Sri Sri Sattva
2, 3 & 4 BHK apartments by Sri Sumeru Realty Private Limited · Kaggalipura, Kanakapura Road, Bengaluru
Kaggalipura, Kanakapura Road, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
by Sri Sumeru Realty Private Limited
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Sri Sri Sattva at a glance
- Possession (RERA)Mar 2033Karnataka RERA
- Construction27% built · on pace for Apr 2030RERA filing to 30 Sep 2026; estimate from average pace
- Homes booked199 of 418 (48%)RERA update · as on 30 Sep 2026
- RERA complaints (project)None listedKarnataka RERA · as on 18 Oct 2026
- Approvals filed8 of 9 on RERAKarnataka RERA uploads · 18 Oct 2026
- Nearest metroSilk Institute · 5.79 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 194 min at peak47.96 km straight line · estimate
Project summary
Sri Sri Sattva is a residential project by Sri Sumeru Realty Private Limited in Kaggalipura, Bengaluru with 418 homes, registered with Karnataka RERA. The completion date on RERA is 31 Mar 2033.
Facts collected on 18 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Sri Sri Sattva buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Sri Sumeru Realty Private Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Sri Sri Sattva buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 2 BHK, 3 BHK, 4 BHK
- Carpet area
- 787 – 6,137 sq ft
- Towers
- 5
- Floors
- 23
- Total homes
- 418
- Land
- 9.61 acres
- Possession (RERA)
- Mar 2033
- Built (RERA update)
- 27%
Sri Sri Sattva RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/310/PR/300625/007883
- Registered on
- 30 Jun 2025
- Promised completion
- 31 Mar 2033
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- 199 of 418 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| Tower A | 20 | 3 | 76 |
| Tower B | 21 | 3 | 78 |
| Tower C | 22 | 3 | 84 |
| Tower D | 23 | 3 | 88 |
| Tower E | 23 | 3 | 92 |
A dash (—) means the filing did not state that value.
Summary in plain English
Sri Sri Sattva is a residential project by Sri Sumeru Realty Private Limited in Kaggalipura, Bengaluru South, with 418 homes across 5 towers. The project includes 2 BHK, 3 BHK, 4 BHK, duplex, and penthouse units, plus 6 commercial blocks, registered with completion on 31 March 2033.
Written by AI from the RERA record above on 18 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 86.8% of land
- Water and power
- Water source filed with RERA: Local Authority
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- HDFC, Kaggalipura Branch
- Building plan (RERA)
- Kanakapura Planning Authority · No. 131/2024-25/3264 · dated 7 Mar 2025
- Project cost declared to RERA
- ₹472 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- CCTV Surveillance
- Club House
- Community Hall
- Outdoor Sports facility
- Indoor Sports facility
- Swimming Pool
- Gym
- Parks
- Power Backup
- Water and Sanitation
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Sri Sri Sattva location and address
- Address
- Sy No. 109, 112, 113/3 , Kaggalipura Village, Uttarahalli Hobli , Bengaluru South , Bengaluru Urban, Karnataka - 560082
- Village (RERA)
- Kaggalipura
- Locality
- Kanakapura RoadAlso known as Kanakapura Main Road
- PIN code
- 560082
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.81556, 77.50519
Distances to landmarks
Not found in public records yet: landmarksAbout Kanakapura Road
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 17.73 km | approx. 72 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 19.38 km | approx. 78 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 22.56 km | approx. 91 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 28.69 km | approx. 116 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 31.65 km | approx. 128 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 47.96 km | approx. 194 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 2Schools and colleges0 schools, 2 colleges, 0 kindergartens
- 9Hospitals and clinics6 hospitals, 3 clinics
Nearest schools and colleges
- Dayananda Sagar Academy of Technology and Management · 1.5 km
- Sri Sri Institute · 1.88 km
Nearest hospitals and clinics
- St. John's Health Centre · 0.61 km
- Government Hospital · 1.36 km
- Kaggalipura Government Hospital · 1.4 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Silk Institute (ರೇಷ್ಮೆ ಸಂಸ್ಥೆ)Open now — nearest operating metro station5.79 km
- Hejjala (ಹೆಜ್ಜಾಲ)Nearest railway station10.1 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Sri Sri Sattva floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Elevations3 files

7 TOWER - C Elevation PlanFiled 25 Jun 2025 · Full PDF on RERA 
7 TOWER - D ElevationFiled 25 Jun 2025 · Full PDF on RERA 
7 TOWER - E Elevation PlanFiled 25 Jun 2025 · Full PDF on RERA
Approved building plan4 files

Approved Building PlanFull PDF on RERA 
6 TOWER - A Building PlanFiled 25 Jun 2025 · Full PDF on RERA 
6 TOWER - B Building PlanFiled 25 Jun 2025 · Full PDF on RERA 
Building Plan Approval - GBDA.pdfFull PDF on RERA
Approved layout plan

5 Project Location and DemarcationFiled 25 Jun 2025 · Full PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 2 BHK | 787 – 1,006 sq ft | 138 |
| 3 BHK | 1,003 – 1,344 sq ft | 156 |
| 4 BHK | 1,542 – 2,530 sq ft | 88 |
| Commercial block | 6,137 sq ft | 6 |
| Duplex | 1,766 – 2,530 sq ft | 16 |
| Pent house | 1,662 – 3,211 sq ft | 20 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Sri Sri Sattva possession date and construction status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-14.
By tower (Q2 2026-27)
Units sold and unsold, from RERA (Q2 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 2 BHK | 138 | 72 | 66 |
| DUPLEX | 12 | 1 | 11 |
| PENT HOUSE | 20 | 14 | 6 |
| 3 BHK | 156 | 78 | 78 |
| 4 BHK | 92 | 34 | 58 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 13 Jun 2025Project start date given to RERA
- 30 Jun 2025Registered with Karnataka RERA
- 31 Mar 2033Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Apr 2030 — about 36 months before the completion date on RERA (31 Mar 2033).
At the pace between the 4 quarterly filings we have (13% → 27% in 9 months), it would be around Aug 2030 — about 31 months before the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 14 Oct 2026 | 27% | 199 of 418 |
| Q1 2026-27to 30 Jun 2026 | 15 Jul 2026 | 24% | 185 of 418 |
| Q4 2025-26to 31 Mar 2026 | 14 Apr 2026 | 15% | 151 of 418 |
| Q3 2025-26to 31 Dec 2025 | 30 Mar 2026 | 13% | 145 of 418 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 27% ÷ 15.6 months (13 Jun 2025 to 30 Sep 2026) = 1.7% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 73 ÷ 1.7 = 42.1 months → Apr 2030. This is an estimate, not a date from the builder or RERA.
Pace between filings = (27% − 13%) ÷ 9 months = 1.6% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-14.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Building plan | Kanakapura Planning Authority · No. 131/2024-25/3264 · dated 2025-03-07 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (3 orders) | Deputy Commissioner office bengaluru Urban · No. 34831 and 2 more · dated 2024-10-05 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — Kanakapura Planning Authority · No. 131/2024-25/3264 · dated 7 Mar 2025
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 18 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Sri Sri Sattva RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Sri Sumeru Realty Private Limited
- Promoter type
- Company
- Projects on this site
- 3
- RERA complaints against promoter
- 0
- Company number (CIN)
- U07010KA2005PTC035470
From Karnataka RERA, as collected so far (18 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Sri Sumeru Realty Private Limited’s RERA recordSri Sumeru Realty Private Limited delivery record
- 3Projects in Bengaluru on RERA3 approved registrations under Sri Sumeru Realty Private Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 608Homes and plots registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 homes and plots0 complaints ÷ 608 homes and plots in its 3 registrations on Karnataka RERA in Bengaluru.
- 1Completion filed on RERARegistrations where the promoter applied to RERA for completion; 0 with an occupancy certificate on RERA.
- 1 of 1Filed by the date given at registrationMedian gap 0 months (on-time ones count as 0). The completion application can come after handover, so this is an upper bound on lateness.
Completion filed on RERA
| Project | Date at registration | Completion filed | Gap |
|---|---|---|---|
| Sri Sri Nagar | 31 Mar 2026 | 31 Mar 2026 | By the date |
Measured against the completion date given at registration; many projects had RERA extensions (including the COVID-period extension), shown under the date.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Mar 2025
- 14 Oct 2026Quarterly update filed for Q2 2026-27: 27% built, 199 of 418 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Quarterly update filed for Q1 2026-27: 24% built, 185 of 418 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Apr 2026Quarterly update filed for Q4 2025-26: 15% built, 151 of 418 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 30 Mar 2026Quarterly update filed for Q3 2025-26: 13% built, 145 of 418 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 30 Jun 2025Registered with Karnataka RERA (PRM/KA/RERA/1251/310/PR/300625/007883); completion date 31 Mar 2033 Source (rera.karnataka.gov.in) (opens in a new tab)
- 13 Jun 2025Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 7 Mar 2025Building plan approved by Kanakapura Planning Authority (No. 131/2024-25/3264) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Sri Sri Sattva FAQs
What is the RERA registration number for Sri Sri Sattva?
The RERA registration number is PRM/KA/RERA/1251/310/PR/300625/007883, registered on 30 June 2025.
When will Sri Sri Sattva be completed?
The completion date on RERA is 31 March 2033.
How many homes are in Sri Sri Sattva?
The project has 418 homes across 5 towers with a maximum of 23 floors.
What home types are available in Sri Sri Sattva?
Sri Sri Sattva offers 2 BHK (787 to 1,006 sq ft carpet area), 3 BHK (1,003 to 1,344 sq ft), 4 BHK (1,542 to 2,530 sq ft), duplex (1,766 to 2,530 sq ft), and penthouse (1,662 to 3,211 sq ft) units, plus 6 commercial blocks.
Where is Sri Sri Sattva located?
Sri Sri Sattva is in Kaggalipura, Bengaluru South taluk, Bengaluru Urban district, PIN code 560082.
How many homes have been booked in Sri Sri Sattva?
As of Q2 2026-27 (quarter ended 30 September 2026), 199 homes have been booked out of 418.
What is the construction progress of Sri Sri Sattva?
As of Q2 2026-27, construction is 27 percent complete.
Are there any RERA complaints on Sri Sri Sattva?
There are no RERA complaints on this project or against the builder Sri Sumeru Realty Private Limited.
What is the land area of Sri Sri Sattva?
The project is on a land area of 38,900 square metres.
How many other projects does Sri Sumeru Realty Private Limited have on RERA record?
Sri Sumeru Realty Private Limited has 4 projects in the Karnataka RERA Bengaluru records.
Written by AI from the RERA record above on 18 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Sri Sri Sattva
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Sri Sumeru Realty Private Limited? Review the builder.
Reviews of Sri Sumeru Realty Private Limited by verified buyers
No verified reviews of Sri Sumeru Realty Private Limited yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Azalea at Brigade MeadowsBrigade Enterprises Limited | 0.6 km | 40 | Jul 2029 | 37% | 0 | from ₹1.25 Cr |
| GRC Saffron SkiesGRC Infra | 0.8 km | 81 | Mar 2028 | 48% | 0 | Not collected |
| Bren AvaanaBren Corporation Private Limited | 0.8 km | 327 | Feb 2028 | 20% | 0 | Not collected |
| Primus DarpanAmeliorate Realtors Private Limited | 0.8 km | 173 | Dec 2029 | 63% | 0 | Not collected |
| Aarohana AlterraAarohana Projects | 0.8 km | 518 | Aug 2033 | 2% | 0 | Not collected |
| Bren AnantaBren Corporation Private Limited | 0.9 km | 217 | Aug 2027 | 9% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 18 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/310/PR/300625/007883.
- RERA record last checked: 18 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 18 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Kanakapura Road
Kaggalipura, Kanakapura RoadUnder constructionRERA registeredBuyers’ group openAzalea at Brigade Meadows
by Brigade Enterprises
Price: Price on requestGet brochure & price →
- 1 BHK, 2 BHK
- 516 – 824 sq ft
- Jul 2029
40 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Azalea at Brigade Meadows
Uttari, Kanakapura RoadUnder constructionRERA registeredBuyers’ group openGRC Saffron Skies
by GRC Infra
Price: Price on requestGet brochure & price →
- 3 BHK, 4 BHK
- 1,776 – 2,562 sq ft
- Mar 2028
81 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for GRC Saffron Skies
Kaggalipura, Kanakapura RoadUnder constructionRERA registeredBuyers’ group openBren Avaana
by Bren Corporation
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 778 – 1,049 sq ft
- Feb 2028
327 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Bren Avaana