Thirumala lakshmi vaibav
3 BHK apartments by Sri Chowdeshwari Projects · Seegehalli, KR Puram, Bengaluru
Seegehalli, KR Puram, Bengaluru
- Under construction
- RERA registered
- residential
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Thirumala lakshmi vaibav at a glance
- Possession (RERA)Dec 2026 ExtendedWas Nov 2019 · Karnataka RERA
- Construction99% built · on pace for Nov 2026RERA filing to 30 Sep 2026; estimate from average pace
- Homes booked107 of 205 (52%)RERA update · as on 30 Sep 2026
- RERA complaints (project)6 complaintsKarnataka RERA · as on 14 Oct 2026
- Approvals filed1 of 9 on RERAKarnataka RERA uploads · 14 Oct 2026
Project summary
Thirumala lakshmi vaibav is a residential project by Sri Chowdeshwari Projects in Seegehalli, Bengaluru with 205 homes, registered with Karnataka RERA. The completion date on RERA is 31 Dec 2026.
Not in the RERA record we collected yet: map location. This page fills in as the record is collected.
Facts collected on 14 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Thirumala lakshmi vaibav buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Sri Chowdeshwari Projects for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Thirumala lakshmi vaibav buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 3 BHK
- Carpet area
- 1,386 – 1,761 sq ft
- Towers
- 4
- Floors
- 4
- Total homes
- 205
- Land
- 3.1 acres
- Possession (extended)
- Dec 2026
- Built (RERA update)
- 99%
Thirumala lakshmi vaibav RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/446/PR/180420/001496
- Registered on
- 20 Apr 2018
- Promised completion
- 29 Nov 2019
- Extended to
- 31 Dec 2026
- RERA status
- Under construction
- Homes booked
- 107 of 205 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| Narayanadri | 4 | 1 | 40 |
| Vishabadri | 4 | 1 | 40 |
| Garudadri | 4 | 1 | 80 |
| Anjanadri | 4 | 1 | 45 |
A dash (—) means the filing did not state that value.
Summary in plain English
Thirumala Lakshmi Vaibav is a residential project by Sri Chowdeshwari Projects in Seegehalli, Bengaluru East, with 205 three-bedroom homes across 4 towers. The project was originally scheduled to complete on 29 November 2019 but is now registered with a completion date of 31 December 2026.
Written by AI from the RERA record above on 14 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 52.5% of land
- Water and power
- Not found in public records yet: water and power
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- HDFC, hulimavu
- Project cost declared to RERA
- ₹107 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
Thirumala lakshmi vaibav location and address
- Address
- Sy No. 25/1 and 26/1 of Seegehalli Village, Bidarahalli Hobli , Bangalore East Taluk
- Village (RERA)
- Seegehalli
- Locality
- KR PuramAlso known as Krishnarajapuram, K R Puram
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- Not found in public records yet: coordinates
Distances to landmarks
Not found in public records yet: landmarksAbout KR Puram
Not found in public records yet: locality factsThirumala lakshmi vaibav home types and carpet areas
Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.
Get brochure, floor plans & price| Home type | Carpet area | Homes |
|---|---|---|
| 3 BHK | 1,386 – 1,761 sq ft | 205 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Thirumala lakshmi vaibav possession date and construction status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-13.
By tower (Q2 2026-27)
Units sold and unsold, from RERA (Q2 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 3 BHK | 205 | 107 | 98 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 24 Oct 2014Project start date given to RERA
- 20 Apr 2018Registered with Karnataka RERA
- 29 Nov 2019Completion date given at registration
- 29 Nov 2020Section 6 Extension: completion date moved to this date
- 31 Dec 2026Further Extension: completion date moved to this date
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Nov 2026 — about 2 months before the completion date on RERA (31 Dec 2026).
At the pace between the 4 quarterly filings we have (89% → 99% in 9 months), it would be around Oct 2026 — about 2 months before the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 13 Oct 2026 | 99% | 107 of 205 |
| Q1 2026-27to 30 Jun 2026 | 9 Jul 2026 | 98% | 107 of 205 |
| Q4 2025-26to 31 Mar 2026 | 10 Apr 2026 | 92% | 100 of 205 |
| Q3 2025-26to 31 Dec 2025 | 18 Jan 2026 | 89% | 97 of 205 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 99% ÷ 143.2 months (24 Oct 2014 to 30 Sep 2026) = 0.7% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 1 ÷ 0.7 = 1.4 months → Nov 2026. This is an estimate, not a date from the builder or RERA.
Pace between filings = (99% − 89%) ÷ 9 months = 1.1% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-13.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Building plan | BDA - Bangalore Development Authority | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Commencement certificate · Permission to start buildingNot on RERA yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBNot on RERA yet
- Water and sewerage · BWSSBNot on RERA yet
- Electricity · BESCOMNot on RERA yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 14 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Thirumala lakshmi vaibav RERA complaints and orders
6 complaints as on Source (rera.karnataka.gov.in) (opens in a new tab)
| Complaint ref | Filed | Subject | Status | Source |
|---|---|---|---|---|
| 01529/2025 | 26 Dec 2025 | Refund of the amount paid to developer and amount paid to bank towards emi | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00032/2023 | 9 Jan 2023 | Seeking Refund of amount paid to the builder with interest and compensation on the account of non-completion of project and failure to deliver possession within the specified time as per agreement | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220310/0009103 | 10 Mar 2022 | Refund of amount and Compensation due to pending Construction, non-delivery and breach of agreement | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/190904/0004120 | 4 Sep 2019 | Refund of earnest money of Rs. 26,51,975/-remitted for Flat No. 402, in Block -1 (Garudadri Block), with interest 18% PA and delay compensation Rs. 3,04,920/- with interest 18% PA & cost of litigation | Disposed ao | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/190829/0004068 | 29 Aug 2019 | Refund of amounts paid with interest&Compensation | Disposed ao | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/190808/0002190 | 8 Aug 2019 | Refund for stoppage of work along with interest and compensation | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Sri Chowdeshwari Projects
- Promoter type
- Partnership Firm
- Projects on this site
- 1
- RERA complaints against promoter
- 6
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (14 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Sri Chowdeshwari Projects’s RERA recordSri Chowdeshwari Projects delivery record
- 1Projects in Bengaluru on RERA1 approved registration under Sri Chowdeshwari Projects in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 205Homes registeredAs stated in each registrations.
- 6RERA complaints0 open, 6 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 29.3Complaints per 1,000 homes6 complaints ÷ 205 homes in its 1 registration on Karnataka RERA in Bengaluru.
What the complaints are about
6 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Oct 2014
- 31 Dec 2026Completion date extended to 31 Dec 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
- 13 Oct 2026Quarterly update filed for Q2 2026-27: 99% built, 107 of 205 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 9 Jul 2026Quarterly update filed for Q1 2026-27: 98% built, 107 of 205 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 10 Apr 2026Quarterly update filed for Q4 2025-26: 92% built, 100 of 205 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 18 Jan 2026Quarterly update filed for Q3 2025-26: 89% built, 97 of 205 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 26 Dec 2025Complaint 01529/2025 filed with RERA: “Refund of the amount paid to developer and amount paid to bank towards emi” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 9 Jan 2023Complaint 00032/2023 filed with RERA: “Seeking Refund of amount paid to the builder with interest and compensation on the account of non-completion of project and failure to deliver possession within the specified time as per agreement” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 10 Mar 2022Complaint CMP/220310/0009103 filed with RERA: “Refund of amount and Compensation due to pending Construction, non-delivery and breach of agreement” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 4 Sep 2019Complaint CMP/190904/0004120 filed with RERA: “Refund of earnest money of Rs. 26,51,975/-remitted for Flat No. 402, in Block -1 (Garudadri Block), with interest 18% PA and delay compensation Rs. 3,04,920/- with interest 18% PA & cost of litigation” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 29 Aug 2019Complaint CMP/190829/0004068 filed with RERA: “Refund of amounts paid with interest&Compensation” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 8 Aug 2019Complaint CMP/190808/0002190 filed with RERA: “Refund for stoppage of work along with interest and compensation” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 20 Apr 2018Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/180420/001496); completion date 29 Nov 2019 Source (rera.karnataka.gov.in) (opens in a new tab)
- 24 Oct 2014Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Thirumala lakshmi vaibav FAQs
What is the RERA registration number for Thirumala Lakshmi Vaibav?
The project is registered under RERA registration number PRM/KA/RERA/1251/446/PR/180420/001496.
How many homes are in Thirumala Lakshmi Vaibav?
The project has 205 homes, all 3 BHK units.
What is the carpet area of homes in Thirumala Lakshmi Vaibav?
The 3 BHK homes have carpet areas ranging from 1,386 to 1,761 sq ft.
When is Thirumala Lakshmi Vaibav expected to be completed?
The current completion date registered on RERA is 31 December 2026.
What is the construction progress of Thirumala Lakshmi Vaibav as of the latest update?
As of Q2 2026-27 (quarter ended 30 September 2026), the project is 99% complete.
How many homes are booked in Thirumala Lakshmi Vaibav?
As of Q2 2026-27, 107 homes are booked out of 205 homes.
Where is Thirumala Lakshmi Vaibav located?
The project is located in Seegehalli, Bengaluru East taluk, Bengaluru Urban district.
How many RERA complaints have been filed against Thirumala Lakshmi Vaibav?
There are 6 RERA complaints on this project.
What extensions have been granted for Thirumala Lakshmi Vaibav?
The project was granted a Section 6 Extension with completion date 29 November 2020, and a Further Extension with completion date 31 December 2026.
How many other projects does Sri Chowdeshwari Projects have in the Bengaluru RERA records?
Sri Chowdeshwari Projects has 1 project in the Bengaluru RERA records, which is Thirumala Lakshmi Vaibav.
Written by AI from the RERA record above on 14 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Thirumala lakshmi vaibav
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Sri Chowdeshwari Projects? Review the builder.
Reviews of Sri Chowdeshwari Projects by verified buyers
No verified reviews of Sri Chowdeshwari Projects yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Sources and last checked dates
Collected on 14 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/446/PR/180420/001496.
- RERA record last checked: 14 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 14 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in KR Puram
Seegehalli, Kadugodi–Hope FarmReady to moveRERA registeredBuyers’ group openJeevans Octave
by Jeevan
Price: Price on requestGet brochure & price →
- 2 BHK, 2.5 BHK, 3 BHK
- 744 – 1,067 sq ft
- Jun 2026 (extended)
274 homes · 3 RERA complaints
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Jeevans Octave
Seegehalli, near Kadugodi–Hope FarmUnder constructionRERA registeredBuyers’ group openGreen Edge Casero
by Green Edge
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 774 – 1,097 sq ft
- Dec 2026
117 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Green Edge Casero
Bhattarahalli, KR PuramUnder constructionRERA registeredBuyers’ group openCasagrand Meridian
by Casa Grande Garden City Builders
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 866 – 1,335 sq ft
- Nov 2026 (extended)
215 homes · 13 RERA complaints
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Casagrand Meridian