Suraksha Springs
2 & 3 BHK apartments by Auk Suraksha Properties · Yelenahalli, Begur Road, Bengaluru
Yelenahalli, Begur Road, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Suraksha Springs at a glance
- Possession (RERA)Mar 2027Karnataka RERA
- Construction100% builtPromoter’s RERA update · as on 30 Jun 2026
- Homes booked114 of 180 (63%)RERA update · as on 30 Jun 2026
- RERA complaints (project)1 complaintKarnataka RERA · as on 21 Oct 2026
- Approvals filed8 of 9 on RERAKarnataka RERA uploads · 21 Oct 2026
- Nearest metroKalena Agrahara · 2.49 km (under construction)Open now: Singasandra, 3.87 km · straight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 157 min at peak38.88 km straight line · estimate
- Nearest lakeSubedharana Lake · 180 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Suraksha Springs is a residential project by Auk Suraksha Properties in Yelenahalli, Bengaluru with 180 homes, registered with Karnataka RERA. The completion date on RERA is 15 Mar 2027.
Facts collected on 21 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Suraksha Springs buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Auk Suraksha Properties for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Suraksha Springs buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 2 BHK, 2.5 BHK, 3 BHK
- Carpet area
- 686 – 955 sq ft
- Towers
- 1
- Floors
- 4
- Total homes
- 180
- Land
- 2.18 acres
- Possession (RERA)
- Mar 2027
- Built (RERA update)
- 100%
Suraksha Springs RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/310/PR/180424/006787
- Registered on
- 18 Apr 2024
- Promised completion
- 15 Mar 2027
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- 114 of 180 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| SURAKSHA SPRINGS | 4 | 1 | 180 |
A dash (—) means the filing did not state that value.
Summary in plain English
Suraksha Springs is a 180-home residential project by Auk Suraksha Properties in Yelenahalli, Bengaluru South. It has one tower with 4 floors and is registered as a new project launch. The project is scheduled for completion on 15 March 2027.
Written by AI from the RERA record above on 21 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 55.7% of land
- Water and power
- Water source filed with RERA: BoreWell,BWSSB
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- Axis Bank, 4TH BLOCK JAYANAGAR
- Building plan (RERA)
- BBMP - Bruhat Bengaluru Mahanagara Palike · No. 0035 · dated 12 Mar 2024
- Project cost declared to RERA
- ₹95.16 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- CCTV Surveillance
- Swimming Pool
- Parks
- Power Backup
- Water and Sanitation
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Suraksha Springs location and address
- Address
- Sy No36/8, 36/10 Yelenahalli Village, , Begur Hobli, Bangalore South Taluk, Bangalore , Bengaluru South , Bengaluru Urban, Karnataka - 560076
- Village (RERA)
- Yelenahalli
- Locality
- Begur RoadAlso known as Begur, Begur Main Road, Begur Koppa Road
- PIN code
- 560076
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.86220, 77.61464
Distances to landmarks
Not found in public records yet: landmarksAbout Begur Road
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 5.63 km | approx. 23 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 9.94 km | approx. 40 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 13.79 km | approx. 56 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 19.3 km | approx. 78 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 20.68 km | approx. 84 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 38.88 km | approx. 157 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 16Schools and colleges14 schools, 2 colleges, 0 kindergartens
- 4Hospitals and clinics1 hospitals, 3 clinics
Nearest schools and colleges
- St. Anthony's School · 0.37 km
- Chrysalis High School, Begur · 0.45 km
- Government Primary School Yelenahalli · 0.6 km
Nearest hospitals and clinics
- Mahima Clinic · 1.09 km
- Dr. Shankar's Ear Nose & Throat · 1.36 km
- Myo Medex - Ace Speciality Clinic · 1.6 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Kalena Agrahara (ಕಾಳೇನ ಅಗ್ರಹಾರ)Pink Line metro, under construction2.49 km
- Hulimavu (ಹುಳಿಮಾವು)Pink Line metro, under construction2.91 km
- Singasandra (ಸಿಂಗಸಂದ್ರ)Open now — nearest operating metro station3.87 km
- Huskuru (ಹುಸ್ಕೂರ್)Nearest railway station10.39 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Subedharana Lake, 180 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Subedharana Lake on OpenStreetMap (opens in a new tab) 180 m
- Yelenahalli Lake on OpenStreetMap (opens in a new tab) (ಎಲೆನಹಳ್ಳಿ ಕೆರೆ)408 m
- Chandrasekhar Layout Lake on OpenStreetMap (opens in a new tab) 647 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Suraksha Springs floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Brochure16 pages

BrochureFull PDF on RERA 






Approved building plan4 files

Approved Building/Plotting PlanFull PDF on RERA 
Area Development Plan Of Project AreaFull PDF on RERA 
BUILDING PLANFiled 3 Apr 2024 · Full PDF on RERA 
BUILDING PLANFiled 3 Apr 2024 · Full PDF on RERA
Approved layout plan2 files

Approved Layout PlanFull PDF on RERA 
Existing Layout PlanFull PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 2 BHK | 686 – 777 sq ft | 60 |
| 2.5 BHK | 866 – 916 sq ft | 70 |
| 3 BHK | 910 – 955 sq ft | 50 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Suraksha Springs possession date and construction status
Promoter’s quarterly update to RERA for Q1 2026-27, submitted 2026-07-14.
Units sold and unsold, from RERA (Q1 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 2 BHK | 60 | 37 | 23 |
| 2.5 BHK | 70 | 46 | 24 |
| 3 BHK | 50 | 31 | 19 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 14 Mar 2024Project start date given to RERA
- 18 Apr 2024Registered with Karnataka RERA
- 15 Mar 2027Completion date given at registration
Approvals and documents checklist
20 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Building plan | BBMP - Bruhat Bengaluru Mahanagara Palike · No. 0035 · dated 2024-03-12 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion | BBMP · No. ALN(SB)SR130/11-12 · dated 2012-05-05 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Change of Land Use | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| District Magistrate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approval/NOC under section 109 of KLR Act 1961 | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approval/NOC under section 14 of the KTCP Act | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| NOC in case of building proposals abutting to neighbouring properties | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BBMP - Bruhat Bengaluru Mahanagara Palike · No. 0035 · dated 12 Mar 2024
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 21 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Suraksha Springs RERA complaints and orders
1 complaint as on Source (rera.karnataka.gov.in) (opens in a new tab)
| Complaint ref | Filed | Subject | Status | Source |
|---|---|---|---|---|
| 00305/2026 | 26 Mar 2026 | Refund of Rupees 1058752 paid for Apartment Number 105 in Suraksha Springs project unlawful forfeiture by promoter | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Auk Suraksha Properties
- Promoter type
- Partnership Firm
- Projects on this site
- 1
- RERA complaints against promoter
- 1
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (21 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Auk Suraksha Properties’s RERA recordAuk Suraksha Properties delivery record
- 1Projects in Bengaluru on RERA1 approved registration under Auk Suraksha Properties in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 180Homes registeredAs stated in each registrations.
- 1RERA complaints0 open, 1 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 5.6Complaints per 1,000 homes1 complaints ÷ 180 homes in its 1 registration on Karnataka RERA in Bengaluru.
What the complaints are about
1 complaint subject as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Mar 2024
- 14 Jul 2026Quarterly update filed for Q1 2026-27: 100% built, 114 of 180 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Quarterly update filed for Q4 2025-26: 94% built, 114 of 180 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 26 Mar 2026Complaint 00305/2026 filed with RERA: “Refund of Rupees 1058752 paid for Apartment Number 105 in Suraksha Springs project unlawful forfeiture by promoter” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jan 2026Quarterly update filed for Q3 2025-26: 91% built, 114 of 180 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 18 Apr 2024Registered with Karnataka RERA (PRM/KA/RERA/1251/310/PR/180424/006787); completion date 15 Mar 2027 Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Mar 2024Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 12 Mar 2024Building plan approved by BBMP - Bruhat Bengaluru Mahanagara Palike (No. 0035) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Suraksha Springs FAQs
What is the RERA registration number for Suraksha Springs?
The registration number is PRM/KA/RERA/1251/310/PR/180424/006787, registered on 18 April 2024.
When will Suraksha Springs be completed?
The completion date on RERA is 15 March 2027.
How many homes are in Suraksha Springs and what types are available?
The project has 180 homes: 60 two-bedroom, 70 two-and-a-half-bedroom, and 50 three-bedroom units.
What are the carpet area ranges for each home type in Suraksha Springs?
2 BHK units range from 686 to 777 sq ft, 2.5 BHK units from 866 to 916 sq ft, and 3 BHK units from 910 to 955 sq ft.
What is the construction progress of Suraksha Springs as per the latest update?
As of Q1 2026-27 (ending 30 June 2026), construction is 100% complete.
How many homes have been booked in Suraksha Springs?
As of Q1 2026-27, 114 homes have been booked out of 180.
Where is Suraksha Springs located?
The project is in Yelenahalli, Bengaluru South taluk, Bengaluru Urban district, PIN 560076.
How many RERA complaints have been filed on Suraksha Springs?
There is 1 RERA complaint on this registration.
What is the escrow bank for Suraksha Springs?
The escrow bank is Axis Bank.
How many other projects does the builder have on record?
Auk Suraksha Properties has 1 project in the Bengaluru RERA records and 1 complaint against the builder across all projects.
Written by AI from the RERA record above on 21 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Suraksha Springs
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Auk Suraksha Properties? Review the builder.
Reviews of Auk Suraksha Properties by verified buyers
No verified reviews of Auk Suraksha Properties yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Aditya RaagaAditya Constructions | 0.4 km | 145 | Mar 2029 | 28% | 0 | Not collected |
| SNN Raj SerenitySNN Builders Private Limited | 0.5 km | 594 | Oct 2027 | 98% | 3 | Not collected |
| Casagrand AmorCasa Grande Garden City Builders Pvt Ltd | 0.7 km | 480 | Feb 2028 | 50% | 1 | Not collected |
| CityVille ValmarkValmark Developers Private Limited | 1.1 km | 367 | Sep 2031 | — | 0 | Not collected |
| AzurLodha Developers Limited | 1.3 km | 558 | Dec 2030 | — | 1 | from ₹2.37 Crabout ₹23,000/sq ft carpet |
| Windsor VerdantFischer Homes LLP | 1.4 km | 48 | Dec 2031 | — | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 21 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/310/PR/180424/006787.
- RERA record last checked: 21 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 14 Jul 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Begur Road
Yelenahalli, Begur RoadUnder constructionRERA registeredBuyers’ group openAditya Raaga
by Aditya Constructions
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 804 – 1,099 sq ft
- Mar 2029
145 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Aditya Raaga
Yelenahalli, Begur RoadUnder constructionRERA registeredBuyers’ group openSNN Raj Serenity
by SNN Builders
Price: Price on requestGet brochure & price →
- 1 BHK, 2 BHK, 2.5 BHK, 3 BHK, +2 more
- 484 – 1,485 sq ft
- Oct 2027
594 homes · 3 RERA complaints
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for SNN Raj Serenity
Chandrashekarapura, Begur RoadUnder constructionRERA registeredBuyers’ group openCasagrand Amor
by Casa Grande Garden City Builders
Price: Price on requestGet brochure & price →
- 1 BHK, 2 BHK, 3 BHK
- 337 – 1,338 sq ft
- Feb 2028
480 homes · 1 RERA complaint
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Casagrand Amor