Sumuk Square

2 & 3 BHK apartments by Sumuk Projects · Jarakebhandekaval, near Doddaballapur Road, Bengaluru

Jarakebhandekaval, near Doddaballapur Road, BengaluruOpen on Google Maps (opens in a new tab)

  • Completion filed with RERA
  • RERA registered
  • residential

Ready homes still available: 25 of 75 homes were unsold when the builder filed completion with RERA (30 Sep 2026). Some may have sold since — join the group and we’ll ask the builder what is left and for a group price.

by Sumuk Projects

Price: Price on request

Get brochure, floor plans & price

Brochure, floor plans and price list for Sumuk Square

Builders share their brochure, floor plans and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Project summary

Sumuk Square is a residential project by Sumuk Projects in Jarakebhandekaval, Bengaluru with 75 homes, registered with Karnataka RERA. The completion date on RERA is 25 Aug 2026.

Facts collected on 4 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.

Sumuk Square buyers’ group: join to ask for a group price

No one has joined yet. Be one of the first 10 buyers in this group — the founding members.

Join free. When enough buyers have joined, our agent partner asks Sumuk Projects for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.

  1. Gathering buyers
  2. Talking to the builder
  3. Group offer
  4. Group site visit
  5. Booking

0 buyers have joined · 0 committed

Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.

Join the Sumuk Square buyers’ groupHow group buying works

See it for yourself

Visit the site with our team, or get a call to clear your questions. Free, no obligation.

Key facts: home types, towers, land and possession

Updated on 4 Oct 2026
Home types
2 BHK, 3 BHK
Carpet area
643 – 1,027 sq ft
Towers
1
Floors
5
Total homes
75
Land
0.78 acres
Possession (RERA)
Aug 2026
Built (RERA update)
100%

Sumuk Square RERA number and registration details

RERA number
PRM/KA/RERA/1251/472/PR/070323/005769
Registered on
7 Mar 2023
Promised completion
25 Aug 2026
Extended to
No extension recorded
RERA status
Completed
Homes booked
50 of 75 as on
Price
Not found in public records yet: price
Project type
Residential

Towers and blocks (RERA filing)

TowerFloorsBasementsHomes
A5175

A dash (—) means the filing did not state that value.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Summary in plain English

Sumuk Square is a residential project by Sumuk Projects in Jarakebhandekaval, Yelahanka, with 75 homes in a single 5-storey tower. The project is registered with Karnataka RERA and has a completion date of 25 August 2026.

Written by AI from the RERA record above on 5 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.

Open space, home loans, escrow and other details

Open space
55.1% of land
Water and power
Water source filed with RERA: BoreWell,BWSSB
Home loans: approved banks
Not found in public records yet: bank approvals
Payment plans
Not found in public records yet: payment plans
Maintenance
Not found in public records yet: maintenance
Car parking
Not found in public records yet: car parking charge
Escrow bank (RERA)
HDFC, RR NAGR
Building plan (RERA)
BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/ADDL.DIR/JDNORTH/0088/21-22 · dated 1 Dec 2022
Project cost declared to RERA
₹31.5 Cr

Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Amenities

  • Electricity
  • Indoor Sports facility
  • Water and Sanitation

Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sumuk Square location and address

Address
SY NO 55/5 JARAKEBHANDEKAVAL VILLAGE YELAHANKA HOBLI , YELAHANKA TALUK BANGALORE , Yelahanka , Bengaluru Urban, Karnataka - 560097
Village (RERA)
Jarakebhandekaval
Locality
Near Doddaballapur RoadAlso known as Doddaballapura Road, Doddaballapur Main Road
PIN code
560097
City
Bengaluru
State
Karnataka
Coordinates
13.10853, 77.53615

Distances to landmarks

Not found in public records yet: landmarks

About Jarakebhandekaval

Not found in public records yet: locality facts

Commute times to tech parks and the airport

As on 5 Oct 2026
ToStraight linePeak-hour drive (estimate)
Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab)11.28 kmapprox. 46 min
KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab)14.94 kmapprox. 61 min
Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab)20.91 kmapprox. 85 min
ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab)25.65 kmapprox. 104 min
Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab)25.87 kmapprox. 105 min
Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab)31.99 kmapprox. 130 min
How we calculate

Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.

Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.

Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this

Schools and hospitals nearby

As on 5 Oct 2026

Within 2 km

  • 9Schools and colleges8 schools, 1 colleges, 0 kindergartens
  • 0Hospitals and clinics0 hospitals, 0 clinics

Nearest schools and colleges

  • DR Academy · 0.91 km
  • Jnana Ganga Public School · 1.48 km
  • St. Philomena's School · 1.5 km

Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Nearest metro station and railway

As on 5 Oct 2026
  • Yelahanka (ಯಲಹಂಕ)Blue Line metro, under construction6.98 km
  • Jakkur Cross (ಜಕ್ಕೂರು ಅಡ್ಡ)Blue Line metro, under construction7.51 km
  • Dasarahalli (ದಾಸರಹಳ್ಳಿ)Open now — nearest operating metro station7.69 km
  • Chikka Banavara (ಚಿಕ್ಕ ಬಾಣವಾರ)Nearest railway station5.01 km

Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Lake and lake-buffer check

As on 5 Oct 2026

The nearest mapped lake is Byalakere Lake, 277 m from the project’s RERA map point.

The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.

The buffer rule

Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.

Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this

Satellite time-lapse of the site

Satellite photos load when you scroll to them.

Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.

Sources:Source (livingatlas.arcgis.com) (opens in a new tab)

Sumuk Square home types and carpet areas

Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.

Get brochure, floor plans & price

Brochure, floor plans and price list for Sumuk Square

Builders share their brochure, floor plans and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Home typeCarpet areaHomes
2 BHK643 – 787 sq ft30
3 BHK733 – 1,027 sq ft45

Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).

We have not collected floor-plan drawings; the builder’s sales team can share them.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sumuk Square possession date and construction status

  • Whole project (promoter’s RERA update)100%

    as on · 50 of 75 homes booked

Promoter’s quarterly update to RERA for Q1 2026-27, submitted 2026-07-15.

Units sold and unsold, from RERA (Q1 2026-27)

TypeHomesBookedAvailable
2 BHK30228
3 BHK452817

As reported by the promoter in the quarterly update to RERA, not verified by us.

Timeline

  1. 30 Jan 2023Project start date given to RERA
  2. 7 Mar 2023Registered with Karnataka RERA
  3. 25 Aug 2026Completion date given at registration
  4. 30 Sep 2026Promoter applied to RERA for completion

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Approvals and documents checklist

12 rows: approvals. Scroll inside the table to see them all.

ApprovalAuthoritySource
Building planBBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/ADDL.DIR/JDNORTH/0088/21-22 · dated 2022-12-01Source (rera.karnataka.gov.in) (opens in a new tab)
Land conversionDC OFFICE BANGALORE · No. ALN(NAY)SR 193/08-09 · dated 2009-02-10Source (rera.karnataka.gov.in) (opens in a new tab)
Commencement Certificatescan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Electricity Permission Letterscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Water Permission Letterscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Layout Planscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Building/Plotting Planscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Section Of Building/Infrastructure Plan of Plottingscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Conversion Certificate under section 95 of the KLR Act 1964scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
ESCOM/Electricityscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KWSSB/Waterscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KSPCBscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)

Documents uploaded to RERA

As on 4 Oct 2026
  • Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/ADDL.DIR/JDNORTH/0088/21-22 · dated 1 Dec 2022
  • Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Environment clearance · SEIAA KarnatakaNot on RERA yet
  • Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
  • Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Height clearance · Airports Authority of IndiaNot on RERA yet
  • Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet

From the documents the promoter uploaded to Karnataka RERA, collected 4 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sumuk Square RERA complaints

No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)

Court and consumer cases

Not found in public records yet: court cases

We list case numbers, courts and outcomes only — never names of private individuals.

About Sumuk Projects

Promoter type
Partnership Firm
Projects on this site
2
RERA complaints against promoter
0
Company number (CIN)
Not found in public records yet: CIN

From Karnataka RERA, as collected so far (4 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.

Sumuk Projects’s RERA record

Sumuk Projects delivery record

As on 20 Oct 2026
  • 2Projects in Bengaluru on RERA2 approved registrations under Sumuk Projects in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
  • 154Homes registeredAs stated in each registrations.
  • 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
  • 0Complaints per 1,000 homes0 complaints ÷ 154 homes in its 2 registrations on Karnataka RERA in Bengaluru.
  • 1Completion filed on RERARegistrations where the promoter applied to RERA for completion; 1 with an occupancy certificate on RERA.
  • 0 of 1Filed by the date given at registrationMedian gap 1.2 months (on-time ones count as 0). The completion application can come after handover, so this is an upper bound on lateness.

Completion filed on RERA

ProjectDate at registrationCompletion filedGap
Sumuk SquareOC on RERA25 Aug 202630 Sep 20261 months after

Measured against the completion date given at registration; many projects had RERA extensions (including the COVID-period extension), shown under the date.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

What’s changed since Dec 2022

As on 4 Oct 2026
  1. 30 Sep 2026Promoter applied to RERA for completion (occupancy certificate on RERA) Source (rera.karnataka.gov.in) (opens in a new tab)
  2. 15 Jul 2026Quarterly update filed for Q1 2026-27: 100% built, 50 of 75 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  3. 24 Jun 2026Quarterly update filed for Q4 2025-26: 100% built, 50 of 75 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  4. 20 Feb 2026Quarterly update filed for Q3 2025-26: 97% built, 50 of 75 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  5. 7 Mar 2023Registered with Karnataka RERA (PRM/KA/RERA/1251/472/PR/070323/005769); completion date 25 Aug 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
  6. 30 Jan 2023Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
  7. 1 Dec 2022Building plan approved by BBMP - Bruhat Bengaluru Mahanagara Palike (No. BBMP/ADDL.DIR/JDNORTH/0088/21-22) Source (rera.karnataka.gov.in) (opens in a new tab)

Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.

Home loan EMI calculator

No listed price found — enter one to try.

Example only — use your bank’s quote.

Monthly EMI
—
Down payment
—
Loan amount
—
Total interest
—

A calculation only, from the numbers you enter — not a loan offer.

All-in cost: GST, registration and other charges

The calculator loads when you scroll to it.

Assumptions
  • Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
  • GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
  • Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
  • Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
  • Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.

How we calculate this

Sumuk Square FAQs

What is Sumuk Square and where is it located?

Sumuk Square is a residential project by Sumuk Projects located in Jarakebhandekaval, Yelahanka taluk, Bengaluru Urban district, PIN code 560097.

How many homes are in Sumuk Square?

Sumuk Square has 75 homes in a single tower with a maximum of 5 floors.

What home types are available in Sumuk Square?

Sumuk Square offers 3 BHK homes (45 units, carpet area 733 to 1,027 sq ft) and 2 BHK homes (30 units, carpet area 643 to 787 sq ft).

When will Sumuk Square be completed?

The completion date on RERA is 25 August 2026, with an application filed for completion on 30 September 2026.

What is the RERA registration number for Sumuk Square?

The RERA registration number is PRM/KA/RERA/1251/472/PR/070323/005769, registered on 7 March 2023.

How many homes are booked in Sumuk Square?

As of Q1 2026-27 (quarter ended 30 June 2026), 50 homes are booked out of 75 homes.

What is the construction status of Sumuk Square?

The project is 100% complete as of Q1 2026-27, and an occupancy certificate has been uploaded.

Are there any RERA complaints against Sumuk Square?

No RERA complaints have been filed against this project.

Who is the builder of Sumuk Square and what is their RERA record?

Sumuk Projects is a Partnership Firm with no RERA complaints against them across all their projects and 2 projects on record in Bengaluru.

Which bank is the escrow for Sumuk Square?

HDFC is the escrow bank for this project.

Written by AI from the RERA record above on 5 Oct 2026. Answers use only that record; check them against the source before you decide.

Questions about Sumuk Square

No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.

Bought a home from Sumuk Projects? Review the builder.

Reviews of Sumuk Projects by verified buyers

No verified reviews of Sumuk Projects yet. If you bought a home from them, your review helps other buyers.

How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.

Similar projects within 5 km

ProjectDistanceHomesPossession (RERA)BuiltComplaintsPrice
NVG SeattleNVG Developers Private Limited1.4 km496Sep 2031—0Not collected
Concorde AntaresConcorde Housing Corporation Pvt Ltd1.6 km592Dec 202870%0Not collected
Shriram SolitaireShriprop Homes Private Limited2.2 km370May 2026extended100%2Not collected
Ajmera Lugaano - Ab WingAjmera Housing Corporation2.5 km600Sep 2026extended—3Not collected
Ajmera MarinaAjmera Housing Corporation Bangalore2.5 km330Dec 202835%1Not collected
Casagrand PromenadeCasa Grande Garden City Builders Pvt Ltd2.8 km223Aug 202910%0Not collected

Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sources and last checked dates

  1. Karnataka RERA — project register (search by the registration number) (opens in a new tab)

Collected on 4 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.

How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/472/PR/070323/005769.

  • RERA record last checked: 4 Oct 2026
  • Last change in the record (registration, quarterly filing or complaint): 15 Jul 2026

How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error

More new projects nearby

  • NVG Seattle: Site photo filed with Karnataka RERADoddabettahalli, near Vidyaranyapura–JalahalliUnder constructionRERA registeredBuyers’ group open

    NVG Seattle

    by NVG

    Price: Price on requestGet brochure & price →

    • 2 BHK, 3 BHK
    • 714 – 1,162 sq ft
    • Sep 2031

    496 homes

    Be one of the first 10 buyers in this groupFounding members — it’s free

    Join group for NVG Seattle
  • Concorde Antares: Site photo filed with Karnataka RERAChikkabettahalli, near Vidyaranyapura–JalahalliUnder constructionRERA registeredBuyers’ group open

    Concorde Antares

    by Concorde Housing Corporation

    Price: Price on requestGet brochure & price →

    • 1 BHK, 2 BHK, 3 BHK, 4 BHK
    • 459 – 1,696 sq ft
    • Dec 2028

    592 homes

    Be one of the first 10 buyers in this groupFounding members — it’s free

    Join group for Concorde Antares