Upkar Habitat at a glance
- Completion (RERA)Dec 2029Karnataka RERA
- Construction98% built · on pace for Oct 2026RERA filing to 30 Sep 2026 (Phase 3); estimate from average pace
- RERA complaints (project)None listedKarnataka RERA · as on 16 Oct 2026
- Approvals filed2 of 9 on RERAKarnataka RERA uploads · 16 Oct 2026
- Nearest metroDelta Electronics Bommasandra · 13.35 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 208 min at peak51.42 km straight line · estimate
- Nearest lakeUnnamed lake · 1,651 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Upkar Habitat is a plotted development by Upkar Developers in Balluru, Bengaluru with 644 plots, registered with Karnataka RERA. The completion date on RERA is 30 Dec 2029. It is registered in 3 phases.
Facts collected on 16 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the developer pays us a commission.
Upkar Habitat buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Upkar Developers for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the developer offers and book directly with the developer if you want to. Free for buyers. If you book through us, the developer pays us a commission.
- Gathering buyers
- Talking to the developer
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, plot size and timeline with us on a call; developers negotiate with them. Joining is free and never obliges you to buy.
Join the Upkar Habitat buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: plot sizes, approval, land and completion
- Plot sizes (feet)
- 30×40, 30×50
- Plot area
- 607 – 25,833 sq ft
- Total plots
- 644
- Layout approved by
- BMRDA
- Land
- Not found in public records yet: land area
- Land conversion orders
- 5
- Completion (RERA)
- Dec 2029
- Development (RERA update)
- Not found in public records yet: development progress
Plot sizes (RERA filing)
| Size (feet) | Area | Plots |
|---|---|---|
| 30×40 | 1,200 sq ft | 53 |
| 30×50 | 1,500 sq ft | 23 |
| Odd-sized (irregular) | varies | 61 |
Sizes as filed with RERA, converted from metres to feet (9.14 m = 30 ft, 12.19 m = 40 ft). Ask the developer which plots are still unsold.
Approving authority as filed: BMRDA - Bangalore Metropolitan Region Development Authority.
Land conversion orders (RERA filing)
| Phase | Survey no. | Converted for | Order | By |
|---|---|---|---|---|
| Phase 3 | 75/1 | Residential | No. 511276, 4 Aug 2023 | DC- BANGALORE |
| Phase 3 | 75/2 | Residential | No. 511277, 4 Aug 2023 | DC- BANGALORE |
| Phase 3 | 76 | Residential | No. 511274, 4 Aug 2023 | DC- BANGALORE |
| Phase 3 | 77 | Residential | No. 511275, 4 Aug 2023 | DC - Basavangudi Attibele |
| Phase 3 | 78 | Residential | No. 271891, 29 Jan 2022 | DC |
RERA does not cover each plot’s khata. Ask the developer for the khata and title documents and have a lawyer check them before paying an advance.
Upkar Habitat RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/308/PR/171205/001374
- Registered on
- 5 Dec 2017
- Promised completion
- 30 Dec 2029
- Extended to
- No extension recorded
- RERA status
- New launch
- Plots booked
- Not found in public records yet: plots booked
- Price
- Not found in public records yet: price
- Project type
- Plotted
3 RERA registrations (one per phase) are shown together on this page; dates above are the latest across phases.
Phases and RERA numbers
| Phase | RERA number | Promised completion | Plots | Status | Source |
|---|---|---|---|---|---|
| Main registration | PRM/KA/RERA/1251/308/PR/171205/001374 | 31 Jul 2018 | 419 | Completed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Phase 2 | PRM/KA/RERA/1251/308/PR/200722/003485 | 31 Mar 2021 | 88 | Completed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Phase 3 | PRM/KA/RERA/1251/308/PR/201224/007308 | 30 Dec 2029 | 137 | New launch | Source (rera.karnataka.gov.in) (opens in a new tab) |
Summary in plain English
Upkar Habitat is a plotted layout by Upkar Developers in Balluru, Anekal taluk, Bengaluru Urban. The project has 644 plots across three phases, with Phase 3 (the latest) registered with RERA on 20 December 2024 and due for completion on 30 December 2029.
Written by AI from the RERA record above on 17 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, loans, escrow and other details
- Open space
- Not found in public records yet: open space
- Water and power
- Water source filed with RERA: Local Authority
- Plot loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA) · Main registration
- STATE BANK OF MYSORE, Jayanagar
- Escrow bank (RERA) · Phase 2
- HDFC, Jayanagar 3rd Block
- Escrow bank (RERA) · Phase 3
- HDFC, JAYANAGAR
Amenities
Upkar Habitat location and address
- Address
- Balluru Village, Athibele Hobli, Anekal Taluk
- Village (RERA)
- Balluru
- Locality
- Near Sarjapur–Attibele RoadAlso known as Sarjapura Attibele Road, Attibele Sarjapur Road
- PIN code
- 560092
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.74500, 77.78500
Distances to landmarks
Not found in public records yet: landmarksAbout Balluru
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 17.46 km | approx. 71 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 22.84 km | approx. 92 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 27.46 km | approx. 111 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 34.9 km | approx. 141 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 38.16 km | approx. 155 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 51.42 km | approx. 208 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 0Schools and colleges0 schools, 0 colleges, 0 kindergartens
- 1Hospitals and clinics1 hospitals, 0 clinics
Nearest hospitals and clinics
- Government Hospital, Ballur · 0.74 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Delta Electronics Bommasandra (ಡೆಲ್ಟಾ ಎಲೆಕ್ಟ್ರಾನಿಕ್ಸ್ ಬೊಮ್ಮಸಂದ್ರ)Open now — nearest operating metro station13.35 km
- Maranayakanahalli Nearest railway station3.72 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 1,651 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,651 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,809 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Upkar Habitat layout plan and plot types as filed
Documents the developer uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Approved building plan

Phase 3: Approved Building/Plotting PlanFull PDF on RERA
Approved layout plan

Phase 3: Approved Layout PlanFull PDF on RERA
Layout plan and brochure not published? The developer shares them only on request. We’ll get the brochure, layout plan and current price list for you, free.
Get brochure, layout plan & price| Plot type (as filed) | Area | Plots |
|---|---|---|
| Odd-shaped plots | — | 61 |
| Plot- 9 x 12 - sites | — | 53 |
| Plot- 9 x 15- sites | — | 23 |
| Plots | — | 88 |
| Plotted development | — | 419 |
Plot types and counts as filed with Karnataka RERA.
We have not collected the layout plan drawing; the developer’s sales team can share it.
Upkar Habitat completion date and development status
Timeline
- 11 May 2015Main registration: Project start date given to RERA
- 5 Dec 2017Main registration: Registered with Karnataka RERA
- 31 Jul 2018Main registration: Completion date given at registration
- 5 Dec 2019Phase 2: Project start date given to RERA
- 29 Jan 2020Main registration: Promoter applied to RERA for completion
- 22 Jul 2020Phase 2: Registered with Karnataka RERA
- 31 Mar 2021Phase 2: Completion date given at registration
- 10 Jun 2021Phase 2: Promoter applied to RERA for completion
- 1 Sep 2024Phase 3: Project start date given to RERA
- 20 Dec 2024Phase 3: Registered with Karnataka RERA
- 30 Dec 2029Phase 3: Completion date given at registration
Construction pace from RERA quarterly filings (Phase 3)
At the average pace so far, construction would reach 100% around Oct 2026 — about 38 months before the completion date on RERA (30 Dec 2029).
At the pace between the 4 quarterly filings we have (60% → 98% in 9 months), it would be around Oct 2026 — about 39 months before the RERA date.
This project has 3 RERA registrations; the chart uses Phase 3, the one with the most quarterly filings.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Developed | Plots booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 15 Oct 2026 | 98% | — |
| Q1 2026-27to 30 Jun 2026 | 15 Jul 2026 | 85% | — |
| Q4 2025-26to 31 Mar 2026 | 15 Apr 2026 | 65% | — |
| Q3 2025-26to 31 Dec 2025 | 31 Mar 2026 | 60% | — |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 98% ÷ 24.9 months (1 Sep 2024 to 30 Sep 2026) = 3.9% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 2 ÷ 3.9 = 0.5 months → Oct 2026. This is an estimate, not a date from the builder or RERA.
Pace between filings = (98% − 60%) ÷ 9 months = 4.2% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Layout plan (Main registration) | BMRDA - Bangalore Metropolitan Region Development Authority | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Layout plan (Phase 2) | BMRDA - Bangalore Metropolitan Region Development Authority | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Layout plan (Phase 3) | BMRDA - Bangalore Metropolitan Region Development Authority · No. STRRPA/TP/LAO/09/2023-24 · dated 2024-05-27 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (5 orders) (Phase 3) | DC- BANGALORE · No. 511276 and 4 more · dated 2023-08-04 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate (Phase 3) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan (Phase 3) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan (Phase 3) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA (Phase 3)
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BMRDA - Bangalore Metropolitan Region Development Authority · No. STRRPA/TP/LAO/09/2023-24 · dated 27 May 2024
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBNot on RERA yet
- Water and sewerage · BWSSBNot on RERA yet
- Electricity · BESCOMNot on RERA yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 16 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). Each phase is registered separately; this list is for the phase named above. The project page on RERA lists each upload.
Upkar Habitat RERA complaints
No complaints listed on Karnataka RERA for these registrations as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Upkar Developers
- Promoter type
- Partnership Firm
- Projects on this site
- 1
- RERA complaints against promoter
- 0
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (16 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Upkar Developers’s RERA recordUpkar Developers delivery record
- 1Projects in Bengaluru on RERA3 approved registrations under Upkar Developers in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 644Plots registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 plots0 complaints ÷ 644 plots in its 3 registrations on Karnataka RERA in Bengaluru.
- 2Completion filed on RERARegistrations where the promoter applied to RERA for completion; 0 with an occupancy certificate on RERA.
- 0 of 2Filed by the date given at registrationMedian gap 10.2 months (on-time ones count as 0). The completion application can come after handover, so this is an upper bound on lateness.
Completion filed on RERA
| Project | Date at registration | Completion filed | Gap |
|---|---|---|---|
| Upkar Habitat Phase 2 | 31 Mar 2021 | 10 Jun 2021 | 2 months after |
| Upkar Habitat | 31 Jul 2018 | 29 Jan 2020 | 18 months after |
Measured against the completion date given at registration; many projects had RERA extensions (including the COVID-period extension), shown under the date.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since May 2015
- 15 Oct 2026Phase 3: Quarterly update filed for Q2 2026-27: 98% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Phase 3: Quarterly update filed for Q1 2026-27: 85% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Phase 3: Quarterly update filed for Q4 2025-26: 65% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 31 Mar 2026Phase 3: Quarterly update filed for Q3 2025-26: 60% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 20 Dec 2024Phase 3: Registered with Karnataka RERA (PRM/KA/RERA/1251/308/PR/201224/007308); completion date 30 Dec 2029 Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Sep 2024Phase 3: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 27 May 2024Phase 3: Building plan approved by BMRDA - Bangalore Metropolitan Region Development Authority (No. STRRPA/TP/LAO/09/2023-24) Source (rera.karnataka.gov.in) (opens in a new tab)
- 10 Jun 2021Phase 2: Promoter applied to RERA for completion Source (rera.karnataka.gov.in) (opens in a new tab)
- 22 Jul 2020Phase 2: Registered with Karnataka RERA (PRM/KA/RERA/1251/308/PR/200722/003485); completion date 31 Mar 2021 Source (rera.karnataka.gov.in) (opens in a new tab)
- 29 Jan 2020Main registration: Promoter applied to RERA for completion Source (rera.karnataka.gov.in) (opens in a new tab)
- 5 Dec 2019Phase 2: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 5 Dec 2017Main registration: Registered with Karnataka RERA (PRM/KA/RERA/1251/308/PR/171205/001374); completion date 31 Jul 2018 Source (rera.karnataka.gov.in) (opens in a new tab)
- 11 May 2015Main registration: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Plot loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
Upkar Habitat FAQs
What plot sizes are available in Upkar Habitat Phase 3?
Phase 3 offers plots of 30×40 ft (1,200 sq ft, 53 plots), 30×50 ft (1,500 sq ft, 23 plots), and 61 odd-sized plots. Sizes of the odd-sized plots are not in the RERA record.
How many plots are in each phase of Upkar Habitat?
Phase 1 (Main registration) has 419 plots, Phase 2 has 88 plots, and Phase 3 has 137 plots, totalling 644 plots.
What is the RERA registration number for Upkar Habitat Phase 3?
Phase 3 is registered as PRM/KA/RERA/1251/308/PR/201224/007308.
When will Upkar Habitat Phase 3 be completed?
The completion date on RERA is 30 December 2029.
Who approved the layout for Upkar Habitat?
The layout was approved by BMRDA (Bangalore Metropolitan Region Development Authority).
How many land conversion orders were issued for Upkar Habitat Phase 3?
5 land conversion orders were issued for Phase 3.
What is the development progress of Upkar Habitat Phase 3?
As of Q2 2026-27 (quarter ended 30 September 2026), the layout development is 98% complete.
Are there any RERA complaints filed against Upkar Habitat or Upkar Developers?
No RERA complaints have been filed on this project or against the developer.
Where is Upkar Habitat located?
Upkar Habitat is in Balluru, Anekal taluk, Bengaluru Urban district, PIN code 560092.
What is the status of Upkar Habitat's earlier phases?
Phase 1 was registered on 5 December 2017 with a completion date of 31 July 2018; Phase 2 was registered on 22 July 2020 and marked as Completed on RERA with a completion date of 31 March 2021.
Written by AI from the RERA record above on 17 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Upkar Habitat
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a plot from Upkar Developers? Review the developer.
Reviews of Upkar Developers by verified buyers
No verified reviews of Upkar Developers yet. If you bought a plot from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the developer may reply.
Similar projects within 5 km
| Project | Distance | Plots | Completion (RERA) | Developed | Complaints | Price |
|---|---|---|---|---|---|---|
| Oasis Lakeview ResidencySsy Developers | 3.8 km | 125 | Aug 2026 | 100% | 0 | Not collected |
| Mahidhara CMR PPR Fortune CityMahidhara Projects Private Limited | 4.3 km | 384 | Oct 2026extended | 98% | 0 | Not collected |
| Himagiri AvenueB Rama Devi | 4.6 km | 123 | Mar 2025 | 100% | 0 | Not collected |
| Himagiri VistaB Rama Devi | 4.8 km | 28 | Mar 2026 | 100% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the developer’s own website where we found one.
Sources and last checked dates
Collected on 16 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration numbers: PRM/KA/RERA/1251/308/PR/171205/001374, PRM/KA/RERA/1251/308/PR/200722/003485, PRM/KA/RERA/1251/308/PR/201224/007308.
- RERA record last checked: 16 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 16 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the developer’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects nearby
Lakshmi Sagar, Sarjapur–Attibele RoadUnder constructionRERA registeredBuyers’ group openOasis Lakeview Residency
by Ssy
Price: Price on requestGet brochure & price →
- 30×40, 30×45, 30×50 +1 more
- 816 – 3,745 sq ft plots
- Approved by Local Planning Authority
- Aug 2026
RERA not updated since promised Aug 2026 · 125 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Oasis Lakeview Residency
Chikkanahalli, Sarjapur–Attibele RoadUnder constructionRERA registeredBuyers’ group openMahidhara CMR PPR Fortune City
by Mahidhara
Price: Price on requestGet brochure & price →
- 30×40, 30×50, 40×50 +1 more
- 909 – 6,403 sq ft plots
- Approved by Local Planning Authority
- Oct 2026 (extended)
384 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Mahidhara CMR PPR Fortune City
Chikkanahalli, Sarjapur–Attibele RoadUnder constructionRERA registeredBuyers’ group openHimagiri Avenue
by B Rama Devi
Price: Price on requestGet brochure & price →
- 30×40, 30×50
- 794 – 3,380 sq ft plots
- Approved by BMRDA
- Mar 2025
RERA not updated since promised Mar 2025 · 123 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Himagiri Avenue