Sri Balaji Green Woods
2 & 3 BHK apartments by Sri Balaji Infra Builders · near Mahadevapura, Bengaluru
Near Mahadevapura, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Sri Balaji Green Woods at a glance
- Possession (RERA)Dec 2028 ExtendedWas Mar 2024 · Karnataka RERA
- Construction33% built · on pace for Mar 2036 86 mo after RERA dateRERA filing to 30 Sep 2026; estimate from average pace
- Homes booked37 of 168 (22%)RERA update · as on 30 Sep 2026
- RERA complaints (project)None listedKarnataka RERA · as on 22 Oct 2026
- Approvals filed4 of 9 on RERAKarnataka RERA uploads · 22 Oct 2026
- Nearest metroHoodi · 2.02 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 89 min at peak21.94 km straight line · estimate
- Nearest lakeHoodi Lake · 557 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Sri Balaji Green Woods is a residential project by Sri Balaji Infra Builders in Bengaluru with 168 homes, registered with Karnataka RERA. The completion date on RERA is 31 Dec 2028.
Not in the RERA record we collected yet: locality. This page fills in as the record is collected.
Facts collected on 22 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Sri Balaji Green Woods buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Sri Balaji Infra Builders for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Sri Balaji Green Woods buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 2 BHK, 3 BHK
- Carpet area
- 627 – 1,013 sq ft
- Towers
- 1
- Floors
- 3
- Total homes
- 168
- Land
- 1.82 acres
- Possession (extended)
- Dec 2028
- Built (RERA update)
- 33%
Sri Balaji Green Woods RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/446/PR/150922/005240
- Registered on
- 15 Sep 2022
- Promised completion
- 31 Mar 2024
- Extended to
- 31 Dec 2028
- RERA status
- New launch
- Homes booked
- 37 of 168 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| TOWER 1 | 3 | 0 | 168 |
A dash (—) means the filing did not state that value.
Summary in plain English
Sri Balaji Green Woods is a residential project by Sri Balaji Infra Builders in Bengaluru East with 168 homes in a single 3-storey tower. The project is registered on RERA with a completion date of 31 December 2028.
Written by AI from the RERA record above on 22 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 51.7% of land
- Water and power
- Water source filed with RERA: BoreWell
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- ICICI Bank, Hoodi Circle
- Building plan (RERA)
- BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Ad.Com./MDP/0482/21-22 · dated 27 Jan 2022
- Project cost declared to RERA
- ₹88.56 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- Club House
- Outdoor Sports facility
- Indoor Sports facility
- Swimming Pool
- Gym
- Parks
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Sri Balaji Green Woods location and address
- Address
- SRI BALAJI INFRA BUILDERS, SURVEY NO.42, KHATHA SERIAL NO. 179, KODIGEHALLI, , AYYAPPA NAGAR MAIN ROAD, K R PURAM HOBLI , Bengaluru East , Bengaluru Urban, Karnataka - 560036
- Village (RERA)
- Not found in public records yet: village
- Locality
- Near Mahadevapura
- PIN code
- 560036
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.00415, 77.72136
Distances to landmarks
Not found in public records yet: landmarksAbout the locality
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 2.56 km | approx. 10 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 9.95 km | approx. 40 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 12.03 km | approx. 49 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 16.7 km | approx. 68 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 18.23 km | approx. 74 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 21.94 km | approx. 89 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 21Schools and colleges19 schools, 1 colleges, 1 kindergartens
- 21Hospitals and clinics6 hospitals, 15 clinics
Nearest schools and colleges
- Diya Academy of Learning · 0.3 km
- Bethany Toddlers Town · 0.47 km
- Mar Thoma School · 0.64 km
Nearest hospitals and clinics
- Saptagiri Health Care · 0.51 km
- Kids Health Link · 0.92 km
- Sri Krishna Poly Clinic · 0.95 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Hoodi (ಹೂಡಿ)Open now — nearest operating metro station2.02 km
- Hoodi Nearest railway station0.94 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Hoodi Lake, 557 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Hoodi Lake on OpenStreetMap (opens in a new tab) (ಹೂಡಿ ಕೆರೆ)557 m
- Kodigehalli Lake on OpenStreetMap (opens in a new tab) (ಕೊಡಿಗೇಹಳ್ಳಿ ಕೆರೆ)715 m
- Basavanapura Kere on OpenStreetMap (opens in a new tab) (ಬಸವನಪುರ ಕೆರೆ)989 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Sri Balaji Green Woods floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Brochure

BrochureFull PDF on RERA
Approved building plan3 pages

3 APPROVED BUILDING PLANFiled 16 Dec 2025 · Full PDF on RERA
Approved layout plan2 files

Approved Layout PlanFull PDF on RERA 
Existing Layout PlanFull PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 2 BHK | 668 – 780 sq ft | 104 |
| 2 BHK residential flat | 738 sq ft | 104 |
| 3 BHK | 627 – 1,013 sq ft | 64 |
| 3 BHK residential flat | 948 sq ft | 64 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Sri Balaji Green Woods possession date and construction status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
Units sold and unsold, from RERA (Q2 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 2 BHK | 104 | 18 | 86 |
| 3 BHK | 64 | 19 | 45 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 1 Feb 2022Project start date given to RERA
- 15 Sep 2022Registered with Karnataka RERA
- 31 Mar 2024Completion date given at registration
- 31 Mar 2025Section 6 Extension: completion date moved to this date
- 31 Dec 2028Further Extension: completion date moved to this date
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Mar 2036 — about 86 months after the completion date on RERA (31 Dec 2028).
- Filed on RERA
- Average pace since start
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 15 Oct 2026 | 33% | 37 of 168 |
| Q1 2026-27to 30 Jun 2026 | 15 Jul 2026 | 54% | 27 of 168 |
| Q4 2025-26to 31 Mar 2026 | 15 Apr 2026 | 52% | 27 of 168 |
| Q3 2025-26to 31 Dec 2025 | 4 Mar 2026 | 33% | 16 of 168 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 33% ÷ 55.9 months (1 Feb 2022 to 30 Sep 2026) = 0.6% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 67 ÷ 0.6 = 113.5 months → Mar 2036. This is an estimate, not a date from the builder or RERA.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
13 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Building plan | BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Ad.Com./MDP/0482/21-22 · dated 2022-01-27 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion | SPECIAL DEPUTY COMMISSIONER BANGALORE DISTRICT · No. ALN(E)SR/(KH)31/2010-11 · dated 2010-08-10 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Change of Land Use | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| District Magistrate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Ad.Com./MDP/0482/21-22 · dated 27 Jan 2022
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBNot on RERA yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 22 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Sri Balaji Green Woods RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Sri Balaji Infra Builders
- Promoter type
- Partnership Firm
- Projects on this site
- 1
- RERA complaints against promoter
- 0
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (22 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Sri Balaji Infra Builders’s RERA recordSri Balaji Infra Builders delivery record
- 1Projects in Bengaluru on RERA1 approved registration under Sri Balaji Infra Builders in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 168Homes registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 homes0 complaints ÷ 168 homes in its 1 registration on Karnataka RERA in Bengaluru.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Jan 2022
- 31 Dec 2028Completion date extended to 31 Dec 2028 Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Oct 2026Quarterly update filed for Q2 2026-27: 33% built, 37 of 168 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Quarterly update filed for Q1 2026-27: 54% built, 27 of 168 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Quarterly update filed for Q4 2025-26: 52% built, 27 of 168 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 4 Mar 2026Quarterly update filed for Q3 2025-26: 33% built, 16 of 168 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Sep 2022Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/150922/005240); completion date 31 Mar 2024 Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Feb 2022Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 27 Jan 2022Building plan approved by BBMP - Bruhat Bengaluru Mahanagara Palike (No. BBMP/Ad.Com./MDP/0482/21-22) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Sri Balaji Green Woods FAQs
What is the completion date for Sri Balaji Green Woods?
The current completion date on RERA is 31 December 2028. The original completion date was 31 March 2024, which was extended to 31 March 2025 under Section 6 Extension, and further extended to 31 December 2028.
How many homes are in Sri Balaji Green Woods?
The project has 168 homes in total.
What home types are available in Sri Balaji Green Woods?
The project offers 2 BHK and 3 BHK homes. 2 BHK units have carpet area between 668 and 780 sq ft, while 3 BHK units range from 627 to 1,013 sq ft.
What is the RERA registration number for Sri Balaji Green Woods?
The RERA registration number is PRM/KA/RERA/1251/446/PR/150922/005240, registered on 15 September 2022.
Where is Sri Balaji Green Woods located?
The project is in Bengaluru East, PIN code 560036.
What is the construction progress of Sri Balaji Green Woods?
As of Q2 2026-27 (quarter ended 30 September 2026), the project is 33% complete with 37 homes booked out of 168.
Are there any RERA complaints against Sri Balaji Green Woods?
There are no RERA complaints on this project.
Are there any RERA complaints against Sri Balaji Infra Builders?
There are no RERA complaints against the builder across all projects on record.
Who is the builder of Sri Balaji Green Woods?
The builder is Sri Balaji Infra Builders, a Partnership Firm.
What is the land area of Sri Balaji Green Woods?
The land area is 7,385 sq m.
Written by AI from the RERA record above on 22 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Sri Balaji Green Woods
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Sri Balaji Infra Builders? Review the builder.
Reviews of Sri Balaji Infra Builders by verified buyers
No verified reviews of Sri Balaji Infra Builders yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| 2g TULATogetherments Infra Pvt Ltd | 0.3 km | 186 | Dec 2027extended | 78% | 0 | Not collected |
| Aryav WindfieldsAryav Constructions | 0.5 km | 97 | Dec 2027 | 65% | 0 | Not collected |
| Sri Balaji Rose WoodsSri Balaji Ventures | 0.5 km | 449 | Dec 2025 | — | 0 | Not collected |
| Garuda GrandBalaji Buildres | 0.5 km | 136 | Mar 2028extended | 87% | 0 | Not collected |
| Jai Fortune SquareJai Builders | 0.6 km | 136 | Dec 2025 | — | 0 | Not collected |
| Jai SignatureJai Shelters , H.A.Venugopal & 10 Others | 0.7 km | 50 | Mar 2028 | — | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 22 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/446/PR/150922/005240.
- RERA record last checked: 22 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 22 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects nearby
Hoodi, MahadevapuraUnder constructionRERA registeredBuyers’ group open2g TULA
by Togetherments Infra
Price: Price on requestGet brochure & price →
- 3 BHK
- 1,049 – 1,198 sq ft
- Dec 2027 (extended)
186 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for 2g TULA
Kodigehalli, HebbalUnder constructionRERA registeredBuyers’ group openAryav Windfields
by Aryav Constructions
Price: Price on requestGet brochure & price →
- 2 BHK, 2.5 BHK, 3 BHK
- 803 – 1,399 sq ft
- Dec 2027
97 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Aryav Windfields
Kodigehall, near MahadevapuraReady to moveRERA registeredBuyers’ group openSri Balaji Rose Woods
by Sri Balaji Ventures
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 680 – 1,059 sq ft
- Dec 2025
449 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Sri Balaji Rose Woods