2024
- Promised completion
- 31 Jan 2028
- Extended to
- No extension recorded
- RERA status
- Under construction
- Homes booked
- Not found in public records yet: homes booked
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| Skyline Haven | 3 | 0 | 88 |
A dash (—) means the filing did not state that value.
Summary in plain English
Skyline Haven is a residential project by SV Infra Homes in Bandenallasandra, Anekal, with 88 homes in 1 tower. The project is registered with Karnataka RERA and is scheduled for completion on 31 January 2028.
Written by AI from the RERA record above on 21 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 56.3% of land
- Water and power
- Water source filed with RERA: BoreWell
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- FEDERAL BANK OF INDIA, HSR Layout
- Building plan (RERA)
- BMRDA - Bangalore Metropolitan Region Development Authority · No. APA/CC/1248/2023-24 · dated 14 Mar 2024
- Project cost declared to RERA
- ₹21.02 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- CCTV Surveillance
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Skyline Haven location and address
- Address
- Sy No 10/4, Bandenallasandra Village, Jigani Hobli, Anekal Taluk,Bangalore Urban District-560105 , Sy No 10/4, Bandenallasandra Village, Jigani Hobli, Anekal Taluk,Bangalore Urban District-560105 , Anekal , Bengaluru Urban, Karnataka - 560105
- Village (RERA)
- Bandenallasandra
- Locality
- Near Electronic City Phase 2Also known as Electronics City Phase 2, E-City Phase 2
- PIN code
- 560105
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.79057, 77.65096
Distances to landmarks
Not found in public records yet: landmarksAbout Bandenallasandra
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 6.75 km | approx. 27 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 15.16 km | approx. 61 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 22.65 km | approx. 92 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 23.85 km | approx. 97 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 28.84 km | approx. 117 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 45.97 km | approx. 186 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 1Schools and colleges1 schools, 0 colleges, 0 kindergartens
- 0Hospitals and clinics0 hospitals, 0 clinics
Nearest schools and colleges
- Achiever's Academy · 1.99 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Delta Electronics Bommasandra (ಡೆಲ್ಟಾ ಎಲೆಕ್ಟ್ರಾನಿಕ್ಸ್ ಬೊಮ್ಮಸಂದ್ರ)Open now — nearest operating metro station5.17 km
- Heelalige (ಹೀಲಲಿಗೆ ರೈಲು ನಿಲ್ದಾಣ)Nearest railway station6.99 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Kyalasanahalli Lake, 1,378 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Kyalasanahalli Lake on OpenStreetMap (opens in a new tab) 1,378 m
- Nanjapura Lake on OpenStreetMap (opens in a new tab) 1,526 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Skyline Haven floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Floor plans3 files

ground typical 1st 2nd and 3rd floor plans.pdfFull PDF on RERA 
stilt floor plan.pdfFull PDF on RERA 
Terrace floor plan.pdfFull PDF on RERA
Elevations

sanction viuew and elevation.pdfFull PDF on RERA
Approved building plan4 pages

Building Plan (1)Filed 21 Sep 2024 · Full PDF on RERA
Approved layout plan

Existing Layout PlanFull PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 2 BHK | 583 – 651 sq ft | 64 |
| 3 BHK | 770 sq ft | 24 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Skyline Haven possession date and construction status
Promoter’s quarterly update to RERA for Q1 2026-27, submitted 2026-07-15.
Timeline
- 14 Mar 2024Project start date given to RERA
- 27 Sep 2024Registered with Karnataka RERA
- 31 Jan 2028Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Jul 2026 — about 18 months before the completion date on RERA (31 Jan 2028).
At the pace between the 3 quarterly filings we have (91% → 97% in 6 months), it would be around Sep 2026 — about 16 months before the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q1 2026-27to 30 Jun 2026 | 15 Jul 2026 | 97% | — |
| Q4 2025-26to 31 Mar 2026 | 15 Apr 2026 | 95% | 51 of 88 |
| Q3 2025-26to 31 Dec 2025 | 16 Jan 2026 | 91% | 49 of 88 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 97% ÷ 27.5 months (14 Mar 2024 to 30 Jun 2026) = 3.5% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Jun 2026 + 3 ÷ 3.5 = 0.9 months → Jul 2026. This is an estimate, not a date from the builder or RERA.
Pace between filings = (97% − 91%) ÷ 5.9 months = 1% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q1 2026-27, submitted 2026-07-15.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Building plan | BMRDA - Bangalore Metropolitan Region Development Authority · No. APA/CC/1248/2023-24 · dated 2024-03-14 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (2 orders) | deputy Commissioner · No. ALN/AJ/SR/179/2014-15 and 1 more · dated 2015-06-04 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BMRDA - Bangalore Metropolitan Region Development Authority · No. APA/CC/1248/2023-24 · dated 14 Mar 2024
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 21 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Skyline Haven RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About sv infra homes
- Promoter type
- Partnership Firm
- Projects on this site
- 2
- RERA complaints against promoter
- 0
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (21 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
sv infra homes’s RERA recordsv infra homes delivery record
- 2Projects in Bengaluru on RERA2 approved registrations under sv infra homes in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 188Homes registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 homes0 complaints ÷ 188 homes in its 2 registrations on Karnataka RERA in Bengaluru.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Mar 2024
- 15 Jul 2026Quarterly update filed for Q1 2026-27: 97% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Quarterly update filed for Q4 2025-26: 95% built, 51 of 88 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 16 Jan 2026Quarterly update filed for Q3 2025-26: 91% built, 49 of 88 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 27 Sep 2024Registered with Karnataka RERA (PRM/KA/RERA/1251/308/PR/270924/007096); completion date 31 Jan 2028 Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Mar 2024Building plan approved by BMRDA - Bangalore Metropolitan Region Development Authority (No. APA/CC/1248/2023-24) Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Mar 2024Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Skyline Haven FAQs
What is the completion date for Skyline Haven?
The project completion date on RERA is 31 January 2028.
How many homes are there in Skyline Haven?
Skyline Haven has 88 homes total.
What home types are available in Skyline Haven?
The project has 2 BHK homes (64 units, 583 to 651 carpet sq ft) and 3 BHK homes (24 units, 770 carpet sq ft).
What is the RERA registration number for Skyline Haven?
The RERA registration number is PRM/KA/RERA/1251/308/PR/270924/007096.
Where is Skyline Haven located?
Skyline Haven is in Bandenallasandra, Anekal taluk, Bengaluru Urban district, PIN code 560105.
What is the construction progress of Skyline Haven?
As of Q1 2026-27 (quarter ended 30 June 2026), the project is 97% complete.
How many complaints are there against Skyline Haven on RERA?
There are no RERA complaints on this project.
How many complaints are there against SV Infra Homes on RERA?
There are no RERA complaints against the builder across all projects.
How many other projects does SV Infra Homes have in the Bengaluru RERA records?
SV Infra Homes has 2 projects total in the Bengaluru RERA records.
Which bank holds the escrow for Skyline Haven?
Federal Bank of India holds the escrow account for Skyline Haven.
Written by AI from the RERA record above on 21 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Skyline Haven
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from sv infra homes? Review the builder.
Reviews of sv infra homes by verified buyers
No verified reviews of sv infra homes yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Icon MicasaIcon Infra Shelters India Private Limited | 0.1 km | 170 | Dec 2026extended | 80% | 0 | Not collected |
| Sri Sai Nandana RegalSri Sai Nandana Builders | 0.8 km | 108 | Dec 2030 | 37% | 0 | Not collected |
| Gina ArtizeGina Engineering Company Private Limited | 1.5 km | 134 | Nov 2025 | 100% | 0 | Not collected |
| SimhadriM/s.SIGNIFA SIMHADRI PROJECTS | 1.8 km | 190 | Sep 2029 | 15% | 0 | Not collected |
| Evershine StoneParkEvershine Dwellings Pvt Ltd | 2.5 km | 117 | Sep 2030 | 18% | 0 | Not collected |
| Villa BellissimoUrbanize Land Holdings Private Limited | 2.7 km | 103 | Dec 2028 | 50% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 21 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/308/PR/270924/007096.
- RERA record last checked: 21 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 15 Jul 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects nearby
Bandenallasandra, near Electronic City Phase 2Under constructionRERA registeredBuyers’ group openIcon Micasa
by Icon Infra Shelters India
Price: Price on requestGet brochure & price →
- 3 BHK
- 606 sq ft
- Dec 2026 (extended)
170 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Icon Micasa
BandenallasandraUnder constructionRERA registeredBuyers’ group openSri Sai Nandana Regal
by Sri Sai Nandana Builders
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 718 – 1,140 sq ft
- Dec 2030
108 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Sri Sai Nandana Regal
YarandahalliReady to moveRERA registeredBuyers’ group openGina Artize
by Gina Engineering Company
Price: Price on requestGet brochure & price →
- 1 BHK, 2 BHK, 3 BHK
- 495 – 947 sq ft
- Nov 2025
134 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Gina Artize