Skip to content
Log in

The Prime Nest

20×30, 30×40 plots by Shivraj P · Agara, HSR Layout, Bengaluru

Agara, HSR Layout, BengaluruOpen on Google Maps (opens in a new tab)

  • Under construction
  • RERA registered
  • plotted

by Shivraj P

Price: Price on request

Get brochure, layout plan & price

Brochure, layout plan and price list for The Prime Nest

Developers share their brochure, layout plan and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the developer pays us a commission. How we earn

Project summary

The Prime Nest is a plotted development by Shivraj P in Agara, Bengaluru with 81 plots, registered with Karnataka RERA. The completion date on RERA is 19 Feb 2027.

Facts collected on 16 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the developer pays us a commission.

The Prime Nest buyers’ group: join to ask for a group price

No one has joined yet. Be one of the first 10 buyers in this group — the founding members.

Join free. When enough buyers have joined, our agent partner asks Shivraj P for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the developer offers and book directly with the developer if you want to. Free for buyers. If you book through us, the developer pays us a commission.

  1. Gathering buyers
  2. Talking to the developer
  3. Group offer
  4. Group site visit
  5. Booking

0 buyers have joined · 0 committed

Committed buyers have confirmed their budget, plot size and timeline with us on a call; developers negotiate with them. Joining is free and never obliges you to buy.

Join the The Prime Nest buyers’ groupHow group buying works

See it for yourself

Visit the site with our team, or get a call to clear your questions. Free, no obligation.

Key facts: plot sizes, approval, land and completion

Updated on 16 Oct 2026
Plot sizes (feet)
20×30, 30×40
Plot area
600 – 2,296 sq ft
Total plots
81
Layout approved by
BDA
Land
Not found in public records yet: land area
Land conversion orders
2
Completion (RERA)
Feb 2027
Development (RERA update)
80%

Plot sizes (RERA filing)

Size (feet)AreaPlots
20×30600 sq ft9
30×401,200 sq ft61
Odd-sized (irregular)varies11

Sizes as filed with RERA, converted from metres to feet (9.14 m = 30 ft, 12.19 m = 40 ft). Ask the developer which plots are still unsold.

Approving authority as filed: BDA - Bangalore Development Authority.

Land conversion orders (RERA filing)

Survey no.Converted forOrderBy
20/3ResidentialNo. 415782, 28 Dec 2022Deputy Commissioner Bengaluru Urban
20/4ResidentialNo. 415779, 28 Dec 2022Deputy Commissioner Bengaluru Urban

RERA does not cover each plot’s khata. Ask the developer for the khata and title documents and have a lawyer check them before paying an advance.

The Prime Nest RERA number and registration details

RERA number
PRM/KA/RERA/1251/310/PR/161224/007299
Registered on
16 Dec 2024
Promised completion
19 Feb 2027
Extended to
No extension recorded
RERA status
New launch
Plots booked
Not found in public records yet: plots booked
Price
Not found in public records yet: price
Project type
Plotted

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Summary in plain English

The project is a plotted residential development by Shivraj P in Agara, Bengaluru South, with 81 plots registered with RERA. It includes residential plots in multiple sizes along with public utility spaces, roads, and parks. Completion is scheduled for 19 February 2027.

Written by AI from the RERA record above on 5 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.

Open space, loans, escrow and other details

Open space
Not found in public records yet: open space
Water and power
Water source filed with RERA: Local Authority
Plot loans: approved banks
Not found in public records yet: bank approvals
Payment plans
Not found in public records yet: payment plans
Maintenance
Not found in public records yet: maintenance
Car parking
Not found in public records yet: car parking charge
Escrow bank (RERA)
STATE BANK OF INDIA, Mysuru Bank Circle Avenue Road Bengaluru
Building plan (RERA)
BDA - Bangalore Development Authority · No. PRL-52/2023-24/1107/2024-25 · dated 20 Aug 2024
Project cost declared to RERA
₹38.32 Cr

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Amenities

Not found in public records yet: amenities

The Prime Nest location and address

Address
SY NO. 20/3 & 20/4OF , AGARA VILLAGE , Bengaluru South , Bengaluru Urban, Karnataka - 560082
Village (RERA)
Agara
Locality
HSR LayoutAlso known as HSR
PIN code
560082
City
Bengaluru
State
Karnataka
Coordinates
12.83626, 77.49056

Distances to landmarks

Not found in public records yet: landmarks

About HSR Layout

Not found in public records yet: locality facts

Commute times to tech parks and the airport

As on 5 Oct 2026
ToStraight linePeak-hour drive (estimate)
KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab)17.95 kmapprox. 73 min
Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab)18.97 kmapprox. 77 min
Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab)22.84 kmapprox. 93 min
Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab)27.41 kmapprox. 111 min
ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab)31.64 kmapprox. 128 min
Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab)46.68 kmapprox. 189 min
How we calculate

Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.

Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.

Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this

Schools and hospitals nearby

As on 5 Oct 2026

Within 2 km

  • 2Schools and colleges2 schools, 0 colleges, 0 kindergartens
  • 0Hospitals and clinics0 hospitals, 0 clinics

Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Nearest metro station and railway

As on 5 Oct 2026
  • Silk Institute (ರೇಷ್ಮೆ ಸಂಸ್ಥೆ)Open now — nearest operating metro station5.12 km
  • Hejjala (ಹೆಜ್ಜಾಲ)Nearest railway station7.95 km

Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Lake and lake-buffer check

As on 5 Oct 2026

The nearest mapped lake is Agara Lake, 1,240 m from the project’s RERA map point.

The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.

The buffer rule

Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.

Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this

Satellite time-lapse of the site

Satellite photos load when you scroll to them.

Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.

Sources:Source (livingatlas.arcgis.com) (opens in a new tab)

The Prime Nest layout plan and plot types as filed

Documents the developer uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.

Brochure

Approved layout plan3 files

Plot type (as filed)AreaPlots
6.10m * 9.14m—9
9.14 m *12.19m (ews)—61
Odd—11
Parks—3
Public utility—1
Road—5

Plot types and counts as filed with Karnataka RERA.

We have not collected the layout plan drawing; the developer’s sales team can share it.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

The Prime Nest completion date and development status

  • Whole project (promoter’s RERA update)80%

    as on

Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.

Timeline

  1. 20 Sep 2024Project start date given to RERA
  2. 16 Dec 2024Registered with Karnataka RERA
  3. 19 Feb 2027Completion date given at registration

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Construction pace from RERA quarterly filings

As on 15 Oct 2026

At the average pace so far, construction would reach 100% around Apr 2027 — about 1 month after the completion date on RERA (19 Feb 2027).

At the pace between the 4 quarterly filings we have (16% → 80% in 9 months), it would be around Dec 2026 — about 2 months before the RERA date.

0%25%50%75%100%202520262027RERA date16%65%70%80%
  • Filed on RERA
  • Average pace since start
  • Pace between filings (and 0% assumed at the start date)
  • RERA completion date

Quarterly filings

QuarterFiled onDevelopedPlots booked
Q2 2026-27to 30 Sep 202615 Oct 202680%—
Q1 2026-27to 30 Jun 202614 Jul 202670%—
Q4 2025-26to 31 Mar 202630 Jun 202665%—
Q3 2025-26to 31 Dec 202512 Feb 202616%—
How we calculate

Average pace = % built ÷ months since the start date in the RERA record. Here: 80% ÷ 24.3 months (20 Sep 2024 to 30 Sep 2026) = 3.3% a month.

Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 20 ÷ 3.3 = 6.1 months → Apr 2027. This is an estimate, not a date from the builder or RERA.

Pace between filings = (80% − 16%) ÷ 9 months = 7.1% a month.

A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

Approvals and documents checklist

ApprovalAuthoritySource
Layout planBDA - Bangalore Development Authority · No. PRL-52/2023-24/1107/2024-25 · dated 2024-08-20Source (rera.karnataka.gov.in) (opens in a new tab)
Land conversion (2 orders)Deputy Commissioner Bengaluru Urban · No. 415782 and 1 more · dated 2022-12-28Source (rera.karnataka.gov.in) (opens in a new tab)
Commencement Certificatescan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Electricity Permission Letterscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Water Permission Letterscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Layout Planscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Change of Land Usescan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Conversion Certificate under section 95 of the KLR Act 1964scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
ESCOM/Electricityscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KWSSB/Waterscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)

Documents uploaded to RERA

As on 16 Oct 2026
  • Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BDA - Bangalore Development Authority · No. PRL-52/2023-24/1107/2024-25 · dated 20 Aug 2024
  • Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Environment clearance · SEIAA KarnatakaNot on RERA yet
  • Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
  • Pollution board consent · KSPCBNot on RERA yet
  • Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Height clearance · Airports Authority of IndiaNot on RERA yet
  • Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion

From the documents the promoter uploaded to Karnataka RERA, collected 16 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

The Prime Nest RERA complaints

No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)

Court and consumer cases

Not found in public records yet: court cases

We list case numbers, courts and outcomes only — never names of private individuals.

About Shivraj P

Promoter type
Proprietorship
Projects on this site
1
RERA complaints against promoter
0
Company number (CIN)
Not found in public records yet: CIN

From Karnataka RERA, as collected so far (16 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.

Shivraj P’s RERA record

Shivraj P delivery record

As on 16 Oct 2026

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

What’s changed since Aug 2024

As on 16 Oct 2026
  1. 15 Oct 2026Quarterly update filed for Q2 2026-27: 80% built Source (rera.karnataka.gov.in) (opens in a new tab)
  2. 14 Jul 2026Quarterly update filed for Q1 2026-27: 70% built Source (rera.karnataka.gov.in) (opens in a new tab)
  3. 30 Jun 2026Quarterly update filed for Q4 2025-26: 65% built Source (rera.karnataka.gov.in) (opens in a new tab)
  4. 12 Feb 2026Quarterly update filed for Q3 2025-26: 16% built Source (rera.karnataka.gov.in) (opens in a new tab)
  5. 16 Dec 2024Registered with Karnataka RERA (PRM/KA/RERA/1251/310/PR/161224/007299); completion date 19 Feb 2027 Source (rera.karnataka.gov.in) (opens in a new tab)
  6. 20 Sep 2024Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
  7. 20 Aug 2024Building plan approved by BDA - Bangalore Development Authority (No. PRL-52/2023-24/1107/2024-25) Source (rera.karnataka.gov.in) (opens in a new tab)

Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.

Plot loan EMI calculator

No listed price found — enter one to try.

Example only — use your bank’s quote.

Monthly EMI
—
Down payment
—
Loan amount
—
Total interest
—

A calculation only, from the numbers you enter — not a loan offer.

The Prime Nest FAQs

What type of project is this?

This is a plotted residential project with 81 plots registered with RERA.

When will the project be completed?

The completion date is 19 February 2027 as per the RERA record.

How many plots are in the project?

The project has 81 plots in total, including residential plots, public utility spaces, roads, and parks.

What plot types and sizes are available?

The project offers 11 ODD plots, 61 plots of 9.14 M × 12.19 M (EWS), 9 plots of 6.10 M × 9.14 M, 1 public utility space, 5 road areas, and 3 parks.

What is the current construction progress?

As of Q1 2026-27 (quarter ended 30 June 2026), the project is 70% complete.

What is the RERA registration number?

The project is registered under RERA registration number PRM/KA/RERA/1251/310/PR/161224/007299, registered on 16 December 2024.

Are there any RERA complaints on this project?

There are no RERA complaints on this project.

Where is the project located?

The project is in Agara, Bengaluru South taluk, Bengaluru Urban district, PIN code 560082.

Who is the developer?

The project is built by Shivraj P, a proprietorship entity.

Which bank holds the escrow?

State Bank of India holds the escrow for this project.

Written by AI from the RERA record above on 5 Oct 2026. Answers use only that record; check them against the source before you decide.

Questions about The Prime Nest

No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.

Bought a plot from Shivraj P? Review the developer.

Reviews of Shivraj P by verified buyers

No verified reviews of Shivraj P yet. If you bought a plot from them, your review helps other buyers.

How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the developer may reply.

Similar projects within 5 km

ProjectDistancePlotsCompletion (RERA)DevelopedComplaintsPrice
Elegant Mystic EliteElegant Builders And Developers0.5 km79Dec 202774%0Not collected
SRI SRI TAPOVAN 2, Block 1Maxconcorde Developers1.9 km108Mar 2023—0Not collected
Cinnamon CitadelRroyal Indraprastha Cinnamon Citadel LLP2.8 km49May 2027—0Not collected
Paradise On EarthUrbanrise Classic Homes Private Limited3.1 km220Jan 2026—0Not collected
RSD Royals-1Vinay.R3.9 km83Mar 2027—0Not collected
Amidst NatureClimate Connections4.7 km59Jul 2027extended97%0Not collected

Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the developer’s own website where we found one.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sources and last checked dates

  1. Karnataka RERA — project register (search by the registration number) (opens in a new tab)

Collected on 16 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.

How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/310/PR/161224/007299.

  • RERA record last checked: 16 Oct 2026
  • Last change in the record (registration, quarterly filing or complaint): 16 Oct 2026

How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the developer’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error

More new projects in HSR Layout