Skip to content
Log in

Sri Nanjundeshwara Residency

2 & 3 BHK apartments by Sri Nanjundeshwara Infratech · Kengeri, Mysore Road, Bengaluru

Kengeri, Mysore Road, BengaluruOpen on Google Maps (opens in a new tab)

  • Under construction
  • RERA registered
  • residential

by Sri Nanjundeshwara Infratech

Price: Price on request

Get brochure, floor plans & price

Brochure, floor plans and price list for Sri Nanjundeshwara Residency

Builders share their brochure, floor plans and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Project summary

Sri Nanjundeshwara Residency is a residential project by Sri Nanjundeshwara Infratech in Kengeri, Bengaluru with 16 homes, registered with Karnataka RERA. The completion date on RERA is 31 Dec 2027.

Facts collected on 20 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.

Sri Nanjundeshwara Residency buyers’ group: join to ask for a group price

No one has joined yet. Be one of the first 10 buyers in this group — the founding members.

Join free. When enough buyers have joined, our agent partner asks Sri Nanjundeshwara Infratech for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.

  1. Gathering buyers
  2. Talking to the builder
  3. Group offer
  4. Group site visit
  5. Booking

0 buyers have joined · 0 committed

Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.

Join the Sri Nanjundeshwara Residency buyers’ groupHow group buying works

See it for yourself

Visit the site with our team, or get a call to clear your questions. Free, no obligation.

Key facts: home types, towers, land and possession

Updated on 20 Oct 2026
Home types
2 BHK, 3 BHK
Carpet area
1,040 – 1,555 sq ft
Towers
1
Floors
4
Total homes
16
Land
0.2 acres
Possession (RERA)
Dec 2027
Built (RERA update)
80%

Sri Nanjundeshwara Residency RERA number and registration details

RERA number
PRM/KA/RERA/1251/310/PR/220125/007410
Registered on
22 Jan 2025
Promised completion
31 Dec 2027
Extended to
No extension recorded
RERA status
New launch
Homes booked
8 of 16 as on
Price
Not found in public records yet: price
Project type
Residential

Towers and blocks (RERA filing)

TowerFloorsBasementsHomes
SRI NANJUNDESHWARA RESIDENCY4116

A dash (—) means the filing did not state that value.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Summary in plain English

Sri Nanjundeshwara Residency is a 16-home residential project by Sri Nanjundeshwara Infratech in Kengeri, Bengaluru South. The single tower has 2 BHK and 3 BHK homes across 4 floors, registered with RERA on 22 January 2025. Completion is scheduled for 31 December 2027.

Written by AI from the RERA record above on 20 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.

Open space, home loans, escrow and other details

Open space
42.2% of land
Water and power
Water source filed with RERA: BoreWell,BWSSB
Home loans: approved banks
Not found in public records yet: bank approvals
Payment plans
Not found in public records yet: payment plans
Maintenance
Not found in public records yet: maintenance
Car parking
Not found in public records yet: car parking charge
Escrow bank (RERA)
Axis Bank, SRINIVASNAGAR
Building plan (RERA)
BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/AD.COM/RJH/0680/24-25 · dated 31 Jul 2024
Project cost declared to RERA
₹13.24 Cr

Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Amenities

  • Electricity
  • Power Backup
  • Piped Gas
  • Water and Sanitation

Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sri Nanjundeshwara Residency location and address

Address
SY NO 82/5, (NEW SY NO 82/7), KATHA NO 853/4666/82/5/4666, , KENGERI VILLAGE, KENGERI HOBLI, BANGALORE IN WARD NO 198 , Bengaluru South , Bengaluru Urban, Karnataka - 560060
Village (RERA)
Kengeri
Locality
Mysore RoadAlso known as Mysuru Road, Mysore Main Road
PIN code
560060
City
Bengaluru
State
Karnataka
Coordinates
12.90180, 77.45370

Distances to landmarks

Not found in public records yet: landmarks

About Mysore Road

Not found in public records yet: locality facts

Commute times to tech parks and the airport

As on 5 Oct 2026
ToStraight linePeak-hour drive (estimate)
KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab)15.16 kmapprox. 61 min
Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab)23.62 kmapprox. 96 min
Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab)24.27 kmapprox. 98 min
Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab)24.78 kmapprox. 100 min
ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab)32.23 kmapprox. 131 min
Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab)42.92 kmapprox. 174 min
How we calculate

Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.

Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.

Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this

Schools and hospitals nearby

As on 5 Oct 2026

Within 2 km

  • 13Schools and colleges4 schools, 9 colleges, 0 kindergartens
  • 2Hospitals and clinics2 hospitals, 0 clinics

Nearest schools and colleges

  • De Paul Institute of Religion and Philosopgy · 0.87 km
  • Marigold International School · 1.16 km
  • IBS business school · 1.19 km

Nearest hospitals and clinics

  • SDM Institute of Ayurveda & Hospital · 0.97 km
  • Rajarajeshwari Hospital and Medical College · 1.09 km

Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Nearest metro station and railway

As on 5 Oct 2026
  • Challaghatta (ಚಲ್ಲಘಟ್ಟ)Open now — nearest operating metro station0.96 km
  • Kengeri (ಕೆಂಗೇರಿ)Nearest railway station3.7 km

Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Lake and lake-buffer check

As on 5 Oct 2026

The nearest mapped lake is Anchepalya Lake, 1,302 m from the project’s RERA map point.

The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.

The buffer rule

Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.

Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this

Satellite time-lapse of the site

Satellite photos load when you scroll to them.

Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.

Sources:Source (livingatlas.arcgis.com) (opens in a new tab)

Sri Nanjundeshwara Residency home types and carpet areas

Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.

Approved building plan

Approved layout plan2 files

Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.

Get brochure, floor plans & price

Brochure, floor plans and price list for Sri Nanjundeshwara Residency

Builders share their brochure, floor plans and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Home typeCarpet areaHomes
2 BHK1,040 – 1,140 sq ft8
3 BHK1,365 – 1,555 sq ft8

Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).

We have not collected floor-plan drawings; the builder’s sales team can share them.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sri Nanjundeshwara Residency possession date and construction status

  • Whole project (promoter’s RERA update)80%

    as on · 8 of 16 homes booked

Promoter’s quarterly update to RERA for Q4 2025-26, submitted 2026-09-21.

Units sold and unsold, from RERA (Q4 2025-26)

TypeHomesBookedAvailable
2 BHK826
3 BHK862

As reported by the promoter in the quarterly update to RERA, not verified by us.

Timeline

  1. 1 Aug 2024Project start date given to RERA
  2. 22 Jan 2025Registered with Karnataka RERA
  3. 31 Dec 2027Completion date given at registration

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Construction pace from RERA quarterly filings

As on 21 Sep 2026

At the average pace so far, construction would reach 100% around Aug 2026 — about 16 months before the completion date on RERA (31 Dec 2027).

At the pace between the 2 quarterly filings we have (74% → 80% in 3 months), it would be around Jan 2027 — about 11 months before the RERA date.

0%25%50%75%100%2025202620272028RERA date74%80%
  • Filed on RERA
  • Average pace since start
  • Pace between filings (and 0% assumed at the start date)
  • RERA completion date

Quarterly filings

QuarterFiled onBuiltHomes booked
Q4 2025-26to 31 Mar 202621 Sep 202680%8 of 16
Q3 2025-26to 31 Dec 202521 Sep 202674%5 of 16
How we calculate

Average pace = % built ÷ months since the start date in the RERA record. Here: 80% ÷ 19.9 months (1 Aug 2024 to 31 Mar 2026) = 4% a month.

Estimated finish = latest filing date + (100 − % built) ÷ pace = 31 Mar 2026 + 20 ÷ 4 = 5 months → Aug 2026. This is an estimate, not a date from the builder or RERA.

Pace between filings = (80% − 74%) ÷ 3 months = 2% a month.

A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q4 2025-26, submitted 2026-09-21.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

Approvals and documents checklist

12 rows: approvals. Scroll inside the table to see them all.

ApprovalAuthoritySource
Building planBBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/AD.COM/RJH/0680/24-25 · dated 2024-07-31Source (rera.karnataka.gov.in) (opens in a new tab)
Land conversionBDA · No. GC-577/1987 · dated 2010-08-26Source (rera.karnataka.gov.in) (opens in a new tab)
Commencement Certificatescan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Electricity Permission Letterscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Water Permission Letterscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Layout Planscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Building/Plotting Planscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Section Of Building/Infrastructure Plan of Plottingscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Change of Land Usescan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Conversion Certificate under section 95 of the KLR Act 1964scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
ESCOM/Electricityscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KWSSB/Waterscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)

Documents uploaded to RERA

As on 20 Oct 2026
  • Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/AD.COM/RJH/0680/24-25 · dated 31 Jul 2024
  • Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Environment clearance · SEIAA KarnatakaNot on RERA yet
  • Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
  • Pollution board consent · KSPCBNot on RERA yet
  • Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Height clearance · Airports Authority of IndiaNot on RERA yet
  • Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion

From the documents the promoter uploaded to Karnataka RERA, collected 20 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sri Nanjundeshwara Residency RERA complaints

No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)

Court and consumer cases

Not found in public records yet: court cases

We list case numbers, courts and outcomes only — never names of private individuals.

About Sri Nanjundeshwara Infratech

Promoter type
Partnership Firm
Projects on this site
1
RERA complaints against promoter
0
Company number (CIN)
Not found in public records yet: CIN

From Karnataka RERA, as collected so far (20 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.

Sri Nanjundeshwara Infratech’s RERA record

Sri Nanjundeshwara Infratech delivery record

As on 20 Oct 2026

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

What’s changed since Jul 2024

As on 20 Oct 2026
  1. 21 Sep 2026Quarterly update filed for Q3 2025-26: 74% built, 5 of 16 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  2. 21 Sep 2026Quarterly update filed for Q4 2025-26: 80% built, 8 of 16 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  3. 22 Jan 2025Registered with Karnataka RERA (PRM/KA/RERA/1251/310/PR/220125/007410); completion date 31 Dec 2027 Source (rera.karnataka.gov.in) (opens in a new tab)
  4. 1 Aug 2024Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
  5. 31 Jul 2024Building plan approved by BBMP - Bruhat Bengaluru Mahanagara Palike (No. BBMP/AD.COM/RJH/0680/24-25) Source (rera.karnataka.gov.in) (opens in a new tab)

Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.

Home loan EMI calculator

No listed price found — enter one to try.

Example only — use your bank’s quote.

Monthly EMI
—
Down payment
—
Loan amount
—
Total interest
—

A calculation only, from the numbers you enter — not a loan offer.

All-in cost: GST, registration and other charges

The calculator loads when you scroll to it.

Assumptions
  • Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
  • GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
  • Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
  • Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
  • Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.

How we calculate this

Sri Nanjundeshwara Residency FAQs

What is the completion date for Sri Nanjundeshwara Residency?

The project is scheduled to be completed on 31 December 2027, as recorded in the RERA registration.

How many homes are in Sri Nanjundeshwara Residency?

The project has 16 homes in total: 8 units of 2 BHK and 8 units of 3 BHK.

What are the carpet area ranges in Sri Nanjundeshwara Residency?

The 2 BHK homes range from 1,040 to 1,140 sq ft carpet area, and the 3 BHK homes range from 1,365 to 1,555 sq ft carpet area.

What is the RERA registration number for Sri Nanjundeshwara Residency?

The RERA registration number is PRM/KA/RERA/1251/310/PR/220125/007410, registered on 22 January 2025.

How many homes are booked in Sri Nanjundeshwara Residency?

As of Q4 2025-26 (ended 31 March 2026), 8 homes out of 16 are booked, with all 16 homes in the booking table.

What is the construction progress of Sri Nanjundeshwara Residency?

The project was 80% complete as of Q4 2025-26 (ended 31 March 2026).

Where is Sri Nanjundeshwara Residency located?

The project is located in Kengeri, Bengaluru South taluk, Bengaluru Urban district, PIN code 560060.

Are there any RERA complaints on Sri Nanjundeshwara Residency?

There are no RERA complaints on this project or against the builder Sri Nanjundeshwara Infratech.

What bank handles the escrow for Sri Nanjundeshwara Residency?

Axis Bank is the escrow bank for the project.

How many towers and floors does Sri Nanjundeshwara Residency have?

The project has 1 tower with a maximum of 4 floors.

Written by AI from the RERA record above on 20 Oct 2026. Answers use only that record; check them against the source before you decide.

Questions about Sri Nanjundeshwara Residency

No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.

Bought a home from Sri Nanjundeshwara Infratech? Review the builder.

Reviews of Sri Nanjundeshwara Infratech by verified buyers

No verified reviews of Sri Nanjundeshwara Infratech yet. If you bought a home from them, your review helps other buyers.

How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.

Similar projects within 5 km

ProjectDistanceHomesPossession (RERA)BuiltComplaintsPrice
Brigade HorizonBrigade Enterprises Limited1.8 km372Dec 2026100%0Not collected
Urban Nest By 5 Elements5 Elements Homes1.9 km288Dec 202924%0Not collected
DS Max SamyakDS Max Properties Private Limited1.9 km600Jan 2028100%0Not collected
SBR Global Queens VilleSBR Builders1.9 km441Dec 202910%0Not collected
Vaarahi VivareaVaarahi Constructions1.9 km168Jun 202793%0Not collected
Good Earth MotifGood Earth Eco Developments Private Limited2.2 km76Mar 2026—0Not collected

Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sources and last checked dates

  1. Karnataka RERA — project register (search by the registration number) (opens in a new tab)

Collected on 20 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.

How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/310/PR/220125/007410.

  • RERA record last checked: 20 Oct 2026
  • Last change in the record (registration, quarterly filing or complaint): 21 Sep 2026

How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error

More new projects in Mysore Road