Vanantara Nirvana
Commercial project by Vanantara Estates Private Limited · Richmond Road, Bengaluru
Richmond Road, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- commercial
by Vanantara Estates Private Limited
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Vanantara Nirvana at a glance
- Possession (RERA)Mar 2028Karnataka RERA
- Construction42% built · on pace for Mar 2029 12 mo after RERA dateRERA filing to 30 Sep 2026; estimate from average pace
- Homes booked2 of 6 (33%)RERA update · as on 30 Sep 2026
- RERA complaints (project)None listedKarnataka RERA · as on 16 Oct 2026
- Approvals filed7 of 9 on RERAKarnataka RERA uploads · 16 Oct 2026
- Nearest metroRashtriya Military School Metro Station · 0.82 km (under construction)Open now: Mahatma Gandhi Road, 1.57 km · straight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 116 min at peak28.74 km straight line · estimate
- Nearest lakeSampangi Lake · 1,135 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Vanantara Nirvana is a commercial project by Vanantara Estates Private Limited in Bengaluru with 6 homes, registered with Karnataka RERA. The completion date on RERA is 31 Mar 2028.
Not in the RERA record we collected yet: locality. This page fills in as the record is collected.
Facts collected on 16 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Vanantara Nirvana buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Vanantara Estates Private Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Vanantara Nirvana buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- Not found in public records yet: home types
- Carpet area
- 4,560 – 6,717 sq ft
- Towers
- 1
- Floors
- 5
- Total homes
- 6
- Land
- 0.43 acres
- Possession (RERA)
- Mar 2028
- Built (RERA update)
- 42%
Vanantara Nirvana RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/446/PR/131224/007291
- Registered on
- 13 Dec 2024
- Promised completion
- 31 Mar 2028
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- 2 of 6 as on
- Price
- Not found in public records yet: price
- Project type
- Commercial
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| Vanantara Nirvana | 5 | 2 | 6 |
A dash (—) means the filing did not state that value.
Summary in plain English
Vanantara Nirvana is a commercial project by Vanantara Estates Private Limited in Bengaluru East with 6 commercial units in 1 tower. The project is registered with Karnataka RERA and is scheduled for completion on 31 March 2028.
Written by AI from the RERA record above on 16 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 63.3% of land
- Water and power
- Water source filed with RERA: BWSSB
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- KOTAK MAHINDRA BANK, Koramangla
- Building plan (RERA)
- BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Addl.Dir/JDNORTH/0011/23-24 · dated 12 Jul 2024
- Project cost declared to RERA
- ₹56.2 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Vanantara Nirvana location and address
- Address
- Municipal No. 08, BBMP PID No.76-32-8, , situated at O’Shaughnessy Road, Shantalanagar (Old Ward No.76-Richmond Town), Bengaluru , Bengaluru East , Bengaluru Urban, Karnataka - 560025
- Village (RERA)
- Not found in public records yet: village
- Locality
- Richmond RoadAlso known as Richmond Town
- PIN code
- 560025
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.96321, 77.59968
Distances to landmarks
Not found in public records yet: landmarksAbout Richmond Road
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 3.66 km | approx. 15 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 9.69 km | approx. 39 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 9.87 km | approx. 40 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 14.47 km | approx. 59 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 15.21 km | approx. 62 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 28.74 km | approx. 116 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 110Schools and colleges74 schools, 30 colleges, 6 kindergartens
- 70Hospitals and clinics43 hospitals, 27 clinics
Nearest schools and colleges
- Baldwin Girls' High School · 0.15 km
- Baldwin Women's Methodist College · 0.2 km
- Baldwin Opportunity School · 0.23 km
Nearest hospitals and clinics
- Orthodontic Maxillofacial Clinic · 0.15 km
- Daksh Eye Care Centre · 0.17 km
- Republic Hospital · 0.19 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Rashtriya Military School Metro Station (ರಾಷ್ಟ್ರೀಯ ಮಿಲಿಟರಿ ಶಾಲೆ)Pink Line metro, under construction0.82 km
- Langford Town (ಲ್ಯಾಂಗ್ಫೋರ್ಡ್ ಟೌನ್)Pink Line metro, under construction1.02 km
- Mahatma Gandhi Road (ಮಹಾತ್ಮ ಗಾಂಧಿ ರಸ್ತೆ)Open now — nearest operating metro station1.57 km
- Bangalore Cantonment (ಬೆಂಗಳೂರು (ಕಂಟೊನ್ಮೆಂಟ್))Nearest railway station3.39 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Sampangi Lake, 1,135 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Sampangi Lake on OpenStreetMap (opens in a new tab) (ಸಂಪಂಗಿ ಕೆರೆ)1,135 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Vanantara Nirvana floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Brochure18 pages

BrochureFull PDF on RERA 






Approved building plan2 files

Approved Building/Plotting PlanFull PDF on RERA 
Area Development Plan Of Project AreaFull PDF on RERA
Approved layout plan2 files

Approved Layout PlanFull PDF on RERA 
Existing Layout PlanFull PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| Commercial | 4,560 – 6,715 sq ft | 5 |
| Na | 4,560 sq ft | 1 |
| Office | 4,564 – 6,717 sq ft | 5 |
| Retail | 4,564 sq ft | 1 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Vanantara Nirvana possession date and construction status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
Units sold and unsold, from RERA (Q2 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| COMMERCIAL | 5 | 2 | 3 |
| NA | 1 | 0 | 1 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 13 Dec 2024Registered with Karnataka RERA
- 16 Dec 2024Project start date given to RERA
- 31 Mar 2028Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Mar 2029 — about 12 months after the completion date on RERA (31 Mar 2028).
At the pace between the 4 quarterly filings we have (25% → 42% in 9 months), it would be around Apr 2029 — about 13 months after the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 15 Oct 2026 | 42% | 2 of 6 |
| Q1 2026-27to 30 Jun 2026 | 15 Jul 2026 | 30% | 2 of 6 |
| Q4 2025-26to 31 Mar 2026 | 15 Apr 2026 | 30% | 2 of 6 |
| Q3 2025-26to 31 Dec 2025 | 14 Jan 2026 | 25% | 0 of 6 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 42% ÷ 21.5 months (16 Dec 2024 to 30 Sep 2026) = 2% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 58 ÷ 2 = 29.6 months → Mar 2029. This is an estimate, not a date from the builder or RERA.
Pace between filings = (42% − 25%) ÷ 9 months = 1.9% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
15 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Building plan | BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Addl.Dir/JDNORTH/0011/23-24 · dated 2024-07-12 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion | BDA · No. BDA/TPM/CLU-03/20-21/2769/2022-23 · dated 2023-01-17 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Change of Land Use | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Addl.Dir/JDNORTH/0011/23-24 · dated 12 Jul 2024
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 16 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Vanantara Nirvana RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Vanantara Estates Private Limited
- Promoter type
- Company
- Projects on this site
- 1
- RERA complaints against promoter
- 0
- Company number (CIN)
- U74999KA2019PTC130253
From Karnataka RERA, as collected so far (16 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Vanantara Estates Private Limited’s RERA recordVanantara Estates Private Limited delivery record
- 1Projects in Bengaluru on RERA1 approved registration under Vanantara Estates Private Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 6Homes registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 homes0 complaints ÷ 6 homes in its 1 registration on Karnataka RERA in Bengaluru.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Jul 2024
- 15 Oct 2026Quarterly update filed for Q2 2026-27: 42% built, 2 of 6 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Quarterly update filed for Q1 2026-27: 30% built, 2 of 6 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Quarterly update filed for Q4 2025-26: 30% built, 2 of 6 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Jan 2026Quarterly update filed for Q3 2025-26: 25% built, 0 of 6 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 16 Dec 2024Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 13 Dec 2024Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/131224/007291); completion date 31 Mar 2028 Source (rera.karnataka.gov.in) (opens in a new tab)
- 12 Jul 2024Building plan approved by BBMP - Bruhat Bengaluru Mahanagara Palike (No. BBMP/Addl.Dir/JDNORTH/0011/23-24) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
Vanantara Nirvana FAQs
What is Vanantara Nirvana?
Vanantara Nirvana is a commercial project in Bengaluru East with 6 commercial units including offices, retail, and other commercial spaces.
How many homes are in Vanantara Nirvana?
The project has 6 commercial units.
What types of commercial units are available in Vanantara Nirvana?
The project offers 5 office units, 1 retail unit, and other commercial spaces ranging from 4,560 to 6,717 sq ft carpet area.
What is the carpet area range in Vanantara Nirvana?
Carpet areas range from 4,560 to 6,717 sq ft depending on the unit type.
When will Vanantara Nirvana be completed?
The project is scheduled for completion on 31 March 2028 according to the RERA record.
What is the RERA registration number for Vanantara Nirvana?
The RERA registration number is PRM/KA/RERA/1251/446/PR/131224/007291.
What is the construction progress of Vanantara Nirvana?
As of Q2 2026-27, the project is 42 percent complete with 2 units booked out of 6 total units.
Are there any RERA complaints against Vanantara Nirvana?
There are no complaints filed against this project on the RERA record.
Where is Vanantara Nirvana located?
The project is located in Bengaluru East, Bengaluru Urban district, PIN code 560025.
What bank is handling the escrow for Vanantara Nirvana?
Kotak Mahindra Bank is the escrow bank for this project.
Written by AI from the RERA record above on 16 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Vanantara Nirvana
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Vanantara Estates Private Limited? Review the builder.
Reviews of Vanantara Estates Private Limited by verified buyers
No verified reviews of Vanantara Estates Private Limited yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Sources and last checked dates
Collected on 16 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/446/PR/131224/007291.
- RERA record last checked: 16 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 16 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Richmond Road
- Bilekahalli, Bannerghatta Road© Esri, Maxar, Earthstar GeographicsReady to moveRERA registeredBuyers’ group open
Vaishnavi Senate
by Vaishnavi Infrastructure
Price: Price on requestGet brochure & price →
- Types not found
- 9,838 – 43,551 sq ft
- Dec 2026
11 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Vaishnavi Senate - Hebbal Amanikere, Hebbal© Esri, Maxar, Earthstar GeographicsReady to moveRERA registeredBuyers’ group open
Shriram Hebbal 1
by Shriram Upscale Space
Price: Price on requestGet brochure & price →
- Types not found
- 6,351 – 24,111 sq ft
- Jan 2027
9 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Shriram Hebbal 1
Doddakalasandra, Kanakapura RoadUnder constructionRERA registeredBuyers’ group openPurva Zentech
by Purva Ruby Properties
Price: Price on requestGet brochure & price →
- Types not found
- 2,906 – 57,490 sq ft
- Jun 2027
18 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Purva Zentech