Subram Jade Gardens at a glance
- Possession (RERA)Dec 2026 ExtendedWas Aug 2024 · Karnataka RERA
- Construction85% built · on pace for Jun 2027 5 mo after RERA dateRERA filing to 30 Jun 2026; estimate from average pace
- Homes booked110 of 350 (31%)RERA update · as on 30 Jun 2026
- RERA complaints (project)None listedKarnataka RERA · as on 12 Oct 2026
- Approvals filed1 of 9 on RERAKarnataka RERA uploads · 12 Oct 2026
- Nearest metroManjunathanagara · 1.08 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 117 min at peak28.97 km straight line · estimate
- Nearest lakeDoddabidirakallu Kere · 95 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Subram Jade Gardens is a residential project by Subram Builders in Bengaluru with 350 homes, registered with Karnataka RERA. The completion date on RERA is 31 Dec 2026.
Not in the RERA record we collected yet: locality. This page fills in as the record is collected.
Facts collected on 12 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Subram Jade Gardens buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Subram Builders for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Subram Jade Gardens buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 1 BHK, 2 BHK, 3 BHK
- Carpet area
- 433 – 1,469 sq ft
- Towers
- 3
- Floors
- 4
- Total homes
- 350
- Land
- 3.02 acres
- Possession (extended)
- Dec 2026
- Built (RERA update)
- 85%
Subram Jade Gardens RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/309/PR/210804/004238
- Registered on
- 4 Aug 2021
- Promised completion
- 31 Aug 2024
- Extended to
- 31 Dec 2026
- RERA status
- New launch
- Homes booked
- 110 of 350 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| Block A | 4 | 1 | 70 |
| Block B | 4 | 1 | 10 |
| Block C | 4 | 1 | 95 |
A dash (—) means the filing did not state that value.
Summary in plain English
Subram Jade Gardens is a residential project by Subram Builders in Bengaluru North with 350 homes across 3 towers. The project was registered on the RERA record with a completion date of 31 December 2026.
Written by AI from the RERA record above on 12 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 63.3% of land
- Water and power
- Not found in public records yet: water and power
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- HDFC, MILLERS ROAD
- Project cost declared to RERA
- ₹46.9 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
Subram Jade Gardens location and address
- Address
- Sy no 165, Municpal No 06/165, Doddabidrakallu, Yashwanthpura Hobli, Bangalore North, Bangalore 560094
- Village (RERA)
- Not found in public records yet: village
- Locality
- Tumkur RoadAlso known as Tumakuru Road, Tumkur Main Road, NH 48 (Tumkur Road)
- PIN code
- 560040
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.04043, 77.49355
Distances to landmarks
Not found in public records yet: landmarksAbout Tumkur Road
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 10.76 km | approx. 44 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 13.71 km | approx. 56 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 24.12 km | approx. 98 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 27.1 km | approx. 110 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 28.2 km | approx. 114 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 28.97 km | approx. 117 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 19Schools and colleges15 schools, 4 colleges, 0 kindergartens
- 10Hospitals and clinics7 hospitals, 3 clinics
Nearest schools and colleges
- Sri Chaitanya Techno School · 0.39 km
- Sacred Heart College of Nursing · 1.28 km
- Ganga International School · 1.33 km
Nearest hospitals and clinics
- Nandi Clinic · 1.08 km
- naveen clinc · 1.25 km
- Jyothis Health Centre · 1.34 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Manjunathanagara (ಮಂಜುನಾಥನಗರ)Open now — nearest operating metro station1.08 km
- Chikka Banavara (ಚಿಕ್ಕ ಬಾಣವಾರ)Nearest railway station4.03 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Doddabidirakallu Kere, 95 m from the project’s RERA map point.
The site may be next to the lake. The RERA point is one approximate spot and the site boundary is not published as a shape — check the approved plan for the lake buffer.
- Doddabidirakallu Kere on OpenStreetMap (opens in a new tab) (ದೊಡ್ಡಬಿದರಕಲ್ಲು ಕೆರೆ)95 m
- Anchepalya Lake on OpenStreetMap (opens in a new tab) (ಅಂಚೇಪಾಳ್ಯ ಕೆರೆ)1,616 m
- Narasappanahalli Lake on OpenStreetMap (opens in a new tab) 1,811 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Subram Jade Gardens floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Floor plans

Ground Floor PlanFiled 12 Jun 2021 · Full PDF on RERA
Approved building plan2 files

Project PlanFull PDF on RERA 
BBMP Sanction Plan.pdfFull PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 1 BHK | 433 – 526 sq ft | 10 |
| 1 BHK + 1stdy + 1t | 525 sq ft | 5 |
| 1 BHK + 1t | 433 sq ft | 5 |
| 2 BHK | 810 – 982 sq ft | 120 |
| 2 BHK + 1stdy + 2t | 982 sq ft | 15 |
| 2 BHK + 2t | 826 sq ft | 105 |
| 3 BHK | 999 – 1,469 sq ft | 45 |
| 3 BHK + 2t | 1,020 sq ft | 35 |
| 3 BHK + 3t | 1,469 sq ft | 10 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Subram Jade Gardens possession date and construction status
Promoter’s quarterly update to RERA for Q1 2026-27, submitted 2026-07-14.
By tower (Q1 2026-27)
Units sold and unsold, from RERA (Q1 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 1 BHK | 10 | 8 | 2 |
| 2 BHK | 120 | 69 | 51 |
| 3 BHK | 45 | 33 | 12 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 1 Feb 2021Project start date given to RERA
- 4 Aug 2021Registered with Karnataka RERA
- 31 Aug 2024Completion date given at registration
- 31 Aug 2025Section 6 Extension: completion date moved to this date
- 31 Dec 2026Further Extension: completion date moved to this date
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Jun 2027 — about 5 months after the completion date on RERA (31 Dec 2026).
At the pace between the 3 quarterly filings we have (75% → 85% in 6 months), it would be around Mar 2027 — about 3 months after the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q1 2026-27to 30 Jun 2026 | 14 Jul 2026 | 85% | 110 of 175 |
| Q4 2025-26to 31 Mar 2026 | 25 Apr 2026 | 80% | 109 of 175 |
| Q3 2025-26to 31 Dec 2025 | 14 Feb 2026 | 75% | 103 of 175 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 85% ÷ 64.9 months (1 Feb 2021 to 30 Jun 2026) = 1.3% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Jun 2026 + 15 ÷ 1.3 = 11.4 months → Jun 2027. This is an estimate, not a date from the builder or RERA.
Pace between filings = (85% − 75%) ÷ 5.9 months = 1.7% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q1 2026-27, submitted 2026-07-14.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Building plan | BBMP - Bruhat Bengaluru Mahanagara Palike | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Commencement certificate · Permission to start buildingNot on RERA yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBNot on RERA yet
- Water and sewerage · BWSSBNot on RERA yet
- Electricity · BESCOMNot on RERA yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 12 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Subram Jade Gardens RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Subram Builders
- Promoter type
- Proprietorship Firm
- Projects on this site
- 1
- RERA complaints against promoter
- 0
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (12 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Subram Builders’s RERA recordSubram Builders delivery record
- 1Projects in Bengaluru on RERA1 approved registration under Subram Builders in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 350Homes registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 homes0 complaints ÷ 350 homes in its 1 registration on Karnataka RERA in Bengaluru.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Feb 2021
- 31 Dec 2026Completion date extended to 31 Dec 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Jul 2026Quarterly update filed for Q1 2026-27: 85% built, 110 of 175 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 25 Apr 2026Quarterly update filed for Q4 2025-26: 80% built, 109 of 175 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Feb 2026Quarterly update filed for Q3 2025-26: 75% built, 103 of 175 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 4 Aug 2021Registered with Karnataka RERA (PRM/KA/RERA/1251/309/PR/210804/004238); completion date 31 Aug 2024 Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Feb 2021Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Subram Jade Gardens FAQs
What is the completion date for Subram Jade Gardens?
The current completion date on the RERA record is 31 December 2026. The project originally had a completion date of 31 August 2024, which was extended to 31 August 2025 under Section 6 Extension, and further extended to 31 December 2026.
What home types are available in Subram Jade Gardens?
The project offers 1 BHK, 2 BHK, and 3 BHK homes in various configurations with and without study areas and different numbers of toilets. Carpet areas range from 433 sq ft to 1,469 sq ft.
How many homes are in Subram Jade Gardens?
The project has 350 homes in total across 3 towers.
What is the RERA registration number for Subram Jade Gardens?
The RERA registration number is PRM/KA/RERA/1251/309/PR/210804/004238, registered on 4 August 2021.
Where is Subram Jade Gardens located?
The project is located in Bengaluru North taluk, Bengaluru Urban district, with PIN code 560040.
What is the construction progress of Subram Jade Gardens?
As of Q1 2026-27 (quarter ended 30 June 2026), the project is 85% complete with 110 homes booked and 175 homes in the booking table.
Are there any RERA complaints against Subram Jade Gardens?
There are no RERA complaints against this project on the RERA record.
Who is the builder of Subram Jade Gardens?
The builder is Subram Builders, a proprietorship firm with no RERA complaints against any of their projects.
What is the land area of Subram Jade Gardens?
The land area is 12,241 sq metres.
How many towers does Subram Jade Gardens have?
The project has 3 towers with a maximum of 4 floors each.
Written by AI from the RERA record above on 12 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Subram Jade Gardens
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Subram Builders? Review the builder.
Reviews of Subram Builders by verified buyers
No verified reviews of Subram Builders yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Brigade LuminaBrigade Enterprises Ltd | 1.1 km | 416 | Dec 2030 | 11% | 0 | from ₹1.45 Cr |
| Pride AltiusPride Housing | 1.1 km | 152 | Jun 2026 | 100% | 0 | Not collected |
| Kumar PlatinaKumar Properties Private Limited | 1.2 km | 184 | Mar 2031 | 9% | 0 | Not collected |
| Sipani SamuhaSipani Developers Private Limited | 1.4 km | 237 | Dec 2029 | 38% | 0 | Not collected |
| Natures Lap By 5 Elements5 Elements Homes | 1.9 km | 365 | Dec 2029 | 69% | 0 | Not collected |
| Vruksha GreensVruksha Infra | 3.3 km | 80 | Jun 2027extended | 60% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 12 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/309/PR/210804/004238.
- RERA record last checked: 12 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 14 Jul 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Tumkur Road
Chikkabidarakallu, Tumkur RoadArtist’s impressionUnder constructionRERA registeredBuyers’ group openBrigade Lumina
by Brigade Enterprises
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 713 – 1,139 sq ft
- Dec 2030
416 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Brigade Lumina
Doddabidarikallu, Tumkur RoadReady to moveRERA registeredBuyers’ group openPride Altius
by Pride Housing
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 667 – 1,098 sq ft
- Jun 2026
152 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Pride Altius
Nagasandra, Tumkur RoadUnder constructionRERA registeredBuyers’ group openKumar Platina
by Kumar Properties
Price: Price on requestGet brochure & price →
- 2.5 BHK, 3 BHK
- 965 – 1,099 sq ft
- Mar 2031
184 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Kumar Platina